Balanço e Perspectivas das Concessões em Infraestrutura Helcio Tokeshi – GP Investimentos Casa das Garças, Rio de Janeiro, 22 de agosto de 2014 Should it take decades to build a subway? Salon, Saturday, Feb 4, 2012 On Dec. 31, the Chinese capital opened a new subway line and greatly expanded two others. This year it plans to open four more. A total of eight new lines are under construction. The city started expanding the system in the run-up to the 2008 Olympics, and has kept pushing forward ever since. In 2001 it had 33 miles of track. Today it has 231. Meanwhile, when you hear the completion dates for big U.S. transit projects you often have to calculate your age to figure out if you'll still be alive. Los Angeles's Westside subway extension is set to be finished in 2036. Just five years ago, New York's Second Avenue Subway was supposed to be done by 2020, a goal that seems laughable now. Why do big infrastructure projects take so long? By Ross Hawkins Political correspondent BBC News - 27 June 2014 It was in 1802 that a tunnel under the channel between France and Britain was first suggested to Napoleon. It took a mere 192 years before the idea became a reality. A decade ago, under Labour, a government white paper declared a new runway at Heathrow would - in principle - be supported. Today, the government and opposition alike wait on another report on the subject. Its conclusions are not due until after the election in 2015. 1 Para evitar a autoflagelação – projetos privados Amostra de 318 projetos Fonte: Merrow, E. W. (2012, April 1). Oil and Gas Industry Megaprojects: Our Recent Track Record. Society of Petroleum Engineers. doi:10.2118/153695-PA 2 Para evitar a autoflagelação – projetos públicos Amostra de 806 projetos Fonte: Cantarelli, C. C., Flyvbjerg, B, and Buhl, S. L. 2012. Geographical Variation in Project Cost Performance: The Netherlands versus Worldwide. Journal of Transport Geography, 24: 324–331 3 Onde estamos - aeroportos 4 echos para Concessão: 9 Lotes - 7,5 mil km Onde estamos - rodovias 3 4 5 6 7 ra no Brasil: Projetos, Financiamentos e Oportunidades 3 6 5 4 7 5 10 mil km Onde estamos – ferrovias e portos ura no Brasil: Projetos, Financiamentos e Oportunidades 6 PPPs Federais e Estaduais Federal and state PPP evolution in Brazil 125 Distribution of the 184 projects by phase in 2013 85 184 62 32 33 26 25 59 2011 - 2013 9 23 2004 - 2010 2004 - 2010 2011 – 2013 Total Number of PPPs in Brazil 8 6 7 2 Planning Study Public Hearing Auction 17% 46% 18% 5% 4 2 2 Selection 2% 10 3 7 11 11 Sign Operational Contract 5% 6% • In the first 6 years after the PPP law, there were ~8-10 projects/year • After 2011, the average increased to 40 projects/year • 30% from the PPP projects from 2004-2010 signed contracts and/or started operations Source: adapted from Thamer (2013) 7 PPPs Municipais Municipal PPP evolution in Brazil1 40 Distribution of the 61 projects by phase in 2014 14 61 11 10 2011 - 2014 10 10 9 2 7 6 7 21 9 2004 - 2010 2004 - 2010 2011 – 2014 Total Number of PPPs in Brazil 4 4 3 Planning Study 23% 15% Public Hearing 16% 4 Auction 18% 1 1 Selection 2% 8 2 Sign Operational Contract 10% 16% Source: PPP Brasil and municipal website Note1: not exhaustive 8 PPPs em operação Distribution of the 41 projects by sector Top 20 PPP by Capex (R$ million) 18 PPP 8 5 Sanitation 43% 4 Roof on top Entertainment 20% 12% 3 2 Urban Mobility Real Estate 10% 7% 1 Highway 5% Others 2% Capex (considers 35 