Gaia Group CEO LUIZ GERMANO BODANESE Established: 2002 Area: Real State Team: 13 people Established: 2010 Area: Sports Team: 9 people Established: 1995 Area: Oil & Gas Team: 50 people Legal Administrative Exploration Offshore Onshore Strategic Planning Seismic Data Acquisition and Processing Production and Shipping Gas & Energy Market Intelligence Drilling and Intervention Seismic Data Library Refineries and Petrochemical People Development Interpretation G&G New Business Riser e Pipelines Subsea Equipment Construction, Assembly and Manufacture Shipyards and Modules Main Executives Name LUIZ GERMANO BODANESE CEO Education Mechanical Engineering (UFRGS) Business Management (UFRGS) Geology (UFRJ) LUIZ FERNANDO LOPES NEVES Exploração Director Master in Marine Geology (Tokyo University) Oil & Gas MBA (COPPE/UFRJ) Engineering (Makenzie-SP) CRISTIAN JATY SILVA Onshore Director RAFAEL LOUZADA BODANESE Offshore Director Finance MBA (USP) Extension in Sustainability (Don Cabral) Business Management (IBMECRJ) Master in Economy (IBMEC-RJ) Track Record CEO of PGS do Brasil, leader company on seismic data acquisition in Brazil (19952006). PETROBRAS (1980-1993): Production Manager of Marlin Platform. Purchase Manager of Petrobras holding. Implementation of Petrobras America purchase area (Houston, TX). Supply Manager for Campos Basin. Co-founder of GAIA. Country Manager Data Management of PGS, responsible for the execution of National Oil & Gas Data Bank (1997-2001). Worked on geophysics projects in the North Sea, Gulf of Mexico, Africa and South America (before 1997). Geophysics Operations Manager at Promon consortium. 30 years experience in base industry President of Jaraguá Equipamentos Industriais (2005-2010). Director of Bardella Indústrias Mecânicas (1982-2005). Vice-President of ABIMAQ (Brazilian Association of Machinery and Equipment Industry). Director da ABEMI (Brazilian Association of Industrial Engineering). Development of joint-ventures with foreign companies. Creation of business units, focused on the diversification of Gaia Group. Responsible for repositioning Gaia Group, organizational restructuration and spin-off of business units . GAIA Seismic and Well Data Base Wells: 1,765 864 onshore 901 offshore 3D Seismic: 35,415 km² 31,307 km² offshore 4,088 km² onshore 2D Seismic: 263,876 km 213,730 km offshore 50,146 km onshore Experience Gaia Group foundation Establishing PGS in Brasil Installation of the first SCR (Steel Catenary Riser) on a Semi-Submersible in the world Recovery of Petrobras legacy seismic data acquired in Brasil until 1998 First contract for seismic multiclient, being pioneer on environmental license Implementation of the E&P National Databank Reprocessing 2D and 3D seismic data for all Brazilian basins Salvage of P-34 platform in Campos Basin Implementation of the biggest Data Center of Latin America First Revamp in courtyard of sotrage of coke in a refinary 1995 1997 1999 2000 2002 2003 2004 2006 2007 2008 DPP unit for Cacimbas Chartering of the first FPSO with technology for produce 12º API oil Sale of onshore hydraulic drilling rigs Pipelaying on Espírito Santo waters Construction and assembly of 4 compression stations (Piúma, Aracruz, Alcobaça e Capão Bonito) Sale of compact heat exchangers for Tupi Pilot I, P -55, P-57, P-58 e P-62 Sale of subsea equipment for Pre-Salt First contract of seismic monitoring with permanent intalations (Jubarte field) Chartering of an FPSO for Tiro-Sidon field Contract for construction of two light intervention vessel (SS) 2009 2010 Brazil – Suppliers Challenges Pre-Salt: The New Frontier Pre- Salt Main Challenges Water Depth about 2,200 m (risers and thermal insulated flowlines qualifications, moorings etc.) Well depth (~ 5,000-7,000 m) Salt layers with thickness up to 2,000 m CO2 resistance (~ 8 - 18%) H2S resistance (~ 200 ppm) High pressure (initial ~ 580 kgf/cm2) Secondary recovery Paraffin deposition, hydrate control and scaling control 300 km distance to shore (long and large diameter gas pipelines) Scenario for new technologies offshore: LNG, CNG, GTL, GTW etc. Scenario for riser towers, SCRs with LW and other technologies Scenario for platforms with access to the wells (SPAR, FPDSO, MCF etc.) WD Some of Our Projects Private Equity Fund for O&G Suppliers Gaia has a partnership with the fund manager Valora, working as the technical consultant for a private equity fund dedicated to Brazilian suppliers of the O&G market. The fund will raise around US$ 500 million, to be invested on 5 to 8 companies. Opportunity for Brazilian Forging Sector The Brazilian Government (BNDES, FINEP etc) wants to improve the domestic oil & gas industry, including the forging sector. Main Idea: introduction of a new forging player in Brazilian Market, with high degree of local content. Import technologies and production processes not available in Brazil (partnerships with strategic players). Alignment of interests throughout value chain, establishing a business composed by suppliers, manufacturers and distributors. Joint Ventures HORTON DO BRASIL Technology development company TRENDSETTER DO BRASIL Leader in Contemporary Subsea Solutions Business Portfolio Sales Representative Joint Venture Specific Contracts Rua Victor Civita nº 77 Bloco 1 Ed. 6.2 5º andar Cond. Rio Office Park Barra da Tijuca Rio de Janeiro RJ +55 21 3311-6200 www.gaia-br.com.br The Solution Team Established in 1995 and composed by a highly skilled team of 50 professionals, with full knowledge over the entire Petroleum chain, Gaia is ready to support companies to understand Oil & Gas market in Brazil. Adding information and intelligence we can support companies to define business strategies, for goods and services: Support investment on E&P Companies Technologies and innovatory solutions for Pre-Salt; Customized projects for operational challenges; Economical feasibility studies – FEL 1 Understand the regulatory requirements.