Maintenance for unpaved roads carrying very low levels of traffic Developing a spot improvement manual for basic accessibility by Simon Done and John Rolt Presented by Brian Ferne AIPCR/PIARC Seminar Bamako, Mali February 2006 Background • The International group at TRL has been carrying out research for the benefit of developing regions of the world for many years • Some of the key outputs of this research are guidelines and best practice guides • These include the following… following… Overseas Road Notes Overseas Road Notes And ORN 20 ‘Management of rural networks’ networks’ Aimed at the very low traffic end of the spectrum Contribution of environment and traffic to road behaviour (schematic) Scope of the Road Notes 0.25 0.5 0.75 1.0 1.25 ORN - 1 Maintenance management for District engineers ORN 2 – Maintenance techniques for District engineers ORN 18 – A guide to pavement evaluation and maintenance of bitumen surfaced roads ORN 20 – Management of rural networks New New project aimed at very low traffic where environmental effects dominate road behaviour Percentage contribution Cumulative Traffic (mesa) 0 100 Environment 80 60 Traffic 40 20 0 0 0.25 0.5 0.75 1 1.25 1.5 1.75 2 Traffic (mesa) 1 Scope of the new project National roads… roads… • The majority of roads in most developing countries fall into the category of ‘low traffic’ traffic’ • Although the level of motorised traffic is low, • • • • • the roads perform a vital function for the rural population Maintaining them has always been a problem Insufficient funds is one reason but.. Traditionally priority has been determined by traffic Social benefits need to be included (ORN 22) Methods of maintenance suitable for higher traffic levels are not suitable because of cost … and Regional roads But there is not enough money available to construct and maintain all regional roads to the same high standard As a result, there are many problems on regional roads Rural accessibility Erosion 2 Potholes Because of these problems, vehicles often do not travel Missing structures People suffer because they have to walk to fetch water, go to the market, visit the hospital or work on their farms. Improve critical sites How can we improve regional roads at low cost so that vehicles can travel and so that funds remain to improve other roads to rural communities? 3 Leave passable sections Basic Access This level of service is called Basic Access It does not permit high speed travel But it provides reliable and safe access Basic access What does Basic Access involve? What are typical critical sites? What are the likely solutions? Problem: absence of water crossing Solution: culvert… culvert… 4 …drift… drift… …low cost splash …submersible bridge… bridge… Problem: erosion in side drain Solution: mitre drains… drains… …and drain lining 5 Side accesses… accesses… Solution: access structures Solution: embankment …can cause side drains to overtop and erode the surface Problem: flooding Problem: erosion on an unformed track 6 Solution: diversion banks Problem: surfaces can be dusty… dusty… …badly eroded… eroded… …slippery… slippery… …with potholes… potholes… Solution: gravel… gravel… 7 …seals… seals… …geo cells …do nothing… nothing… …spot sealing… sealing… And if the road or track is passable… passable… …do nothing 8 Spot improvement manual Spot improvement manual Reasons for adopting spot improvements: Very large rural network Low available funding Low maintenance capacity Low levels of traffic Priorities of local road users Deterioration of rehabilitated road Spot improvement manual: problems 1 Must be Acceptable to: • • • • Road authority staff Local residents Local politicians Contractors Decision made to commission a spot improvement manual Spot improvement manual: problems 2 Change of approach/policy: • Definitions of access • Definitions of spot improvements • Contract forms • Publicity/dissemination Spot improvement manual: problems 3 Engineers require: • Focus on access • Flexibility • Understanding of deterioration • Confidence Spot improvement manual: solutions • Include in national road policy • Allow inclusion in maintenance contracts • Commission a Manual • Guidance/training • Include training • Authority to carry out spot improvements • Series of dissemination