13/12/2010 José Bartolomeu Ferreira Fontes (Consórcio Draga Brasil Ltda. / [email protected] Mathias Schlösser (GEO Tag Engenharia & Consultoria, Projetos e Serviços Ltda. / [email protected] 1 13/12/2010 SEP – Secretaria Especial de Portos Governo Federal 700 millions tonnes transported 8.500 km waterways Low cost transport a longside 37 Public ports 45 terminals for private use 2 13/12/2010 Porto de Santos - São Paulo 71 793,488 tons sep sep/10 /10 61 297,232 tons sep sep/09 /09 525 Vessels expected 49% national production 3 13/12/2010 The First dredge work did happen 1891 Actual Depth 13.5 m Upcoming 15 m The Project Channel Width: Width: 220m Lenght:: 24.600 m Lenght Basin:: 276 Basin Slope:: 1:6 Slope 4 13/12/2010 Average Distance = 11.9 NM Volume = 13.618.584 m³ D = 6.65 NM Volume = 4.025.000 m³ 5 13/12/2010 D = 11.14 NM Volume = 2.508.815 m³ D = 13.24 NM Volume = 1.741.999 m³ 6 13/12/2010 D = 15.59 NM Volume = 5.342.770 m³ Equipment Hopper Dredge 5.000 m³ capacity 7 13/12/2010 Hopper Dredge 13.500 m³ capacity Environmental Features Sea Walter and River Water Average Tide: Tide: 1.2 Strong Winds Intense Sediments Tranports Intense Vessel Traffic 8 13/12/2010 FEDERAL PORT CONTROL SEP PORT AUTHORITY CODESP ENVIRONMENTAL CONTROL IBAMA BATHYMETRY COMPANY MB DREDGE CONTRACTOR DRAGA BRASIL SURVEY TO MONITORING SB DREDGE TRACK MONITORING Advantages Multibeam System Coverage 100% Identfication any objects Better features resolution More accuracy to volume to dredge Less time to survey 9 13/12/2010 10 13/12/2010 11 13/12/2010 Advantages SingleBeam System DF SubBotton Penetration Material Consolidation Simple to operate Accesible Id Fluid Mud 12 13/12/2010 13 13/12/2010 14 13/12/2010 Concluid 15