Marketletter 3Q14 Annex Marketletter INDEX Introduction I. Analysis of the Results of the Consolidated Companies 3 II. Analysis of the Results of the Parent Company 12 III. Eletrobras Information 16 IV. Attachment: Subsidiary Companies Information IV.1. Generation and Transmission Companies 31 Itaipu 32 Furnas 40 Chesf 67 Eletronorte 94 Eletronuclear 112 Eletrosul 120 CGTEE 145 IV.2. Distribution Companies 154 Amazonas Energia 155 Distribuição Acre 169 Distribuição Alagoas 179 Distribuição Piauí 188 Distribuição Rondônia 197 Distribuição Roraima 206 IV.3. Participation Company 215 Eletropar 215 EBR & EBR.B LISTED NYSE ELET3 & ELET6 Conference Call in English November 17th, 2014 2 p.m. (Brasília time) 11 a.m. (US EST) 4 p.m. (London time) Phone: (+1 786) 837 9597 (US) (+44) 20 3318 3776 (UK) Password: 9532 RI: Investor Relation [email protected] www.eletrobras.com/elb/ri Tel.: (55) (21) 2514-6331 Marketletter 1.Generation and Transmission Companies Company Net Operating Revenue (R$ million) 2014 2013 Furnas Chesf Eletronorte Eletrosul Eletronuclear CGTEE 4,508 2,555 4,529 788 1,422 252 Service Result (R$ million) 2014 2013 3,196 3,153 3,484 777 1,386 184 862 -468 1,298 662 -297 -199 -446 -734 1,629 332 145 -301 Income/Loss of the Period (R$ million) 2014 2013 2014 -292 15 1,232 146 -442 -341 373 -421 1,681 496 -26 -144 -578 -269 1,251 184 47 -358 EBITDA (R$ million) Margin EBITDA (%) 2013 2014 2013 -208 -599 1,990 398 363 -247 8.27 -16.48 37.11 62.91 -1.84 -57.41 -6.52 -19.00 57.12 51.22 26.17 -134.80 Installed Capacity Company Full Ownership (a) Furnas Chesf Eletronorte * Itaipu Eletronuclear CGTEE Eletrosul Eletrobras Distribution companies Total 9,261 10,615 9,350 7,000 1,990 840 428 2,207 41,691 SPE (b) 1,627 303 121 216 13 2,280 Physical Aggregation 2014 Total (a+b) 550 180 46 199 121 1,096 10,888 10,918 9,471 7,000 1,990 840 644 13 2,207 43,971 (b) The company's participation in the project * The physical aggregation in 2014 of the distribution companies refers to the trnasfer of the UTE Electron from Eletronorte to Amazonas Energia. Extension of Transmission Lines - Km Company Full Ownership Furnas Chesf Eletronorte Eletrosul Distribution companies Total (a) 19,878 19,691 10,703 11,140 673 62,085 SPE (b) 1,234 1,042 890 292 3,458 Physical Aggregation 2014 Total (a+b) 10 347 233 588 875 21,112 20,733 11,593 11,432 673 65,543 (b) The company's participation in the project Energy Sold – MWh Itaipu Furnas* Chesf Eletronorte Eletronuclear Eletrosul* CGTEE Total 9M14 9M13 58,221,995 29,815,191 41,667,175 39,323,619 10,060,114 1,479,625 3,057,223 183,624,941 66,780,113 31,534,839 43,461,537 39,445,890 10,269,857 1,460,412 2,784,624 195,737,272 * The data related to energy sold do not include the CCEE liquidation part. 31 MARKETLETTER Balance Sheet (In US$) Financial Statements for Consolidation Purposes Assets Current Assets Cash and cash equivalents Accounts receivable from clients Stored materials Obligation to receive Legal deposits Other accounts receivable Current Assets Total Non-Current Assets Obligations to receive Legal deposits Results to compensate From previous periods Result for the period Property, unit and equipment Intangible Total Non-Current Assets Total Assets 09.30.14 12.31.13 356,548,809 955,500,537 6,211,385 3,289,154 34,027,482 38,708,252 1,394,285,619 387,365,027 1,007,320,522 6,656,848 3,288,033 21,106,491 63,452,965 1,489,189,886 212,920,439 25,459,614 238,380,053 200,840,198 43,953,374 244,793,572 -2,131,418,858 -898,199,553 -3,029,618,411 17,469,136,840 23,618,731 14,701,517,213 16,095,802,832 -942,516,046 -1,188,902,812 -2,131,418,858 17,488,882,033 22,288,878 15,624,545,625 17,113,735,511 32 Marketletter Liabilities and Stockholders’ Equity 09.30.14 12.31.13 Current Liabilities Loans and Financing Remuneration and reimbursement Suppliers Pay roll and social obligations Labor indemnities Provision for lawsuits Other obligations Total Current Liabilities 1,224,328,703 652,985,176 17,992,813 75,711,104 12,571,237 105,597,140 5,637,104 2,094,823,277 1,168,918,872 713,493,716 59,514,157 58,919,188 27,505,259 134,774,746 3,357,166 2,166,483,104 Non-Current Liabilities Loans and financing Remuneration and reimbursement Labor indemnities Post-Emplyment benefits Provision for lawsuits Other obligations Total Liabilities 11,752,825,669 363,568,609 1,705,849,965 75,265,708 3,469,604 15,995,802,832 12,675,882,137 345,044,078 1,696,400,179 126,411,007 3,515,006 17,013,735,51 Stockholders’ Equity Capital Centrais Elétricas Brasileiras SA Administración Nacional de Electricidad Total Stockholders’ Equity Total Liabilities and Net Stockholders’ Equity 50,000,000 50,000,000 100,000,000 16,095,802,832 50,000,000 50,000,000 100,000,000 17,113,735,511 33 Marketletter Statement of Income (US$) Operating Revenues Power supply Remuneration on power assignment Reimbursement of charges – non assured Energy Operating Revenue Total Operating Expenses Remunerations and reimbursements Capital income Remuneration on power assignment Assured Energy Royalties Reimbursement of charges – administration and supervision Non assured Energy Royalties Reimbursement of charges – administration and supervision Operating expenses Administrative and general expenses Personnel Actuarial Provisions Materials Third-part related services Provision for lawsuits Other operating expenses Total of operating expenses Result of Service Other revenues / expenses Sundry Revenues Sundry Expenses Financial Revenues Income from financial applications Moratory increase on Energy invoices Other financial revenues Financial Expenses Debt charges Non-debt charges Charges on remunerations and reimbursements Monetary adjustment Other financial expenses Financial Result Net income for the period 09.30.14 09.30.13 2,468,259,000 244,856,874 57,808,144 2,770,924,018 2,468,259,000 285,961,270 100,737,904 2,854,958,174 -36,527,374 -244,856,874 -36,061,488 -285,961,270 -305,455,538 -23,496,580 -303,278,300 -23,329,100 -53,678,990 -4,129,154 -668,144,510 -93,542,340 -7,195,564 -749,368,062 -434,751,198 -11,958,760 -64,479,061 73,973,241 -103,249,560 -540,465,338 -1,208,609,848 1,562,314,170 -443,876,269 -9,186,621 -75,126,737 19,489,448 -63,605,453 -572,305,632 -1,321,673,694 1,533,284,480 2,394,932 -38,374,975 -35,980,043 6,303,862 -5,607,261 696,601 41,872,428 2,252,485 2,616,700 46,741,613 16,732,104 2,305,946 19,038,050 -672,170,510 -2,108,825 -567,860 -28,992 -674,876,187 -1,878,646 -726,429,610 87,717,364 -5,695 -640,596,587 -628,134,574 898,199,553 -621,558,537 912,422,544 34 Marketletter Cash Flow (US$) Operating Activities Net income for the period Adjustments Disposal of Fixed Assets - sales