Brejuí Solar Energia SPE Ltda.
1 project 30 MW
Currais Novos, Rio Grande do Norte (RN)
OUR
COMPANY
SER ENERGIA is a large-scale PV project development
company in Brazil.
As a pioneer in the segment, SER was able to
secure the best site location alternatives with high
solar irradiation, easy access, efficient connection
solutions and favorable topography, providing its
projects great competitiveness.
With a portfolio of 36 projects of 30MW (1080 MW
as in July 2014) distributed among 18 SPCs (Special
Purpose Companies), SER has developed projects in
several states in the northeast of Brazil, region with
the highest solar irradiation of the country, favoring
high energy yields.
The company exhaustively seeks high quality
standards in every step of the development process.
All the documentation of the projects, SPCs, land
contracts, environmental license or communication
to the agents of the sector are all organized, up-todate and traceable.
The location of the projects were strategically
chosen after careful and extensive study of
alternatives. All the areas of the projects are
secured, either through long term rental
contracts or acquisition. There were considered:
[1]
Solar Irradiation
[2]
Connection solution
[3]
Topography
[4]
Land Price
[5]
Access
Configuration
Northeast
Region of
Brazil
OUR SPCs
CEARÁ
H
F
D
A
C
G
K
J
PIAUÍ
I
BREJUÍ
30MW
L
M
Latitude: N 9.304.601,348
PERNAMBUCO
R
F
PARAÍBA
N
B
RIO GRANDE
DO NORTE
E
Longitude: E 774.226,743
O
Q
Zone: 24M
ALAGOAS
P
BAHIA
Elevation 342m
SERGIPE
Access: BR-427
Irradiation per day:
5,5 / 6,0 kWh/m2
5,0 / 5,5 kWh/m2
4,5 / 5,0 kWh/m2
I
Malta 30MW
J
Angico 30MW
A Sobral 60MW
K
Lagoa 90MW
B Sertão 60MW
L
Caraçá 120MW
C Orós 120MW
M
Arigó 90MW
D Janduí 30MW
N
Xaxado 90MW
E Acauã 30MW
O
Assuruá 30MW
P
Citrino 30MW
G Engady 30MW
Q
Murión 150MW
H Extremoz 30MW
R
Sobrado 30MW
F
BREJUÍ 30MW
AVG. IRRAD (GHI): 2.071 kWh/m2/year
AVG. TEMP: 25,4oC
ABOUT THE PROJECT
The property is located in the outskirts of the city Currais Novos,
185km from Natal, the capital of Rio Grande do Norte State. The
access is 2km towards the city of Acari, through Federal Road
BR- 427. This project is in the same property of Project Acauã 1.
The vegetation is “caatinga” (tipical brazilian northeast vegetation)
and the topography is characterized by soft hills. This area is shared
with another project called Brejuí with 30MW of power.
CONNECTION
Type of Connection: Substation
Utility Company: CHESF
Distance to Substation: 700 m
Voltage Connection: 69 kV
TECHNICAL INFORMATION
The following information corresponds to the project registered at ANEEL and EPE. Equipment can be changed.
Brejuí 1
Nominal Power
30.000 kW
Power Peak
35.746 kWp
Technology
Silicon Poly Crystalline
Structure
Fixed 10°
kWh/kWp
1.619 hrs per year
Net Yearly Production
55.991 MWh
Performance Ratio
78,0 %
Energy Certificated
5,90 MW Avg./year*
Landscape Overview
*Average Energy Yield at year 10 for a 20-year PPA. Certified by independent company (Garrad-Hassan) considering P50 and 0,7% yearly module
degradation. Calculation method considered by EPE for energy auctions.
Download

OUR COMPANY - SER Energia