workshops • National launch of Manual 9 Chapter 1 – Introduction Spot Improvement Manual For Basic Access Description of Basic Access Description of spot improvements Target group of the Manual A manual has been written to help with the design of spot improvements and the provision of Basic Access Involvement of local communities Additional useful manuals Preparado por: TRL Limited Nine Mile Ride, Wokingham Berkshire RG40 3GA United Kingdom. Definition of Basic Access: Chapter 2 – Identify critical sites • List of different types of defect For a standard vehicle: vehicle: • Water courses * * * * * * • Soils, surfaces and alignment Pass all year Travel above a speed of 20 km/h No one in danger No damage to the road No damage to the vehicle Road condition unlikely to worsen • Drains and slopes Some defects Form – for recording critical sites Figura 2 - Ficha de Levantamento de Sítios Críticos Distrito Início Estrada Técnico Fim Data Erosão noutros taludes > 10cm Erosão na valeta > 10cm / avança lateralmente p/ est. Água do terreno limítrofe transborda para a estrada O troço tem mau alinhamento - muitos sitios criticos Afloramento rochoso à superfície Conflito, má visibilidade ou dificuldade O troço é baixo e fica inundado Área de lama que se deforma quando molhada Raizes que danificam os pneus de bicicleta Murrumuché que é escorregadia O troço tem buracos Superfície é argila e escorregadia Área de areia solta Água na valeta transborda para a estrada Drenagens e Taludes Solos, Superfícies e Alinhamento Brechas de erosão longitudinal em declive > 5 cm O aterro é estreito e veículos < 50 cm da berma Estrutura existente gravemente danificada Picada em declive sem brechas de erosão > 5 cm Falta de Acesso Garantido todo o ano Falta de Acesso Garantido durante a époce seca Falta de Acesso Garantido durante as chuvas Acesso Garantido todo o ano A (km) Largura (m) De (km) Tipo (Picada/Terra Natural/TerraPlanada/Asfaltada) Acesso Garantido Linha de água existente (c/s água) Linhas de Água Localização (km) Medidas Soluções possíveis Localização de Pontos de Referência / Alternativos que podem reduzir os custos / Informação útil sobre as condições da estrada proveniente das conversas com as pessoas que usam a estrada durante todo o ano Acesso Garantido significa que um veículo padrão pode passar > velocidade padrão, sem perigo e sem danificar a estrada, o veículo, ou a sua carga para além do desgaste normal 10 Guidance on carrying out a survey Measuring Surface Deflection Creep speed Other survey techniques For Unpaved Primary Routes Running speed Equipment for measuring vehicle response - bump integrator mounted on vehicle rear axle Traffic speed Walking speed For Unpaved Primary Routes Equipment for measuring longitudinal profile - MERLIN For Unpaved Feeder Roads Instead use video records • more consistent • can provide reference 11 Cross sectional area of normal peak flow is < 0.5 m2 Y N Water often overtops the water course onto the surrounding land or there is general flooding Y Y Chapter 3 – Select appropriate solutions The route is an unformed track? Clear the water course. If condition persists, construct an embankment across the flooded land N • Water courses – water crossing structures • Erosion on a track – diversion banks Water flows for < 3 hours after rainfall Structures selection chart Select a structure for the main water course and select standard culverts or drifts at 50 m spacing along the embankment. N Y Use Section xx to estimate the necessary open area of the structure for the main water course Splash Necessary open area < 4 m2 Y • Loose sand – formation and improved surface N The cross section of the water course is wide and < 20 cm deep Y The road will require a hump if a culvert is constructed • Swamp – embankment Y N A strong foundation exists across the water course Site selection All water crossing sites should be stable. If the water course is likely to move laterally or erode, realign the road to a more stable crossing site. N Peak flow during and after heavy rain is < 3 days Y Peak flow during and after heavy rain is < 7 days Culvert N Normal flows last for more than two weeks N Submersible bridge It is possible to construct piers across the water course in the dry season Y Y Vented drift N Y N • Erosion in side drain – mitre drains and scour checks N N Y Drift High bridge with piers High bridge without piers eg. Bailey bridge Chapter 5 – Reduce costs 1. Construct more cheaply - Can the communities contribute materials? Chapter 4 – Estimate the costs • Bill of quantities 2. Prioritise the roads - Which road is the more important? 