Monetary Variation on Financing and loans Monetary Variation on Estimated Obligations Liability provisions Financial charges to be capitalized Financial charges not to be capitalized Estimated Obligations Adjusted Income Variations in Assets and Liabilities Accounts Receivable variation – Rendering of Services Stored Material variation Other Credits variation Remuneration and reimbursement variation Suppliers and other variations Payment-roll and social obligation variation Payment of the Estimated Obligation Net Operating Cash Flow Investment Activities Property, unit and equipment and intangible Balance of the Investment Activities Financing Activities Loans and financing obtained Amortization of the Loans and Financing Payment of interest on Loans and Financing Balance of the Financing Activities Total of Cash Effects Cash and cash equivalent – beginning of period Cash and cash equivalent – end of period Total of Cash Effects 09.30.14 09.30.13 898,199,553 912,422,544 38,097,289 200,791 2,160,682 5,095,874 -1,838,017 -111,438,314 672,172,985 121,630,846 1,732,462,146 1,878,646 726,429,610 69,060,723 1,601,611,066 51,819,984 445,463 19,160,639 -60,508,540 -39,286,811 16,791,916 -191,074,136 -202,651,485 1,529,810,661 -19,436,566 -2,023,116 29,998,412 9,762,002 -59,747,932 16,242,502 -115,247,641 -140,452,339 1,461,158,727 -19,681,949 -19,681,949 -20,059,008 -20,059,008 2,250,000 -871,773,989 -671,420,941 -1,540,944,930 -30,816,218 387,365,027 356,548,809 -30,816,218 22,049,560 -806,866,819 -728,505,749 -1,513,323,008 -72,223,289 534,263,722 462,040,433 -72,223,289 35 Marketletter Market Data 1. Generation Assets and Energy generated Own assets Unit Installed Capacity (MW) Guaranteed Energy (MW Average) Itaipu Binacional 14,000 8,577 Energy Generated (MWh) 1Q14 2Q14 3Q14 23,251,103 22,061,975 20,848,730 Unit Participation (%) Location (State) Beginning of Operation End of Concession Itaipu Binacional 50% Brazil (Paraná) and Paraguay (Alto Paraná) 03/1985 - 2. Electric energy purchased for resale - N/A 3. Energy sold Own assets Sales model Buyer A B A B A B Eletrobras System Others Total 1Q14 US$ Million* 741,4 81,4 822,8 2Q14 US$ Million* MWh 20,103,482 2,983,783 23,087,265 759,2 63,6 822,8 MWh 19,767,360 2,135,060 21,902,420 3Q14 US$ Million* 761,9 60,8 822,7 MWh 18,351,153 2,359,017 20,710,170 A - Through auction B - Through free market agreements or bilateral contracts *Only assured energy 4. CCEE settlement (Spot and MRE) – N/A 5. Fuel used to produce electricity– N/A 6. Losses in generation - % 1Q14 2Q14 3Q14 0.70 0.72 0.66 1Q14 2Q14 3Q14 22.60 22.60 22.60 7. Average price– US$/KW Own assets 36 Marketletter 8.Extension of transmission lines – Km – N/A 9.Losses in transmission – N/A 10. Main Investments – US$ Million Project 1Q14 2Q14 3Q14 Budget 0.9 0.5 0.3 2,5 4,2 1,7 0.6 1,0 6,2 9,5 0.4 1,2 0.1 4,3 6,0 - Generation Permanent Technical Reserve Softwares Other investments Total 11. New investments – N/A 12. Loans and financing – US$ million Local currency - LC Creditor Balance 03.31.14 Balance 06.30.14 Balance 09.30.14 Due FIBRA – Fundação Itaipu – BR 36,8 37,8 33,4 2023 Index 6.0% + INPC Foreign currency - FC Creditor Eletrobras National Treasury - Cession Restructuring of foreign debt CAJUBI – Fundação Itaipu - PY ITAU Paraguay TOTAL Balance 03.31.14 4,912,1 8,289,4 256,9 70,8 13,529,2 Balance 06.30.14 Balance 09.30.14 4,740,2 8,176,2 244,9 69,4 13,230,7 4,565,7 8,061,2 246,8 67,8 2,2 12,943,7 Due Date Currency 2014/2021/2023 2023 2013/2023 2021/2022 2016 US$ US$ US$ US$ US$ 13. Contracts – US$ million 13.1. Loans and financing Loans and financing By activity Generation By creditor Eletrobras Others 2014 2015 2016 2017 2018 After 2018 Total 299,6 1,242,3 1,326,2 1,410,9 1,505,3 7,192,8 12,977,1 177,0 122,6 596,6 645,7 485,1 841,1 516,7 894,2 550,7 954,6 2,239,5 4,953,3 4,565,6 8,411,5 37 Marketletter 14. Number of employees 14.1.By tenure Generation Brazilian Margin (Left Margin) Composition of employees by tenure (Years) 1Q14 Up to 5 6 to 10 11 to15 16 to 20 21 to 25 beyond 25 Total 2Q14 369 380 125 161 108 262 1,405 355 393 134 158 85 289 1,414 3Q14 356 403 125 151 53 289 1,377 Paraguayan Margin (Right Margin) Composition of employees by tenure (Years) 1Q14 Up to 5 6 to 10 11 to15 16 to 20 21 to 25 beyond 25 Total 2Q14 579 209 281 2 394 346 1,811 551 240 268 351 364 1,774 3Q14 383 390 47 243 109 590 1,762 14.2. By region State Itaipu Hydrolectric Unit 3 Paraná – Brazil São Paulo – Brazil Brasília – Brazil Paraguay Total 3 1Q14 Number of employees 2Q14 2,162 313 01 03 737 3,216 2,138 311 01 03 735 3,188 3Q14 2,115 301 01 03 719 3,139 Located in Foz do Iguaçu-Paraná-Brasil and Hernandárias-Alto Paraná-Paraguay. Brazilian Margin (Left Margin) State Usina Hidrelétrica de Itaipu* Paraná – Brasil São Paulo – Brasil Brasília – Brasil Paraguai Total 3 1Q14 1,100 301 01 03 1,405 Number of employees 2Q14 3Q14 1,094 316 01 03 1,414 1,084 289 01 03 1,377 Number of employees 2Q14 3Q14 Located in Foz do Iguaçu-Paraná-Brasil and Hernandárias-Alto Paraná-Paraguay. Paraguayan Margin (Right Margin) State Usina Hidrelétrica de Itaipu* Paraná – Brasil São Paulo – Brasil Brasília – Brasil Paraguai Total 3 1Q14 1,062 12 737 1,811 1,039 12 723 1,774 1,031 12 719 1,762 Located in Foz do Iguaçu-Paraná-Brasil and Hernandárias-Alto Paraná-Paraguay. 38 Marketletter 14.3. By departments Department Field Administrative 1Q14 Number of employees 2Q14 3Q14 747 2,469 727 2,461 715 2,424 Brazilian Margin Department 1Q14 Field Administrative Number of employees 2Q14 380 1,009 377 1,037 3Q14 375 1,002 Paraguayan Margin Department 1Q14 Field Administrative Number of employees 2Q14 367 1,444 350 1,424 3Q14 340 1,422 15. Complementary work force – N/A 16. Turn-over - % 1Q14 2Q14 3Q14 0.0109 0.0047 0.0121 Brazilian Margin 1Q14 2Q14 3Q14 0,0112 0,0064 0,0144 Paraguayan Margin 1Q14 2Q14 3Q14 0,0113 0,0124 0,0152 39 Marketletter Balance Sheet (R$ thousand) Financial Statements for Consolidation Purposes Assets Current Assets Availabilities Clients (Consumers and resellers) Loans and financing - principal Marketable Securities Dividends to receive (Remuneration of equity participation) Fiscal Assets deferred (Taxes and contributions) Income Tax and Social Contribution Reimbursement Rights – CCC (12,111 law) Linked deposits Stored materials Financial Asset Receivables - 12,783/13 Law Others Current Assets Total . Non-Current Assets Clients (Consumers and resellers) Loans and financing - principal Marketable Securities Fiscal Assets deferred (Taxes and contributions) Income Tax and Social Contribution Reimbursement Rights – CCC (12,111 law) Linked deposits Financial Asset Receivables - 12,783/13 Law