projects with figures disclosed) (R$ billion) 11,3 The total capex is around R$34 bn 9,1 8,3 3,1 1,7 Sanitation Entertainment Roof on top 0,3 0,1 Highway Others Urban Mobility Real Estate 42% 33% 12% 6% 5% 1% 1% 2,8 3,0 0,6 0,6 0,2 0,2 0,1 Capex City / State Porto Maravilha no Rio de Janeiro 7.600 Rio de Janeiro Linha 6 Metrô SP 7.000 SP Água e Esgoto Recife e Goiana 4.314 PE Linha 4 Metrô SP 2.200 SP VLT Rio de Janeiro 1.100 Rio de Janeiro Linha 8 Trem SP 993 SP Conjunto Habitacional Mangueiral 933 DF Novo Mineirão 850 MG Estádio Fonte Nova 714 BA Estádio Fortaleza 623 CE Resíduos Sólidos Paulista 602 Paulista Resíduos Sólidos São Bernardo 600 São Bernardo Água e Esgoto Atibaia 539 Atibaia Arena Pernambuco 533 PE Parque Olímpico do Rio de Janeiro 525 Rio de Janeiro Centro Administrativo GDF 424 DF Estádio Natal 400 RN Água e Esgoto Paraty 369 Paraty Centro de Ressocialização Itaquitinga 350 PE Resíduos Sólidos Manaus 340 Manaus Capex R$/PPP 9 Uma mudança na forma de pensar em infraestrutura De: Foco na obra Para: Foco no serviço – Projeto ancorado na solução de engenharia – Sustentabilidade do serviço como condição essencial da financiabilidade – Operação e manutenção resolvidos a posteriori – Mais graus de liberdade na estruturação do contrato dado que riscos podem ser alocados entre agentes públicos e privados – Viés para construir com excesso de capacidade – Viés para sobreespecificação – Relação adversarial com fornecedores – Flexibilidade e incentivos à inovação e incorporação de melhores soluções tecnológicas e de gestão – Contratos relacionais de longo-prazo – Regulação dos contratos requer mais transparência e diálogo com a sociedade durante o desenvolvimento do projeto e execução do contrato • • - Avanços no processo licitatório: Inversão de fases e qualificação simplificada Leilões simultâneos Novos mecanismos contratuais: Gatilhos de investimento Parâmetros de desempenho Metas de segurança 10 Comparação da tarifa-teto dos lotes leiloados Consulta pública* Edital Resultado do leilão -38% -15% 9.27 9.22 -13% 7.87 -42% 5.21 7.10 -15% -17% 5.94 5.50 -46% -53% 5.84 4.98 4.53 3.17 2.64 Lote 4 - BR050 -52% -52% 3.36 Lote 7 - BR 163 MT 4.38 2.85 Lote 5 - BR060 * TIR de 5,5%, PIB de 4,5% e elasticidade Logit ** Tarifa da consulta pública considera os trechos das BRs 262 e 267 *** Tarifa da consulta pública antes da redução da extensão Lote 6 BR-163 MS ** Lote 3 - BR-153 *** 11 Dois modelos básicos de desenvolvimento de infraestrutura ILUSTRATIVO Capacidade vs demanda de infraestrutura Planejamento e execução estatal Q t Sinalização via mercado Q t 12 Para onde vamos? Problemas de fluxo Setores Questões a serem resolvidas • Telecom • Balanço entre incentivos à concorrencia e ao • Energia elétrica investimento • Melhoria da sinalização de preços para investimentos em capacidade de base • Água Déficit de estoque equacionado • Esgoto residencial • Financiamento dos pequenos municípios • Resíduos industriais • “Enforcement” • Aeroportos • Estradas • Portos Déficit crônico • Resíduos sólidos • Planejamento integrado das redes • Modelo de operação e manutenção de ativos menores • Coordenação entre municípios menores e mudança de tecnologia em regiões metropolitanas • Transporte urbano de alta capacidade • Ferrovias • Hidrovias • “Captura de valor” (value capture) • Planejamento integrado das redes • Discretização do investimento e plataformas de integração • Garantias para pagamentos por disponibilidade 13