Linha 4- Amarela –Metrô
Metrô São Paulo
Localization
Southeast-Southwest, São
Paulo, Brazil
Clients
Description of the project
When finished, the Linha 4Amarela – Metrô São Paulo
will comprise an extension of 12.8
km and 11 underground Stations whose
implementation consists of two phases.
The first phase dates back to 2004 when the
six following Stations began to operate:
Butantã, Pinheiros, Faria Lima, Paulista,
República and Luz.
Jardins Access shaft - Oscar Freire Station
Project Type
Expansion of Subway Line
Services
Management of the
Executive Project
Duration
March 2012 - ongoing
The participation of infra7 begins in the second phase where five additional Stations will
be integrated: Vila Sônia,
Sôn São Paulo-Morumbi,
Morumbi, Fradique Coutinho, Oscar Freire and
Higienópolis Mackenzie. The maintenance yard of Vila Sônia in the vicinity of Av.
Higienópolis-Mackenzie.
Professor Fransisco Morato is awaiting completion.
Integration with the existing subway network occurs on lines 1-Azul (Blue), 2- Verde
(Green) and 3-Vermelha (Red), at the stations Luz, Paulista and República, respectively.
Infra7´s performance
As the managing company of the project, infra7 makes use of its know how to guarantee
the technical quality needed by a project
project of great complexity in a built up city. It
performs the technical approval in the geotechnical and structural classes of the
executive project.
Main aspects of the Project:
Underground stations with diverse
constructional methods: NATM, open
trench and cover-and-cut;
cover
Excavation of shafts with great
diameter and depth;
depth
Ventilation shafts and emergency
exists
exists;
Tunnels in NATM;
NATM
Utilization of the cover-and-cut
cover
method on heavy traffic roads.
roads
Higienópolis-Mackenzie
Mackenzie Station
Condomínio Ahead - Rua Cláudio Soares, 72, 8th floor - Pinheiros, São Paulo - SP - Brasil - Tel.: +55 11 3031 8001
infra7 Engenharia - All rights reserved.
TRANSPO
TRANSPORTATION
Download

Project Data - Infra7