Others Advances for equity participation INVESTMENTS FIXED ASSETS INTANGIBLE Non-Current Assets Total Assets Total 09.30.14 09.30.13 2,059 584,892 3,080 949,106 41,445 7,671 217,022 247,306 23,599 1,430,894 215,598 3,722,672 3,691 570,176 3,435 718,664 21,143 127,998 379,042 15,331 24,218 1,499,440 216,667 3,579,805 395,231 3,893 394,052 79,662 532,140 6,469,038 185,669 51,811 8,111,496 5,087,705 5,851,221 100,909 19,151,331 22,874,003 319,501 5,324 961,326 308,720 457,326 6,346,070 1,005,772 190,700 9,594,739 4,547,271 5,812,053 93,964 20,048,027 23,627,832 40 Marketletter Liabilities and Stockholders’ Equity 09.30.14 09.30.13 Current Liabilities Suppliers Loans and financing Taxes and social contribution Income Tax and Social Contribution Derivatives Estimated obligations Advances from consumers Shareholders remuneration (dividends payable) Provisions for contingencies Post-employment benefit (complementary Pension Fund) Leasing Onerous Contracts Concessions to pay - UBP Sectorial charges (regulatory taxes) Incentive to personnel retirement Others Current Liabilities Total 560,529 504,957 258,211 102,674 184,663 79,617 508 134,332 24,199 1,849,690 251,700 427,826 308,120 191,610 70,967 134,414 320,205 24,414 1,729,256 Non-Current Liabilities Suppliers Loans and financing - Principal Taxes and social contribution Income Tax and Social Contribution Derivatives Advances from consumers (energy sell in advance) Estimated Obligations Provisions for contingencies Provision for onerous contract Post-employment benefit (Complementary Pension Fund) Concessions to pay - UBP Sectorial charges (regulatory taxes) Advance for future Capital Increase Others Non-Current Liabilities Total 7,793,101 724,696 537,364 782,213 172,313 37,104 90,880 37,490 1 10,175,162 7,330,140 488,753 1,026,350 1,132,685 611,188 39,669 74,920 33,948 1 10,737,654 6,531,154 5,528,986 -291,645 -919,344 - 6,531,154 5,690,383 493,059 -578,088 -975,586 - Stockholders’ Equity Total 10,849,151 11,160,922 Non-Current Liabilities and Stockholders’ Equity Total 22,874,003 23,627,832 Stockholders’ Equity Social Capital Capital reserves Profit reserves Additional dividends proposed Accrued profit/losses Other comprehensive income Non-controlling participation 41 Marketletter Statement of Income by Activity (R$ thousand) 09.30.14 Operating Revenue Generation Plant Supply Energy Supply Short term electric Energy (CCEE) O&M Revenue of Renewed Plants Construction Revenue Return on Investment - G 09.30.13 2,601,568 11,283 856,977 415,787 45,730 - 1,735,034 62,186 362,356 399,842 70,109 - 625,344 309,733 153,184 34,431 529,243 17,726 248,688 133,322 55,797 -545,712 4,508,325 -418,698 3,195,605 -862,261 -314,346 -371,003 -355,463 -605,869 -302,717 -280,821 -318,797 -1,254,971 -98,444 -163,985 -22,353 -69,592 -133,937 -3,646,355 -1,339,875 -113,978 -134,125 -18,958 -438,983 -87,415 -3,641,538 Result of equity participation Operating Result before Financial Result -652,998 208,972 103,335 (342,598) Financial Result Result before Income Tax / Social Contribution -307,473 -98,501 -158,495 -501,093 -136,415 -56,729 -291,645 -20,383 -56,612 -578,088 Transmission O&M Renewed Transmission Lines Revenue O&M Revenue Construction Revenue – Transmission Return on Investment - T Other Operating Revenue Deductions to Operating Revenue Net Operating Revenue Operating Cost Electric Energy purchased for resale Charges on the use of electric grid Fuel for production of electric Energy - CCC Construction costs . Operating Expenses Personnel, Material and Third-part related Service Remuneration and reimbursement Depreciation and amortization Donations and Contributions Provisions Others Operating Costs and Expenses Current Income Tax and and social contribution Deferred Income Tax and and social contribution Net income for the period 42 Marketletter Cash Flow (R$ thousand) Cash Flow 09.30.2014 09.30.2013 OPERATING ACTIVITIES Profit/Loss before income tax and social contribution Depreciation and amortization Net monetary and currency variations Financial charges Equity Equivalency Result Provision for uncovered liability Provision for credits of questionable liquidation Provision for contingencies Provision for staff realignment Impairment – Onerous contract Global reversal reserve charges Adjustment to present value / market value Minority Participation in the Results Charges on shareholders funds Financing assets Revenue - IRR Derivative financial instruments Others Variation in operating assets / liabilities Cash generated in operating activities -98,501 163,985 107,178 599,621 652,998 50,433 -17,945 -11,485 -219,006 214,418 -153,184 -201,834 43,121 1,129,799 -501,093 134,126 62,233 371,371 -103,335 21,848 161,171 328,906 -357,530 198,879 -133,323 -185,400 93,029 90,882 Financial charges paid Payment of global reversal reserve charges Financial charges received Remuneration received from equity participation Financial asset revenue by RAP Receiving compensation for financial asset Payment of income tax and social contribution Payment of pension fund Lawsuits payment Legal deposits Net cash operating activities -505,781 -194,178 714 60,496 172,972 993,465 -193,049 -13,744 1,450,694 -368,928 -155,135 5,635 63,100 151,314 1,472,959 -121,945 -54,442 1,083,440 422,588 -259,291 -47,849 115,448 1,392,455 -438,087 -48,221 906,147 -94,417 -4,566 -355,463 -941,392 -174,941 -1,570,779 -234,451 -14,522 -318,798 -984,626 -435,961 -1,988,358 -4,637 1,229 6,696 2,059 -4,637 2,462 3,691 1,229 FINANCING ACTIVITIES Loans and financing obtained Loans and financing payable – principal Payment of Shareholders remuneration Payment on refinancing of taxes and contributions - Principal Receipt of Advance for future Capital Increase Others Net financing activities INVESTMENT ACTIVITIES Concession of Loans and Financing Acquisition of fixed asset Acquisition of intangible asset Acquisition of Concession asset Advance for future capital increase Acquisition of equity participation Others Net cash investment activities Increase (decrease) in cash and cash equivalent Cash and cash equivalent – beginning of period – 12/31/13 Cash and cash equivalent – end of period – 03/31/14 43 Marketletter Analysis of the result 3Q14 x 2Q14 The Company had a net loss in the 3Q14 483.8% higher than that recorded in the previous quarter, from a net profit of R$ 107.1 million in the 2Q14 to a loss of R$ (376.7) million in the 3Q14, mainly due the factors described below. Operating Revenue In generation: The supply of electricity for distribution companies increased by 40.1%, from R$ 803.3 million in the 2Q14 to R$ 1,132.4 million in the 3Q14, primarily due to higher volume of energy traded