•SLB and DCC commissioning for 904
OFF DETECTOR WORSHOP, April 7, 2005, Lisboa
José C. Da Silva
•SLB commissioning for 904
OFF DETECTOR WORSHOP, April 7, 2005, Lisboa
José C. Da Silva
SLB Production Status
•SLB Production (1210 Boards)
•Pre production assembly of 100 Boards just arriving to CERN.
•JTAG test bench (Infra + Inter) working!
•SLB Output has to have 2 output formats
: STC and RC (software controlled)
•Firmware in final test stage, BIST!
•Assembly of the remaining boards will follow after acceptance
of the 1st batch. Being delivered to CERN this week!
• Full Production of the PCBs had some delay !
(PCB Production Frames Quality)
OFF DETECTOR WORSHOP, April 7, 2005, Lisboa
José C. Da Silva
SLB PCB Production Frame
OFF DETECTOR WORSHOP, April 7, 2005, Lisboa
José C. Da Silva
904 commissioning
•100 SLBs tested by end of APRIL!
•HCAL ok! ECAL ok!
•Cables to be ordered soon!
•(25 minimum), connectors from WU
•decision on length (10m)
OFF DETECTOR WORSHOP, April 7, 2005, Lisboa
José C. Da Silva
•DCC commissioning for 904
OFF DETECTOR WORSHOP, April 7, 2005, Lisboa
José C. Da Silva
DCC Pre Production Status
•DCC Pre Production (8 Boards)
•1 DCC “kit” in 867 (H4 conditions)
-Recabling done
• Pre production assembly 8 Boards!
-Processing (BARCO)
• Production of the PCBs had 1 weeks delay !
-CERN procedures adds a 2 week delay + Easter!
• DCC Tester Firmware Revision
-Ordered 35 NGKs TX
• Start DCC tests in end of April/May
• DCC mechanics “a la HCAL”
-Front Panel production
•Progressive DCC delivery -> May -> July
OFF DETECTOR WORSHOP, April 7, 2005, Lisboa
José C. Da Silva
DCC V1
OFF DETECTOR WORSHOP, April 7, 2005, Lisboa
José C. Da Silva
DCC distribution
•DCC Prototypes:
•1 Bldg 867
•1 RPC Group
•DCC Pre Production (8 Boards)
• 3 DCC for 867
•Will be used as production spares !
• 1 DCC for Cosmic Tests (H4),
• 2 DCC for Magnet tests,
• 1 DCC (Lab)
• 1 DCC Preshower (?), spare.
• 1 DCC , PCB only, for TOTEM
OFF DETECTOR WORSHOP, April 7, 2005, Lisboa
José C. Da Silva
DCC vs SM10 Integration at 867
OFF DETECTOR WORSHOP, April 7, 2005, Lisboa
José C. Da Silva
Commissioning for 904
•
CCS (Kostas)
•
•
DCC
•
•
TTC emulator/encoding
70 Channels + SR
Slink 64 (FEDKIT)
•
Slink adaptor
(PCB full production done!)
•
OD Backplane
•
•
VME Bridge (SBS620)
•
OFF DETECTOR WORSHOP, April 7, 2005, Lisboa
Pre-production of 10 (ongoing)
Crate Configuration
José C. Da Silva
Commissioning for 904 (2)
•
New DCC Tester and TCC Tester production
Main Board redesign and production!
Production of 9 Optical Modules
Assembly of all and tests.
•
•
•
OFF DETECTOR WORSHOP, April 7, 2005, Lisboa
35 NGK 8ch TX Special Production
3 Months delivery time, 40 k USD
MANPOWER Availability!!!
no NEW testers available Before OCTOBER!
José C. Da Silva
Ongoing/Planning
SLB
• JTAG test bench ready
• Production tests of the SLBs
• SLB Cables for 904
DCC
• Support ongoing tests on 867 with DCC#1
• Pre-Production and tests of 8 DCC
• Pre-Production of OD Backplanes
• Slink Adaptors Assembly
OFF DETECTOR WORSHOP, April 7, 2005, Lisboa
José C. Da Silva