3. Prioritise the critical site - Can we adjust the definitions of Basic Access? 4. Reduce the length - Can we improve only the first part of the road? Chapter 6 – Implement spot improvements Advice on how to arrange for the work to be carried out – large teams • Self-help (by local communities and organisations) • Commercial (by contractors) 12 Advice on how to arrange for the work to be carried out – small plant Advice on how to arrange for the work to be carried out – individual workers Or even small work carried out by a community Chapter 7 – Training Completed form Completed plan Figura 5 - Mapa de Localização de Melhoramentos Localizados Figura 4 - Ficha de Levantamento de Sítios Críticos Distrito Início Estrada Distrito Técnico Fim Estrada Início Técnico Fim Data Data P 3 0+500 P 4 X 0+500 0+200 0+600 P 4 X P 4 0+600 0+700 0+100 A (km) 0+100 0+200 X X X X X Localização (km) 0+300 0+500 Medidas Soluções possíveis Picada em declive sem brechas de erosão > 5 cm Código Localização (km) Linhas de Água Código 0+135 L-3 P - 0.4 0+250 L-5 P - 0.3 70 metros 0+600 0+600 0+700 0+700 0+800 0+500 - 0+600 B3 B3 100 metros 100 metros 0+135 0+250 0+620 A1 A2 A1 A2 A = 0.5 m 2 L=5m A = 1.0 m 2 L = 12 m 0+220 - 0+290 0+610 - 0+680 0+660 aqueduto - devagar Localização (km) drift simples - água devagar superficie melhorada Solos, Superfícies e Alinhamento Lombas de alívio 0+610 - 0+680 70 metros; 50 cm X X 0+620 L - 7 P - 1.0 aqueduto - muito devagar X X 0+660 L - 12 P - 0.5 drift simples - água devagar Código Quantidades C1-2 B8 70 metros 350 m 3 aterro 0+700 0+800 TN 4 X X 0+725 - 0+745 20 metros limpar a valeta Localização de Pontos de Referência / Alternativos que podem reduzir os custos / Informação útil sobre as condições da estrada proveniente das conversas com as pessoas que usam a estrada durante todo o ano Uma igreja fica a 0+080 O lider da comunidade disse que a população é capaz de providenciar areia sem rendimento Linhas de água ficam a 0+135, 0+250 and 0+650 Um cruzamento com uma picada para Nhamatse fica a 0+540 Acesso Garantido significa que um veículo padrão pode passar > velocidade padrão, sem perigo e sem danificar a estrada, o veículo, ou a sua carga para além do desgaste normal 0+500 Cruz. c/ picada 0+540 Quantidades 0+220 - 0+290 X 0+300 0+200 - 0+300 Localização (km) X X 0+200 Pontos de Referência Igreja 0+080 Erosão noutros taludes > 10cm Erosão na valeta > 10cm / avança lateralmente p/ est. Água na valeta transborda para a estrada Água do terreno limítrofe transborda para a estrada O troço tem mau alinhamento - muitos sitios criticos Afloramento rochoso à superfície Conflito, má visibilidade ou dificuldade O troço é baixo e fica inundado Raizes que danificam os pneus de bicicleta Área de lama que se deforma quando molhada Murrumuché que é escorregadia O troço tem buracos Superfície é argila e escorregadia Área de areia solta Brechas de erosão longitudinal em declive > 5 cm O aterro é estreito e veículos < 50 cm da berma X X 0+300 Drenagens e Taludes Solos, Superfícies e Alinhamento 0+000 Quantidades X 0+300 Estrutura existente gravemente danificada X 3 Picada em declive sem brechas de erosão > 5 cm 3 P Falta de Acesso Garantido todo o ano Acesso Garantido todo o ano P 0+200 Falta de Acesso Garantido durante a époce seca Largura (m) 0+100 0+100 A (km) Falta de Acesso Garantido durante as chuvas Tipo (Picada/Terra Natural/TerraPlanada/Asfaltada) 0+000 De (km) Linha de água existente (c/s água) Linhas de Água Acesso Garantido De (km) Localização (km) Drenagens e Taludes Código Quantidades 0+725 - 0+745 B16 20 metros Notas O lider da comunidade disse que a popula ção é capaz de providenciar areia sem rendimento 13 Solução Código Norma Secção A – Estruturas de Linhas de Água Chapter 8 Estimativa do tamanho da estrutura Aqueduto Drift simples Drift de pedra arrumada Drift de tubos Passagem de aterro Ponte submersível Ponte alta A0 A1 A2 A3 A4 A5 A6 A7 Estimating