in the 3Q14, for the energy sold at auction A-0 started to be delivered in May, i.e., one month less than the 3Q14. The short-term electricity decreased by 100%, due to the fact that there was no sale of electricity in the spot market in the 3Q14. Revenue from operation and maintenance of renewed power plants increased by 6.6%, from R$ 131 million in the 2Q14 to R$ 139.2 million in the 3Q14, mainly due to the increase in revenue from the Annual Generation Revenue (RAG) in the 3Q14. Transmission: Revenue from operation and maintenance increased by 24.1%, from R$ 194.1 million in the 2Q14, to R$ 240.9 million in the 3Q14, primarily due to increased revenue from contract 062/2001. The remuneration of financial assets increased by 34.8%, from R$ 45.9 million in the 2Q14 to R$ 61.8 million in the 3Q14, primarily due to increased revenue from contracts. Other revenues had increased 95%, from R$ 9.2 million in the 2Q14 for R$ 18 million in the 3Q14, primarily due to increased revenues from service delivery. Operating Expenses Expenses for personnel, material and third-part related services decreased by 7.7%, from R$ (464.8) million in the 2Q14, for R$ (429.1) million in the 3Q14, mainly due to the provision, in the 2Q14 of R$ 62.1 million of labor claims against R$ 8.5 million in the 3Q14. Electricity purchased for resale increased by 140.8% from R$ (216.3) million, in the 2Q14, for R$ (520.1) million, in the 3Q14, primarily due to increased electricity purchased due to the negative settlement in CCEE, resulting from exposure in the energy market, as of June 2014. The fuel for electricity production decreased by 29.8%, from R$ (175.7) million in the 2Q14 for R$ (123.4) million in the 3Q14, mainly due to increased fuel purchase in the 3Q14, due to an increase in production of Santa Cruz Thermoelectric Plant. Operational provisions had increased 175.1%, from a reversal of R$ 72.7 million in the 2Q14 to a provision of R$ (54.6) million in the 3Q14, mainly due to the reversal of provisions occurred in the 2Q14 and provision for loss of financial assets, in the 3T14, worth R$ 153 million. Other operating expenses increased by 122.7%, from R$ (33.1) million in the 2Q14 for R$ (73.9) million in the 3Q14, mainly due to the loss on disposal of assets and an increase in bank guarantees. Financial Results Net monetary decreased by 49.4%, from a loss of R$ (63.0) million in the 2Q14 to a loss of R$ (31.9) million in the 3Q14, due mainly to increased monetary update over judicial deposits between the 2Q14 and 3Q14. Other financial expenses decreased by 70.9%, from an expense of R$ (66.4) million in the 2Q14 to an expense of R$ (19.3) million in the 3Q14, mainly due to lower expenses with taxes installments. Compensation of indemnities of Law 12,783/13 increased by 22.8%, from R$ 63.3 million in the 2Q14 to R$ 77.7 million in the 3Q14, mainly due to the accounting of monetary updates. Shareholding Participations The result from equity investments decreased by 12,243.7% from a gain of R$ 3.1 million in the 2Q14 to a loss of R$ (382.4) million in the 3Q14, mainly due to the decrease in income from equity accounting of Furnas on their investments in SPEs, especially in Madeira Energia S/A for R$ 790 million. 44 Marketletter Market Data 1.Generation Assets and Energy generated 1.1.Own assets Installed Capacity (MW) Unit Guaranteed Energy (MW Average) Energy generated (MWh) 1Q14 Furnas Luis Carlos Barreto (Estreito) Mascarenhas de Moraes Porto Colômbia Marimbondo 1,216 1,050 476 320 1,440 598 495 295 185 726 Itumbiara Funil Corumbá I Simplício Batalha 2,082 216 375 306 52,50 1,015 121 209 192 48,8 674,710 474,488 1,381,554 1,868,252 196,127 528,348 234,156 - Serra da Mesa (48.46%)* Manso (70%) Santa Cruz Roberto Silveira (Campos) Neblina ** Sinceridade ** Dona Rita ** 1,275 212 932 30 6,468 1,416 2,41 671 92 687 21 4,66 0,37 1,03 423,723* 177,118* 550,325 8,513 724 - 1,294,259 1,058,550 2Q14 3Q14 210,867 232,215 146,381 153,527 379,294 1,030,043 217,655 601,538 721,343 62,858 244,889* 115,069* 721,343 3,004 3,421 683 - 384,912 423,621 262,850 208,404 425,447 1,638,817 151,422 384,947 37,071 66,409 781,664* 97,586* 723,368 353 687 - * Contemplates percentage of participation of Furnas **Desconsidered in the total of Eletrobras installed capacity Unit Furnas Luis Carlos Barreto (Estreito) Mascarenhas de Moraes Porto Colômbia Marimbondo Itumbiara Funil Corumbá I Simplício Batalha Serra da Mesa Manso Santa Cruz Roberto Silveira (Campos) Neblina Sinceridade Dona Rita Location (State) MG SP/MG MG MG/SP SP/MG GO/MG RJ GO RJ MG GO MT RJ RJ MG MG MG Beginning of Operation 03/1963 01/1969 04/1973 03/1973 04/1975 02/1980 04/1969 04/1997 06/2013 05/2014 04/1998 10/2000 03/1967 04/1977 04/2013 04/2013 06/2013 End of Concession 12/2042 12/2042 10/2023 12/2042 12/2042 02/2020 12/2042 12/2042 08/2041 08/2041 11/2038 02/2035 12/2042 07/2027 * * * * Under resposability of Furnas until the conclusion of new bidding to HEU’s Concession 45 Marketletter 1.2.SPE SPE Installed Capacity (MW) Unit Enerpeixe S.A. Baguari Geração de Energia S.A. Retiro Baixo Energética S.A. Foz de Chapecó Energia S.A. Serra do Facão Energia S.A. Madeira Energia S.A. Brasventos Miassaba 3 Geradora de Energia S.A Brasventos Eolo Geradora de Energia S.A. Rei dos Ventos 3 Geradora de Energia S.A. 2Q14 3Q14 271 706,488,88 478,951,01 526,255,84 140 80.20 172,419,63 43,063 27,345 82 39 41,249,40 14,391,26 - 855 432 1,032,086,92 1,372,496,19 1,481,099,29 452 UHE Baguari UHE Foz de Chapecó Energy generated (MWh) 1Q14 UHE Peixe Angical and TL Associada UHE Retiro Baixo Guaranteed Energy (MW Average) UHE Serra do Facão 212,6 182 185,079 255,787 236,398 UHE Santo Antônio* Parque Eólico Miassaba 3 Parque Eólico Rei dos Ventos 1 Parque Eólico Rei dos Ventos 3 3.568,8 2.342,03 1,004,796 1,112,793,72 2,646,625.90 68,47 22,8 43,316,00 30,074,00 59,361,00 58,45 21,9 22,572,00 23,435,00 46,517,00 60,12 21,1 37,238,00 30,122,00 55,427,00 *26 units in Operation up to 3Q14, totalling 2,286.08 MW Participação (%) Usina UHE Peixe Angical UHE Baguari UHE Retiro Baixo UHE Foz de Chapecó UHE Serra do Facão UHE Santo Antônio Brasventos Miassaba 3 Geradora de Energia S.A Brasventos Eolo Geradora de Energia S.A. Rei dos Ventos 3 Geradora de Energia S.A. Localização (Estado) 40.0 15.0 49.0 40.0 49.5 39.0 24.5 24.5 24.5 TO MG MG RS/SC GO RO RN RN RN Início da Operação 06/2006 09/2009 03/2010 10/2010 07/2010 03/2012 02/2014 02/2014 02/2014 Fim da Operação 11/2036 08/2041 08/2041 11/2036 11/2036 06/2043 08/2045 12/2045 12/2045 2.Electric energy purchased for resale 2.1.Own assets System Eletrobras Others Total Unit MWh R$ Million MWh R$ Million MWh R$ Million 1Q14 