Linha 4- Amarela –Metrô Metrô São Paulo Localization Southeast-Southwest, São Paulo, Brazil Clients Description of the project When finished, the Linha 4Amarela – Metrô São Paulo will comprise an extension of 12.8 km and 11 underground Stations whose implementation consists of two phases. The first phase dates back to 2004 when the six following Stations began to operate: Butantã, Pinheiros, Faria Lima, Paulista, República and Luz. Jardins Access shaft - Oscar Freire Station Project Type Expansion of Subway Line Services Management of the Executive Project Duration March 2012 - ongoing The participation of infra7 begins in the second phase where five additional Stations will be integrated: Vila Sônia, Sôn São Paulo-Morumbi, Morumbi, Fradique Coutinho, Oscar Freire and Higienópolis Mackenzie. The maintenance yard of Vila Sônia in the vicinity of Av. Higienópolis-Mackenzie. Professor Fransisco Morato is awaiting completion. Integration with the existing subway network occurs on lines 1-Azul (Blue), 2- Verde (Green) and 3-Vermelha (Red), at the stations Luz, Paulista and República, respectively. Infra7´s performance As the managing company of the project, infra7 makes use of its know how to guarantee the technical quality needed by a project project of great complexity in a built up city. It performs the technical approval in the geotechnical and structural classes of the executive project. Main aspects of the Project: Underground stations with diverse constructional methods: NATM, open trench and cover-and-cut; cover Excavation of shafts with great diameter and depth; depth Ventilation shafts and emergency exists exists; Tunnels in NATM; NATM Utilization of the cover-and-cut cover method on heavy traffic roads. roads Higienópolis-Mackenzie Mackenzie Station Condomínio Ahead - Rua Cláudio Soares, 72, 8th floor - Pinheiros, São Paulo - SP - Brasil - Tel.: +55 11 3031 8001 infra7 Engenharia - All rights reserved. TRANSPO TRANSPORTATION