PORTUGAL, 39.449.922€ - 2004
CONSTRUÇÃO DE EDIFÍCIO UNIVERSITÁRIO COM UMA ÁREA TOTAL DE CONSTRUÇÃO DE
85.000 M². INCLUIRAM-SE NA EMPREITADA OS TRABALHOS DE FUNDAÇÕES, ESTRUTURA,
ACABAMENTOS E INSTALAÇÕES ESPECIAIS.
UNIVERSITY SCHOOL BUILDING WITH A TOTAL CONSTRUCTION AREA OF 85,000 M². FOUNDATIONS,
STRUCTURE, FINISHINGS AND SPECIAL INSTALLATIONS.
ESTÁDIO DE FUTEBOL COM BANCADAS COBERTAS E LOTAÇÃO PARA 30.000 LUGARES SENTADOS.
EDIFÍCIO ESCOLAR COM ÁREA COBERTA DE CONSTRUÇÃO DE 33.000 M² COM 60 SALAS DE AULA COM 80
M² CADA, 16 LABORATÓRIOS, CAMPOS DESPORTIVOS, GINÁSIOS E SALAS PARA DIVERSOS FINS ESCOLARES.
FOOTBALL STADIUM WITH COVERED SEATING AREA AND CAPACITY FOR 30,000 SEATED PLACES.
SCHOOL BUILDING WITH A COVERED CONSTRUCTION AREA OF 33,000 M² WITH 60 CLASSROOMS OF 80 M² EACH, 16
LABORATORIES, SPORTS FIELDS, GYMNASIUMS AND ROOMS FOR VARIOUS EDUCATIONAL PURPOSES.
MIRAMAR HIGH SCHOOL
MIRAMAR HIGH SCHOOL
EUA, 35.477.245€ - 2003
ESTÁDIO DE BRAGA
BRAGA STADIUM
PORTUGAL, 75.154.851€ - 2004
VILA OLÍMPICA E COMPLEXO DE
PISCINAS DOS X JOGOS AFRICANOS
OLYMPIC VILLAGE AND POOL COMPLEX
FOR THE 10TH ALL-AFRICA GAMES
MOÇAMBIQUE, 114.023.177€ - 2011
CONSTRUÇÃO DA VILA OLÍMPICA COMPOSTA POR 848 APARTAMENTOS, TIPOLOGIA T3, NOS QUAIS FORAM
INSTALADAS AS DIVERSAS DELEGAÇÕES DOS DIFERENTES PAÍSES PARTICIPANTES DO EVENTO. FIZERAM AINDA
PARTE DA EMPREITADA A CONSTRUÇÃO DE TODAS AS INFRAESTRUTURAS, BEM COMO DO COMPLEXO DE
PISCINAS OLÍMPICAS COMPOSTO POR UMA PISCINA DE COMPETIÇÕES E UMA PARA TREINOS.
CONSTRUCTION OF THE OLYMPIC VILLAGE, CONSISTING OF 848 3-BEDROOM APARTMENTS, WHERE THE DELEGATIONS FROM
THE VARIOUS COUNTRIES PARTICIPATING IN THE EVENT WERE ACCOMMODATED. THIS CONSTRUCTION PROJECT ALSO
INCLUDED ALL REQUIRED INFRASTRUCTURES, AS WELL AS THE OLYMPIC SWIMMING POOL COMPLEX, CONSISTING OF
COMPETITION POOL AND A TRAINING POOL.
TEATRO CIRCO
CIRCO THEATRE
PORTUGAL, 14.316.131€ - 2006
PARQUE ESCOLAR - LOTE 2AN2 - ESC. SEC.
DE CALDAS DAS TAIPAS, ESC. SEC. CARLOS
AMARANTE E ESC. SEC. DE MONSERRATE
SCHOOL PARK - 2AN2 LOT - JUNIOR HIGH
SCHOOL OF CALDAS TAIPAS, CARLOS AMARANTE
AND MONSERRATE SECONDARY SCHOOLS
PORTUGAL, 42.554.308€ - 2011
ESTA EMPREITADA CONSISTIU NA REABILITAÇÃO E REMODELAÇÃO DE DIVERSOS EDIFÍCIOS EXISTENTES EM
TRÊS ESCOLAS SECUNDÁRIAS, BEM COMO A CONSTRUÇÃO DE NOVOS EDIFÍCIOS DE APOIO, INCLUINDO-SE NA
EMPREITADA TODOS OS TRABALHOS DE FUNDAÇÕES, ESTRUTURA, ACABAMENTOS, INSTALAÇÕES
ELETROMECÂNICAS, INFRAESTRUTURAS E ARRANJOS EXTERIORES.
THIS CONTRACT CONSISTED IN THE REHABILITATION AND RENNOVATION OF SEVERAL EXISTING BUILDINGS INTO THREE
JUNIOR HIGH SCHOOLS, AS WELL AS THE CONSTRUCTION OF NEW BUILDINGS OF SUPPORT, INCLUDING ALL WORK OF
FOUDANTIONS, STRUCTURE, FINISHES, ELECTROMECHANICAL INSTALLATIONS, INFRASTRUCTURES AND LANDSCAPING.
CENTRO CULTURAL DE MACAU
MACAU CULTURAL CENTRE
MACAU, 74.633.250€ - 1999
REMODELAÇÃO E REABILITAÇÃO EM 3 FASES DISTINTAS DO EDIFÍCIO TEATRO CIRCO. INICIOU-SE COM
EMPREITADA DE ESCAVAÇÃO, CONSOLIDAÇÃO DO EDIFÍCIO E CONTENÇÃO PERIFÉRICA, SEGUINDO-SE A
EMPREITADA DE FUNDAÇÕES E ESTRUTURA E FINALIZANDO-SE COM A EMPREITADA DE ACABAMENTOS
E INSTALAÇÕES ELETROMECÂNICAS.
CENTRO CULTURAL CONSTITUÍDO POR: EDIFÍCIO DOS MUSEUS (2 MUSEUS) COM 8 PISOS ELEVADOS E 2 ENTERRADOS
E UMA ÁREA DE CONSTRUÇÃO DE 16.035 M²; EDIFÍCIO DOS AUDITÓRIOS COM 2 AUDITÓRIOS COM O MESMO NÚMERO
DE PISOS, UM PARA 1..200 LUGARES E OUTRO PARA 400 E UMA ÁREA DE CONSTRUÇÃO DE 25.870 M².
REMODELLING AND REHABILITATION IN 3 DIFFERENT PHASES OF THE CIRCO THEATRE BUILDING. EXCAVATIONS,
CONSOLIDITION AND PERIPHERAL CONTAINMENT, FOUNDATIONS, STRUTURE, FINISHINGS AND ELECTROMECHANICAL
INSTALLATIONS.
CULTURAL CENTRE COMPOSED BY THE MUSEUM BUILDING (2 MUSEUMS) WITH 8 FLOORS ABOVE GROUND LEVEL AND 2
UNDERGROUND, COVERING A CONSTRUCTION AREA OF 16,035 M²; AUDITORIUM BUILDING WITH 2 AUDITORIUMS OF THE SAME
NUMBER OF FLOORS, ONE WITH 1, 200 PLACES AND THE OTHER WITH 400, AND A CONSTRUCTION AREA OF 25,870 M².