2Q14 - 3Q14 812,411 138,10 761,971 119,31 908,429 208,74 812,411 138,10 761,971 119,31 908,429 208,74 2.2. SPE UHE Foz de Chapecó System Eletrobras Others Total Unit MWh R$ Million MWh R$ Million MWh R$ Million 1Q14 2Q14 3Q14 - - - 46 Marketletter UHE Santo Antônio System Unit MWh R$ Million MWh R$ Million MWh R$ Million Eletrobras Others Total 1Q14 2Q14 1,457,019,23 343,42 1,457,019,23 343,42 876,556,89 363,48 876,556,89 363,48 1Q14 2Q14 17,890,00 14,284,868,70 17,890,00 14,284,868,70 15,840,00 6,02 15,840,00 6,02 3Q14 769,707.50 199,89 769,707.50 199,89 UHE Peixe Angical System Unit MWh R$ Million MWh R$ Million MWh R$ Million Eletrobras Others Total 3Q14 52,656,00 34,19 52,656,00 34,19 UHE Retiro Baixo System Unit 1Q14 MWh R$ Million MWh R$ Million MWh R$ Million Eletrobras Others Total 2Q14 - 3Q14 - - UHE Baguari* System Unit MWh R$ Million MWh R$ Million MWh R$ Million Eletrobras Others Total 1Q14 2Q14 267 0.07 13,368 3,67 13,635 3,74 586 0.08 29,301 4,03 29,887 4,11 3Q14 675 0.16 34,435 8,21 34,435 8,37 *There were expenses with energy purchases on CCEE (free market) on 2014 just because the GSF and FID application, which reduced the physical guarantee 3.Energy sold 3.1.Own assets 3.1.1. Energy sold by enterprises not affected by 12,783 law Buyer Eletrobras System Others Total Sales model 1Q14 R$ Million MWh 2Q14 R$ Million MWh A B A B 19,44 17,29 633,08 3,72 128,018 108,050 4,014,791 26,248 27,29 17,47 875,37 3,94 A B 652,86 21,01 4,142,809 134,298 902,66 21,41 149,710 109,200 4,570,165 27,789 4,719,875 136,989 3Q14 R$ Million MWh 29,71 17,66 976,32 3,63 1,006,03 21,29 161,398 110,400 5,049,422 25,587 5,210,820 135,986 A – Regulated environment – revenue not from quotas B - Through free market agreements or bilateral contracts 47 Marketletter 3.1.2. Energy sold by enterprises affected by 12,783 law - O&M Buyer Sales model 1Q14 R$ Million MWh 7,22 138,82 250,334.34 4,806,535.32 A B A Eletrobras System Others Total R$ Million 2Q14 MWh 6,45 124,11 3Q14* R$ Million MWh 252,998.70 4,857,692.34 255,778.90 4,911,074 6,78 131,73 B - - - - - - A B 146,04 - 5,056,869.66 - 130,56 - 5,110,691.04 - 138,52 - 5,166,852.48 - A – Regulated environment – revenue from quotas B - Through free market agreements or bilateral contracts 3.2. SPE Enerpeixe S.A. Buyer Sales model A B A B A B Eletrobras System Others Total R$ Million 121,41 121,41 - 1Q14 MWh 630,782,84 630,782,84 - 2Q14 R$ Million MWh 110,86 110,86 - 561,329,05 561,329,05 - 3Q14 R$ Million MWh 115,46 115,46 - 579,697,79 579,697,79 - A – Through Auctions B - Through free market agreements or bilateral contracts UHE Foz do Chapecó Buyer Sales model A B A B A B Eletrobras System Others Total 1Q14 R$ Million MWh 102,89 71,61 102,89 71,61 571.045,99 373.248,00 571.045,99 373.248,00 2Q14 R$ Million MWh 99,58 75,63 99,58 75,63 541,444,04 377,395,20 541,444,04 377,395,20 R$ Million 107,62 76,74 107,62 76,74 3Q14 MWh 571,216,35 381,542,40 571,216,35 381,542,40 A – Through Auctions B - Through free market agreements or bilateral contracts UHE Santo Antônio 1Q14 Buyer Eletrobras System Others Total Sales model A B A B A B R$ Million 6,048 172,599 394,860 178,648 394,860 2Q14 MWh 56,539,00 1,614,463,16 2,648,715,78 1,670,822,16 2,648,715,78 3Q14 R$ Million MWh R$ Million 7,296 212,297 434,645 219,683 434,645 67,986,489 1,947,544,79 2,877,961,48 2,016,631,28 2,877,961,49 8,784 255,948 455,273 264,733 455,273 MWh 79,855,32 2,287,540,18 2,798,095,23 2,367,395,51 2,798,095,23 A – Through Auctions B - Through free market agreements or bilateral contracts 48 Marketletter UHE Serra do Facão Buyer Sales model 1Q14 R$ Million MWh A B A B A B Eletrobras System Others Total 50,72 20,03 50,72 20,03 279,117 110,211 279,117 110,211 2Q14 R$ Million MWh 45,83 25,37 45,83 25,37 248,342 137,477 248,342 137,477 3Q14 R$ Million MWh 48,96 26,06 48,96 26,06 261,157 138,988 261,157 138,988 A – Through Auctions B - Through free market agreements or bilateral contracts UHE Retiro Baixo Buyer Eletrobras System Others Total Sales model 1Q14 R$ Million MWh A B A B A B 13,98 0.38 13,98 0.38 83,020,001 2,161,000 83,020,001 2,161,000 2Q14 R$ Million MWh 12,7 0.4 12,7 0.4 73,831,859 2,184,000 73,831,85 2,184,000 3Q14 R$ Million MWh 14,41 0.39 14,41 0.39 81,814,000 2,208,000 81,814,000 2,208,000 A – Through Auctions B - Through free market agreements or bilateral contracts UHE Baguari Buyer Eletrobras System Others Total Sales model 1Q14 R$ Million A B A B A B 0.250 14,229 14,479 - MWh 0.250 14,229 14,479 - 2Q14 R$ Million MWh 0.253 13,210 13,464 - 1,493 76,637 78,130 - 3Q14 R$ Million MWh 0.276 14,033 14,309 - 1,589 79,445 81,034 - A – Through Auctions B - Through free market agreements or bilateral contracts 4. CCEE settlement (Spot and MRE) Unit Sold Purchased Net 1Q14 2Q14 3Q14 R$ Million MWh MWaverage R$ Million MWh MWaverage R$ Million MWh 541,87 541,87 - 318,04 - MWaverage - - 322,87 -322,87 - 128,90 189,14 - Note: The result of liquidation in CCEEis published in R$ million, including items diverses, and already involves MRE amounts. *Short-term liquidation up to August/14. 49 Marketletter 5. Fuel used to produce electricity Type Unit Special Diesel oil Fuel oil Type B1 Common Diesel oil Gas Other * Ton Litre m3 - Total 1Q14 Quantity R$ million - - 2Q14 Quantity R$ million - Quantity - 273,018,526 - 103,111 - 419,695,402 - 273,018,526 103,111 419,695,402 - 193,595 193,595 3Q13 R$ million - 430,455,358 - 135,966 - 430,455,358 135,966 6.Losses in generation - % 1Q14 2Q14 3Q14 1.05 1.05 1.05 7.Average price– R$/MWh 7.1.Own assets – enterprises not affected by 12,783 law 1Q14 2Q14 3Q14 157.55 190.23 192.14 7.1.1. Own assets – enterprises renewed in terms of the 12,783 law – O&M 1Q14 2Q14 3Q14 28.88 25.55 17.92 7.2. SPE SPE Enerpeixe S.A. Retiro Baixo Energética S.A. Baguari S.A. Foz de Chapecó Energia S.A. Serra do Facão Energia S.A. Madeira Energia S.A. 1Q14 2Q14 3Q14 191.07 168.59 169.19 184.95 181.74 134.27 194.90 172.15 172.32 191.55 184.56 133.71 200.59 176.16 176.59 193.50 187.46 139.39 8.Extension of transmission lines - Km 8.1.Own assets 8.1.1.Transmission line 8.1.1.1. Transmission line – enterprises not affected by 12,783 law From - To Ibiúna - Bateias Circuito 1 Ibiúna - Bateias Circuito 2 Tijuco Preto - Itapeti 3 Tijuco Preto - Itapeti 4 Campos - Macaé 3 Batalha - Paracatu Simplício - Rocha Leão 1 Simplício - Rocha Leão 2 Total Extension (km) 332.0 332.0 21.0 21.0 90.0 85.0 119.0 119.0 1,119.0 Tension (kV) 500 500 345 345 345 138 138 138 Beginning of Operation Mar/03 Mar/03 Jan/13 Jan/13 Jun/10 Sep/13 Jan/13 Jan/13 End of Concession Mayi/2031 May/2031 Apr/2036 Apr/2036 Mar/2035 Aug/2041 Aug/2041 Aug/2041 50 Marketletter 8.1.1.2. Transmission