Remote control tower: risk assessement
for small and medium sized airports
Laércio Quintanilha Fogaça Júnior
MSc Student
Safety Analysis Group (GAS)
Computer and Digital Systems Engineering Department (PCS)
School of Engineering (Escola Politécnica - Poli)
University of São Paulo (USP)
São Paulo, Brazil
Universidade de São Paulo
Brasil
1
http://www.gas.pcs.poli.usp.br/
Index
• Introduction (or why research it);
• Gols for this research;
• Major expected challenges in this research;
• How I do intend engage these challenges.
Universidade de São Paulo
Brasil
2
http://www.gas.pcs.poli.usp.br/
Introduction (or why research it)
• Introduction (or why research it);
• Gols for this research;
• Major expected challenges in this research;
• How I do intend engage these challenges.
Universidade de São Paulo
Brasil
3
http://www.gas.pcs.poli.usp.br/
Introduction (or why research it)
http://economia.estadao.com.br/noticias
/geral,a-infraestrutura-precaria-ameacao-transporte-aereo-imp-,552363
http://www.agenciaabear.com.br/hotnews-4/infraestrutura-e-impostos-sao-desafiospara-a-aviacao-nos-proximos-anos/
http://www.brasil.gov.br/infraestrutura/2014/06/na-ultima-decadatransporte-aereo-registrou-crescimento-3-5-vezes-maior-do-que-o-pib
http://www.bndes.gov.br/SiteBNDES/bndes/bndes_pt/Institucional/Apoio_Fin
anceiro/Apoio_a_estudos_e_pesquisas/BNDES_FEP/prospeccao/chamada_
aereo.html
Universidade de São Paulo
Brasil
http://zh.clicrbs.com.br/rs/noticias/economia/noticia/2010/07/setor-detransporte-aereo-de-carga-enfrenta-falta-de-infraestrutura-2960597.html
4
http://www.gas.pcs.poli.usp.br/
Introduction (or why research it)
http://www.iata.org/pressroom/pr
/pages/2010-02-01-01.aspx
http://www.infrastructureafrica.org/sectors/air-transport
http://www.bnamericas.com/news/privatization/lack
-of-proper-airport-infrastructure-limiting-airtransport-boom/
Universidade de São Paulo
Brasil
5
http://www.gas.pcs.poli.usp.br/
Gols for this research
• Introduction (or why research it);
• Gols for this research;
• Major expected challenges in this research;
• How I do intend engage these challenges.
Universidade de São Paulo
Brasil
6
http://www.gas.pcs.poli.usp.br/
Gols for this research
• Raise the main risks involving a remote control tower;
• Propose possible solutions for each one of these risks;
• The result of this research should become a valuable input to further
studies in this area, including but not limited at extensions of this
research and an implementation of remote control tower.
Universidade de São Paulo
Brasil
7
http://www.gas.pcs.poli.usp.br/
Major expected challenges in this research
• Introduction (or why research it);
• Gols for this research;
• Major expected challenges in this research;
• How I do intend engage these challenges.
Universidade de São Paulo
Brasil
8
http://www.gas.pcs.poli.usp.br/
Major expected challenges in this research
• Definition on which processes should be covered by this research;
• Quite few documentation about this kind of technology;
• Lack of believe from some stakeholders about this technology;
• Find out feasible solutions for the main risks encountered having in
count budget limitations and environment constraints.
Universidade de São Paulo
Brasil
9
http://www.gas.pcs.poli.usp.br/
How I do intend engage these challenges
• Introduction (or why research it);
• Gols for this research;
• Major expected challenges in this research;
• How I do intend engage these challenges.
Universidade de São Paulo
Brasil
10
http://www.gas.pcs.poli.usp.br/
How I do intend engage these challenges
• Definition on which processes should be covered by this research;
• Cover the most critical control tower processes (from safety point of
view), preferably the ones which are applied for most of the
countries.
• Quite few documentation about this kind of technology;
• Search in academic and non academic trusted sources.
• Make and document assumptions when needed.
• Lack of believe from some stakeholders about this technology;
• Work with other sources of information.
• When not possible, look for stakeholders who have a different
approach.
Universidade de São Paulo
Brasil
11
http://www.gas.pcs.poli.usp.br/
How I do intend engage these challenges
• Find out feasible solutions for the main risks encountered having
in count budget limitations and environment constraints.
• Keeping in mind that expensive solutions may become infeasible.
Searching for simply and reliable solutions.
• Look for solutions that can be applied for multiple environments and
its particularities, like temperature variation, weather conditions
variation, etc… Most wide range solutions are preferred.
Universidade de São Paulo
Brasil
12
http://www.gas.pcs.poli.usp.br/
Contacts
Please feel free to contact us!
Laércio Quintanilha Fogaça Júnior
[email protected]
Phone: +55 11 98223-5770
João Batista Camargo Júnior
[email protected]
Phone: +55 11 3091-5401
Universidade de São Paulo
Brasil
13
http://www.gas.pcs.poli.usp.br/
Download

Introduction (or why research it) - Sitraer 2014