the size of a structure… structure… Terreno C1 Solo C2 Vegetação C3 Muito plano Ondulado Montanhoso 0.10 0.14 0.20 Arenoso Médio > 30% rocha ou pavimentado 0.15 0.21 Densa Médio Nenhuma/ligeira 0.25 0.35 0.50 Rational method Secção B – Picadas, Estradas e Drenos Catalogue of solutions Alternatives Descriptions Sketches Drawings Quantities Prevenção da erosão Reparação da erosão Lombas de alívio Remoção de murrumuché Remoção de raízes Picada separada Enchimento Aterro Abaulamento Estrada sobre rocha Sanjas Cascatas Revestimento da valeta Vala de crista Vala Limpar a valeta Melhorar o acesso lateral Bio-engenharia Corte de capim Limpeza Destroncamento Realinhamento B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15 B16 B17 B18 B19 B20 B21 B22 0.30 C = C1 + C2 + C3 Tabela 17 Calculando C para a captação de chuva C Área de captação (ha) C1 C2 C3 C4 C4-1 C4-2 C4-3 C4-4 C5 C6 C7 2 2,3 Área aberta necessária (m ) <5 5-10 10-20 20-50 50-100 100-250 250-500 0.3 0.5 0.8 1.6 2.5 4.7 7.4 0.50 - 0.75 <5 5-10 10-20 20-50 50-100 100-250 250-500 0.5 0.8 1.2 2.3 3.6 6.8 10.6 0.75 - 1.00 <5 5-10 10-20 20-50 50-100 100-250 250-500 0.6 1.0 1.7 3.0 5.0 9.0 14.9 Secção C – Superfícies Melhoradas Picada estabilizada Picada com saibro Saibro na estrada Selos de betume Sand seal Grit seal Otta seal Chip seal Geo Cells Base de Emulsão Betuminosa (ETB) Estabilização mecânica de argila 1 0.50 Tabela 18 Área aberta necessária para uma estrutura (2) To prevent overtopping of a structure Culvert – direct inputs Recurso Unidade Quantidade Cimento Areia Pedras de betão Alvenaria Ferro Trabalhadores Capataz Pedreiros Tractor Atrelado Tanque de água Betoneira 50 kg 3 m 3 m 3 m kg Pess-dia Pess-dia Pess-dia Equip-dia Equip-dia Equip-dia Equip-dia 21 3 4 4 42 20 2 3 2 2 10 10 Culvert Drift 14 Splash Embankment Vented drift Submersible bridge Construction and Repair High bridge Prevention of erosion Resolve problems while still small Identify and treat the source of erosion Divert water to surrounding land Place top soil and plant grass Construct improved surfaces Clean the drains Shape the road surface well Maintain all roads and tracks 15 Removal of anthill Diversion banks to prevent erosion on a track Removal of roots Separate track Road formation Sustainability in the UK! 16 Road on rock Side access Drains, mitre drains and scour checks BioBio-engineering Vegetation on slopes Stone paving Live scour checks Vegetation fascines Grass cutting, bush clearing & tree removal Improved surfaces Slippery Erosion Loose sand Dusty Weak Swampy Rock outcrops 17 Selection table for improved surfaces Mais de 100 50-100 Condições Base * Superfície Bons materiais naturais disponíveis Bons materiais naturais não disponíveis Bons materiais naturais disponíveis Saibro Otta seal duplo Chip seal duplo Otta seal duplo Chip seal duplo Otta seal simples Chip seal simples Grit seal Otta seal simples Chip seal simples Grit seal 30-100 Bons materiais naturais não disponíveis Menos de 50 Bons materiais naturais disponíveis Bons materiais naturais disponíveis Declive íngreme Bons materiais naturais não disponíveis Menos de 50 Menos de 30 Solo quimicamente estabilizado Saibro Base de Emulsão Betuminosa (ETB) Geo Cells Track with gravel Saibro Saibro Base de Emulsão Betuminosa (ETB) Geo Cells Otta seal simples Grit seal Sand seal duplo Otta seal simples Grit seal Sand seal duplo Gravelling Gravel selection chart ESPECIFICAÇÃO DO MATERIAL PARA CAMADA DE SAIBRO 500 Gravel tests D Escorregadio 365 Grading coefficient Shrinkage product Settlement test Drying test A PRODUTO DE RETRACÇÃO Tráfego (veículos por dia) Mais de 100 240 Sofre erosão C Solta-se E2 Bom 100 B Solta-se e causa ondulação 0 0 Bituminous seals E1 Bom, mas pode ser poeirento 16 COEFICIENTE DE GRANULOMETRIA 34 48 Geo cells Sand seal – area Grit seal – 0-6 mm Otta seal – 0-16 mm Chip seal – 10 ou 13 mm 18 Summary of Manual We can provide access to the rural communities, so they can reach the farms… farms…. Define Basic Access Identify critical sites Select solutions Estimate costs Reduce costs Design the improvements Construct the improvements Train …trade their crops… crops… ….and go to markets ….visit hospitals… hospitals… The End 19 Merci Pour votre attention! Thank you for listening [email protected] 20