line – enterprises renewed in terms of 12,783 law - O&M From - To Foz do Iguaçu - Ivaiporã 1 Foz do Iguaçu - Ivaiporã 2 Foz do Iguaçu - Ivaiporã 3 Itaberá - Ivaiporã 1 Itaberá - Ivaiporã 2 Itaberá - Ivaiporã 3 Itaberá - Tijuco Preto 1 Itaberá - Tijuco Preto 2 Itaberá - Tijuco Preto 3 Subtotal 765 kV Foz do Iguaçu - Ibiúna Bipolo 1 Foz do Iguaçu - Ibiúna Bipolo 2 Subtotal 600 kV Adrianópolis - Baixada Fluminense Adrianópolis - Cachoeira Paulista 1 Adrianópolis - Grajaú Adrianópolis - Resende Adrianópolis - São José Angra - Cachoeira Paulista Angra - São José Angra - Zona Oeste Araraquara - Campinas Araraquara - Poços de Caldas Baixada Fluminense - Cachoeira Paulista Cachoeira Paulista - Campinas Cachoeira Paulista - Itajubá Cachoeira Paulista - Resende Cachoeira Paulista - Taubaté Cachoeira Paulista - Tijuco Preto Campinas - Itatiba 1 Grajaú - Zona Oeste Gurupi - Miracema Ibiúna - Itatiba 1 Itumbiara - São Simão Marimbondo - Água Vermelha Marimbondo - Araraquara 1 Marimbondo - Araraquara 2 Poços de Caldas - Itajubá Serra da Mesa - Gurupi Serra da Mesa - Samambaia 1 Serra da Mesa - Samambaia 2 Tijuco Preto - Taubaté Subtotal 500 kV Adrianópolis - Itutinga 1 Adrianópolis - Itutinga 2 Adrianópolis - Jacarepaguá 1 Adrianópolis - Jacarepaguá 2 Adrianópolis - Macaé Adrianópolis - Venda das Pedras Bandeirantes - Samambaia 1 Bandeirantes - Samambaia 2 Barro Branco - Ouro Preto Barro Branco - Padre Fialho Campinas - Guarulhos Campinas - Poços de Caldas Campos - Macaé 1 Campos - Macaé 2 Campos - Viana Campos - Vitória Corumbá - Brasília Sul Corumbá - Itumbiara Furnas - Estreito Furnas - Itutinga 1 Furnas - Itutinga 2 Furnas - Mascarenhas de Moraes Furnas - Pimenta Extension (km) Tension (kV) Beginning of Operation End of Concession 322.0 323.0 331.0 265.0 264.0 272.0 305.0 304.0 312.0 2,698.0 792.0 820.0 1,612.0 19.0 171.0 55.0 115.0 33.0 103.0 133.0 97.5 171.0 176.0 160.5 223.0 53.0 56.0 83.0 181.0 26.5 79.0 255.0 86.5 166.0 172.0 195.0 194.0 139.0 256.0 249.0 248.5 108.5 4,005.0 199.0 199.0 38.0 38.0 177.0 107.0 157.0 155.0 59.0 104.5 88.0 126.0 89.0 89.0 199.0 224.0 254.0 79.0 112.0 198.0 199.0 104.0 66.0 765 765 765 765 765 765 765 765 765 Aug/89 Dec/86 Mar/99 Aug/89 Oct/82 May/00 Jul/89 Oct/82 May/01 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 600 600 Mar/85 Aug/87 Dec/42 Dec/42 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 Nov/13 Feb/74 Dec/77 Dec/79 Aug/91 Jun/77 Dec/98 Mar/11 Jul/76 Apr/76 Nov/13 Sep/77 Jul/02 Dec/79 Jun/83 Nov/88 Mar/03 Mar/11 Mar/99 Mar/03 Jan/79 Aug/79 Apr/76 Aug/76 Jul/02 Mar/99 Mar/98 Jan/99 Mar/84 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 345 345 345 345 345 345 345 345 345 345 345 345 345 345 345 345 345 345 345 345 345 345 345 Mar/68 Aug/70 Mar/68 Aug/70 Sep/02 Nov/10 Feb/99 Feb/99 Oct/13 Oct/13 Feb/03 Oct/72 Nov/01 Sep/02 Dec/05 Oct/77 Mar/97 Mar/97 Feb/70 Mar/68 Dec/69 May/68 Mar/67 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 51 Marketletter From - To Furnas - Poços de Caldas 1 Furnas - Poços de Caldas 2 Guarulhos - Ibiúna 1 Guarulhos - Ibiúna 2 Guarulhos - Nordeste Guarulhos - Poços de Caldas 1 Guarulhos - Poços de Caldas 2 Ibiúna - Tijuco Preto 1 Ibiúna - Tijuco Preto 2 Itumbiara - Bandeirantes 1 Itumbiara - Bandeirantes 2 Itumbiara - Porto Colômbia L.C.Barreto - Estreito 1 L.C.Barreto - Estreito 2 L.C.Barreto - Poços de Caldas 1 L.C.Barreto - Poços de Caldas 2 L.C.Barreto - Volta Grande Macaé - Venda das Pedras Marimbondo - Porto Colômbia Mascarenhas - Estreito Mogi - Atibaia Mogi - Nordeste Pimenta - Barreiro Poços de Caldas - Atibaia Porto Colômbia - Volta Grande Samambaia - Brasília Sul 1 Samambaia - Brasília Sul 2 Viana - Vitória Vitória - Padre Fialho Subtotal 345 kV Barro Alto - Niquelândia Brasília Geral - Brasília Sul 1 Brasília Geral - Brasília Sul 2 Barro Alto – Águas Lindas Águas Lindas – Brasília Sul Brasília Sul - Pirineus Itumbiara - Cachoeira Dourada Itumbiara - Rio Verde 1 Itumbiara - Rio Verde 2 Manso - Nobres Pirineus - Xavantes Rio Verde - Barra do Peixe 1 Rio Verde - Barra do Peixe 2 Rio Verde - Cachoeira Dourada 1 Rio Verde - Rondonópolis Serra da Mesa - Niquelândia Subtotal 230 kV Adrianópolis - Cepel 1 Adrianópolis - Cepel 2 Adrianópolis - Magé 1 Adrianópolis - Magé 2 Alcântara - Adrianópolis 1 Alcântara - Adrianópolis 2 Alcântara - Adrianópolis 3 Alcântara - Imbariê - Adrianópolis Angra - Angra (Ampla) Angra - Jacuacanga Angra - Santa Cruz Cachoeira Paulista - Volta Redonda 1 Cachoeira Paulista - Volta Redonda 2 Campos - Cachoeiro do Itapemirim 1 Campos - Cachoeiro do Itapemirim 2 Campos - Iriri Campos - Rocha Leão Couto Magalhães - Parque das Emas Iriri - Rocha Leão Jacarepaguá - Ari Franco Jacarepaguá - Cosmos Jacarepaguá - Mato Alto Extension (km) Tension (kV) Beginning of Operation End of Concession 131.0 131.0 75.0 75.0 35.0 182.0 184.0 97.0 97.0 180.0 180.0 201.0 24.0 24.0 198.0 197.0 112.0 122.0 77.0 13.0 64.5 25.0 198.0 142.5 45.0 12.5 15.0 26.0 220.5 6,144.5 87.0 13.0 13.0 102.0 30.0 107.0 44.0 208.0 202.0 66.0 40.0 240.0 240.0 175.0 257.0 105.0 1,929.0 1.5 1.5 48.0 48.0 19.5 20.0 20.0 19.5 34.0 34.0 96.0 105.0 105.0 106.0 106.0 97.0 110.0 80.5 13.0 10.0 24.0 16.0 345 345 345 345 345 345 345 345 345 345 345 345 345 345 345 345 345 345 345 345 345 345 345 345 345 345 345 345 345 Sep/63 Apr/65 Jun/90 Jul/90 Mar/64 Sep/63 Nov/66 Nov/83 Jul/84 Jul/73 Jul/77 Jun/73 Mar/69 Feb/70 Nov/69 Sep/70 Jun/73 Nov/10 Oct/75 Mar/69 Jan/13 Mar/64 Mar/67 Jan/13 Jun/73 Feb/99 Feb/99 Dec/05 Apr/13 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 Oct/99 Oct/72 Sep/07 Mar/14 Mar/14 Sep/07 Oct/73 Jan/86 Apr/92 May/98 Nov/06 Nov/87 Feb/94 Dec/86 Nov/82 Oct/99 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 Apr/81 Apr/81 Apr/73 Jan/73 Jul/76 Dec/98 Dec/98 May/75 Apr/71 Oct/77 Oct/77 Nov/86 Jun/87 Feb/73 Feb/73 Aug/73 Feb/73 Nov/13 Aug/73 Dec/67 Dec/67 Sep/73 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 52 Marketletter Extension (km) From - To Jacarepaguá – Paciência Paciência - Palmares Jacarepaguá - ZIN Jacuacanga - Brisamar Manso - Nobres Muriqui - Angra (Ampla) Muriqui - Brisamar Palmares - Mato Alto Parque das Emas - Rio Claro Rio Verde - Cachoeira Dourada 2 Rio Verde - Rio Claro Rocha Leão - Magé 1 Rocha Leão - Magé 2 Santa Cruz - Brisamar 1 Santa Cruz - Brisamar 2 Santa Cruz - Jacarepaguá Santa Cruz - Palmares 1 Santa Cruz - Palmares 2 Santa Cruz - ZIN Santa Cruz - ZIN - Ari Franco Santa Cruz - ZIN - Cosmos São José - Imbariê 1 São José - Imbariê 2 São José - Magé 1 São José - Magé 2 UTE Campos - Campos 1 UTE Campos - Campos 2 Subtotal 138 kV Eletrodo de Terra - Foz do Iguaçu 1 Eletrodo de Terra - Foz do Iguaçu 2 Eletrodo de Terra - Ibiúna 1 Eletrodo de Terra - Ibiúna 2 Subtotal 25 kV Total 23.0 5.0 33.0 44.0 70.0 36.0 20.0 13.0 87.5 174.0 87.0 108.0 108.0 20.0 13.0 38.0 14.0 14.0 5.0 31.0 17.0 18.0 18.0 46.0 46.0 1.0 1.0 2,205.0 16.0 15.0 67.0 67.0 165.0 18,758.5 Tension (kV) Beginning of Operation End of Concession 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 Aug/14 Aug/14 Nov/72 Oct/77 Apr/98 Apr/71 Apr/71 Sep/73 Nov/13 Aug/77 Nov/13 Jan/73 Jan/73 Oct/77 Apr/71 Oct/72 Nov/72 Sep/73 Nov/72 Dec/67 Dec/67 Dec/98 Dec/98 Jun/01 Jun/01 Jul/77 Jul/87 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 25 25 25 25 Apr/85 Aug/87 Apr/85 Aug/87 Dec/42 Dec/42 Dec/42 Dec/42 8.1.2.Substation 8.1.2.1. Substation – enterprises not affected by 12,783 law Substation Zona Oeste Transformation capacity (MVA) Location Beginning of Operation End of Concession 900.00 Rio de Janeiro/Rio de Janeiro 03.14.2011 05.10.2042 8.1.2.2. Substation – enterprises renewed in terms of 12,783 law – O&M Substation Transformation capacity (MVA) Adrianópolis Angra Araraquara Bandeirantes Barro Alto Brasília Geral Brasília Sul Cachoeira Paulista Campinas 3,289.96 967.07 1,433.33 149.66 300.00 2,094.20 583.30 1,970.00 Campos 1,283.33 Foz do Iguaçu Grajaú Guarulhos Gurupi Ibiúna 15,968.00 2,800.00 11,600.40 Location Nova Iguaçu/Rio de Janeiro Angra dos Reis/Rio de Janeiro Araraquara/São Paulo Aparecida de Goiânia/Goiás Barro Alto/Goiás Brasília/Brasília Taguatinga/Brasília Cachoeira Paulista/São Paulo Campinas/São Paulo Campos dos Goytacazes/Rio de Janeiro Foz do Iguaçu/Paraná Rio de Janeiro/Rio de Janeiro São Paulo/São Paulo Gurupi/Tocantins Ibiúna/São Paulo Beginning of Operation End of Operation Nov/70 Apr/71 Apr/76 Oct/72 Mar/82 Feb/60 Mar/73 Oct/76 Sep/72 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Feb/73 Dec/42 Dec/82 Dec/79 Sep/63 Mar/99 Apr/84 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 53 Marketletter Transformation capacity (MVA) Substation Imbariê Iriri Itabera Itutinga Ivaiporã Jacarepaguá Macaé Mogi das Cruzes Niquelândia Pirineus Poços de Caldas Resende Rio Verde Rocha Leão Samambaia São José Simplício Usina de São Gonçalo Tijuco Preto Viana Vitória 11,006.00 1,350.00 1,166.66 1,846.66 333.33 4,250.00 2,600.00 42.50 17,.014.70 750.00 1,044.20 End of Operation Corumbá Funil Furnas Itumbiara Luiz C. Barreto Mascarenhas 556.00 300.00 1,399.17 5,074.99 1,333.32 Duque de Caxias/Rio de Janeiro Macaé/Rio de Janeiro Itaberá/São Paulo Itutinga/Minas Gerais Manoel Ribas/Paraná Rio de Janeiro/Rio de Janeiro Macaé/Rio de Janeiro Mogi das Cruzes/São Paulo Niquelândia/Goiás Anápolis/Goiás Poços de Caldas/Minas Gerais Resende/Rio de Janeiro Rio Verde/Goiás Rio das Ostras/Rio de Janeiro Brasília/Distrito Federal Belfort Roxo/Rio de Janeiro Sapucaia/Rio de Janeiro São Gonçalo/Rio de Janeiro Mogi das Cruzes/São Paulo Viana/Espirito Santo Serra/Espirito Santo Campos dos Goytacazes/Rio de Janeiro Caldas Novas/Goiás Itatiaia/Rio de Janeiro São José da Barra/Minas Gerais Araporã/Minas Gerais Pedregulho/São Paulo 1,820.99 Ibiraci/Minas Gerais Dec/56 Dec/42 Marimbondo Manso Porto 2,393.32 312.50 Fronteira/Minas Gerais Chapada dos Guimarães/Mato Grosso Aug/75 Nov/00 Dec/42 Dec/42 Planura/Minas Gerais Jul/73 Dec/42 Santa Cruz Serra da Mesa 1,544.00 1,576.42 Rio de Janeiro/Rio de Janeiro Minaçu/Goiás Jun/67 Mar/98 Dec/42 Dec/42 SE da Usina Campos SE da Usina SE da Usina SE da Usina SE da Usina SE da Usina SE da Usina de Moraes SE da Usina SE da Usina SE da Usina Colômbia SE da Usina SE da Usina Beginning of Operation Location 185.00 425.00 Oct/68 Oct/09 Sep/82 Apr/67 Oct/82 Dec/67 Nov/01 Mar/64 Oct/99 Nov/06 Sep/63 Apr/09 Dec/75 Dec/72 Mar/98 Aug/91 Aug/06 Jul/77 Sep/82 Dec/05 Nov/78 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/68 Dec/42 Mar/97 Dec/69 Sep/63 Mar/73 Mar/69 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 * Total MVA = Operation+reserve+revision 8.2. SPE 8.2.1. Transmission Line SPE From - To Transirapé Transudeste Transleste Enerpeixe S.A. Centroeste de Minas Chapecoense Geração S.A. Chapecoense Geração S.A. Chapecoense Geração S.A. Retiro Baixo Energética S.A. Serra do Facão Energia S.A. Baguari Energia S.A. Baguari Energia S.A. Baguari Energia S.A. Baguari Energia S.A. Transenergia Renovável Transenergia Renovável Transenergia Renovável Transenergia Renovável Transenergia Renovável Transenergia Renovável S.A. S.A. S.A. S.A. S.A. S.A. Irapé – Araçuaí Itutinga – Juiz de Fora Montes Claros – Irapé Peixe Angical – Peixe 2 Furnas – Pimenta II SE Foz do Chapecó – Gurita SE Foz do Chapecó – SE Xanxerê UHE Foz do Chapecó – SE de Foz do Chapecó UHE Retiro Baixo – SE Curvelo UHE Serra do Facão – SE Celg de Catalão UHE Baguari - SE Baguari SE Baguari - Mesquita – Governador Valadares SE Baguari - Mesquita SE Baguari - Gov. Valadares Barra dos Coqueiros - Quirinópolis Quirinópolis - UTE Quirinópolis Quirinópolis - UTE Boavista Chapadão - Jataí Jataí - Mineiros Jataí - UTE Jataí Participation Extension (%) (km) 24.5 65.0 25.0 140.0 24.5 138.0 40.0 17.0 49.0 62.7 40.0 72.6 40.0 77.6 Tension (kV) 230 345 345 500 345 230 230 Beginning of End of Operation Concession May/07 Dec/34 Feb/07 Oct/34 Dec/06 Feb/34 Apr/06 Nov/36 Mar/10 Mar/35 Mar/11 Nov/36 Mar/11 Nov/36 40.0 1.0 230 Mar/11 Nov/36 49.0 45.0 138 Oct/10 Aug/41 49.5 32.0 138 Oct/10 Nov/36 15.0 0.800 230 Feb/10 Aug/41 15.0 2.5 230 Apr/10 Aug/41 15.0 15.0 49.0 49.0 49.0 49.0 49.0 49.0 69.0 26.0 52.3 34.4 16.7 131.5 61.4 51.2 230 230 230 138 138 230 138 138 Apr/10 Apr/10 Apr/11 May/11 May/11 Dec/12 Dec/12 Dec/12 Aug/41 Aug/41 Apr/39 Jun/25 Jun/25 Jun/25 Jun/25 Jun/25 54 Marketletter SPE From - To Transenergia Renovável S.A. Transenergia Renovável S.A. Transenergia Renovável S.A. Transenergia Renovável S.A. Transenergia Renovável S.A. Transenergia Renovável S.A. Interligação Elétrica do Madeira S.A. Goiás Transmissão S.A. Goiás Transmissão S.A. Goiás Transmissão S.A. Jataí - UTE Água Emendada Mineiros - Morro Vermelho Morro Vermelho - UTE Morro Vermelho Morro Vermelho - UTE Alto Taquari Palmeiras - Edéia Edéia - UTE Tropical Bionenergia I TL Coletora Porto Velho - Araraquara II (Lote D) Rio Verde Norte – Trindade Trindade – Xavantes Trindade – Carajás Participation Extension (%) (km) 49.0 32.6 49.0 45.2 Tension (kV) 138 138 Beginning of End of Operation Concession Dec/12 Jun/25 Dec/12 Jun/25 49.0 31.0 138 Dec/12 Jun/25 49.0 49.0 49.0 30.2 57.0 48.7 138 230 138 Jun/13 May/13 May/13 Jun/25 Jun/25 Jun/25 24.5 2,375 600 Aug/13 Feb/39 49.0 49.0 49.0 193 37 29 500 230 230 Dec/13 Dec/13 Oct/13 Feb/40 Feb/40 Feb/40 8.2.2. Substations SPE Substation Caldas Novas Transmissão S.A. Transenergia São Paulo S.A Transenergia Renovável S.A Transenergia Renovável S.A Transenergia Renovável S.A Transenergia Renovável S.A Transenergia Renovável S.A Baguari Energia S.A. Chapecoense Geração S.A Enerpeixe S.A. Retiro Baixo Energética S.A. Madeira Energia S.A. Serra do Facão Energia S.A. Goiás Transmissão S.A. Transformation Capacity (MVA) Participation (%) 150 800.00 150.00 225.00 225.00 155.60 978.00 525.00 100.00 3,630.00 236.40 400.00 49.90 49.00 49.00 49.00 49.00 49.00 49.00 15.00 40.00 40.00 49.00 39.00 49.47 49.00 Corumbá Itatiba Edéia Jataí Mineiros Morro Vermelho Quirinópolis SE da Usina de Baguari SE da Usina de Foz do Chapecó SE da Usina de Peixe Angical SE da Usina de Retiro Baixo SE da Usina de Santo Antônio SE da Usina de Serra do Facão Trindade Beginning of Operation Aug/13 Aug/12 Feb/12 Dec/12 Dec/12 Dec/12 Apr/11 Aug/06 Nov/01 Nov/01 Aug/06 Aug/07 Nov/01 Nov/13 End of Operation Jun/41 Nov/39 Jun/25 Jun/25 Jun/25 Jun/25 Jun/25 Aug/41 Nov/36 Nov/36 Aug/41 Jun/43 Nov/36 Jul/40 9. Transmission losses - % 1Q14 2Q14 3Q14 2.27 2.29 1.98 Note: The total of loss in the basic network is determined by the difference between the total amount generated and the total amount of consumption verified in SIN, being absorved in the portion of 50% consumers, 50% for the participants of the loss ratio of the basic network. 55 Marketletter 10. Main investments of parent company– R$ Million Project 1Q14 Generation Installation of Combined Cycle TPU Santa Cruz (RJ)/Capacity expansion of Sta. Cruz Thermal Unit (RJ) Installation of HPU Batalha (Paulista) (MG/GO) Installation of HPU Simplício and SHU Anta (RJ) Modernization of HPU Furnas (MG) Modernization of HPU Luiz Carlos Barreto (MG) Maintenance of the generation system Extension of generation system Deployment of wind farms Implementation of UTE biomass Extension of generation capacity Transmission Transmission System Bom Despacho – Ouro Preto Installation of Transmission Line Macaé (RJ) - Campos (RJ) Installation of Transmission Line Tijuco Preto-Itapeti-Nordeste Installation of Transmission System Mascarenhas - Linhares Reinforcement of Transmission System Transmission System maintenance Extension of transmission in the Mid-Western Region / Extension of transmission system Others Maintenance of real estate Maintenance of real estate, vehicles, turbines and equipment Maintenance of info technology assets Environmental preservation and conservation of generation and transmission Total First revision 2014 2Q14 3Q14 143,573 3,697,734 6,862,629 9,987,075 2,673,421 - 54,772 4,211,695 1,744,736 9,527,466 4,454,633 - 11,526,993 7,877,880 4,441,732 6,915,232 5,221,232 - 75,000,000 29,706,852 43,028,206 56,816,722 59,175,224 100,000 28,840,836 100,000 100,000 3,515,448 5,592,902 2,027,209 14,775,114 37,512,106 8,858,875 6,690,040 703,035 43,365,735 64,240,115 4,657,808 4,974,090 4,524,979 61,458,636 76,629,343 21,717,886 21,468,376 30,294,939 320,769,676 434,997,984 6,316,239 6,483,664 6,241,398 45,058,633 322,506 3,234,740 2,424,953 698,343 10,798,654 6,039,006 1,114,073 5,264,260 4,921,490 12,010,235 52,139,871 40,074,923 1,259,178 100,344,826 2,219,518 170,090,288 3,900,272 209,669,416 24,995,028 1,296,395,391 11.New investments 11.1.Generation 11.1.1.Own assets Unit Own assets UHE Simplício/ PCH Anta Location (State) RJ/MG Total of Investment Investment up to 3Q14 (R$ (R$ million) million) 2.289,51 Basis: Dec/08 Installed capacity (MW) Guaranteed Beginning Beginning of End of Energy of Construction Concession (MW) Operation UHE Simplício: came into commercial Operation on jun/2013 2,472 333.7 191.3 Mar/07 Aug/41 PCH Anta: Forecasted Machine 1 Jan/2015 and machine 2 Jun/2015 56 Marketletter 11.1.2. SPE SPE Unit Cia. Hidrelétrica Teles Pires Madeira Energia S.A. Consórcio Terra Nova S.A. Central Geradora Eólica Famosa I S.A. Central Geradora Eólica Pau Brasil S.A. Central Geradora Eólica Rosada S.A. Central Geradora Eólica São Paulo S.A. Energia dos Ventos I Energia dos Ventos II Energia dos Ventos III Energia dos Ventos IV Energia dos Ventos V Energia dos Ventos VI Energia dos Ventos VII Energia dos Ventos VIII Energia dos Ventos IX Energia dos Ventos X Consórcio Bom Jesus Consórcio Cachoeira Consórcio Pitimbu Consórcio São Caetano Consórcio São Caetano I Consórcio São Galvão Consórcio Carnaúba I Consórcio Carnaúba II Consórcio Carnaúba III Consórcio Carnaúba V Consórcio Cervantes I Consórcio Cervantes II Consórcio Punaú I Consórcio Arara Azul Consórcio Bentevi Consórcio Ouro Verde I Consórcio Ouro Verde II Consórcio Ouro Verde III Consórcio Santa Rosa Consórcio Uirapuru Consórcio Ventos do Angelim Consórcio Serra do Mel Consórcio Serra do Mel Consórcio Serra do Mel Consórcio Casa dos Ventos I Consórcio Casa dos Ventos I Consórcio Casa dos Ventos I Consórcio Casa dos Ventos I Consórcio Casa dos Ventos I Consórcio Casa dos Ventos I Consórcio Consórcio Consórcio Consórcio Casa Casa Casa Casa dos dos dos dos Ventos Ventos Ventos Ventos I I I I UHE Teles Pires UHE Santo Antônio UHE São Manoel Famosa I Pau Brasil Rosada São Paulo Goiabeira Ubatuba Santa Catarina Pitombeira São Januário Nossa Senhora de Fátima Jandaia São Clemente Jandaia I Horizonte Bom Jesus Cachoeira Pitimbu São Caetano São Caetano I São Galvão Carnaúba I Carnaúba II Carnaúba III Carnaúba V Cervantes I Cervantes II Punaú I Arara Azul Bentevi Ouro Verde I Ouro Verde II Ouro Verde III Santa Rosa Uirapuru Ventos de Angelim Serra do Mel I Serra do Mel II Serra do Mel III Itaguaçu da Bahia Ventos de Santa Luiza Ventos de Santa Madalena Ventos de Santa Marcella Ventos de Santa Vera Ventos de Santo Antônio Ventos de São Bento Ventos de São Cirilo Ventos de São João Ventos de São Rafael MT MT MT/PA RN RN CE RN CE CE CE CE CE Installed Capacity (MW) 1,820.0 3,568.8 700.0 22.5 15.0 30.0 17.5 19.2 12.6 16.0 27.0 19.2 CE 28.8 12.8 Jan/16 Nov/14 Jun /47 CE CE CE CE CE CE CE CE CE CE RN RN RN RN RN RN RN RN RN RN RN RN CE CE CE RN RN RN BA BA 28.8 19.2 19.2 14.4 18.0 12.0 18.0 25.2 18.0 22.0 22.0 18.0 16.0 24.0 16.0 12.0 24.0 28.0 14.0 26.0 28.0 24.0 20.0 28.0 22.0 28.0 28.0 28.0 28.0 28.0 28.0 14.1 9.3 9.9 7.3 8.1 5.0 7.2 11.0 7.7 9.5 9.4 7.3 7.5 10.1 7.1 5.6 11.0 10.7 5.7 10.7 11.2 9.4 8.4 12.6 10.3 13.0 12.8 12.5 14.0 14.2 Jan/16 Jan/16 Jan/16 Jan/16 Sep/15 Sep/15 Sep/15 Sep/15 Sep/15 Sep/15 Sep/15 Sep/15 Sep/15 Sep/15 Sep/15 Sep/15 Sep/15 May/18 May/18 May/18 May/18 May/18 May/18 May/18 May/18 May/18 May/18 May/18 May/18 May/18 Apr/15 May/15 Dec/14 Apr/14 Oct/14 Oct/14 Oct/14 Oct/14 Oct/14 Oct/14 Oct/14 Oct/14 Oct/14 Oct/14 Oct/14 Oct/14 Oct/14 Dec/16 Dec/16 Dec/16 Dec/16 Dec/16 Dec/16 Oct/16 Dec/16 Jun/17 Jun/17 Jun/17 Mar/17 Mar/17 Aug/47 Aug/47 Jul /47 Jul /47 May/49* May/49* May/49* May/49* May/49* May/49* May/49* May/49* May/49* May/49* May/49* May/49* May/49* Aug/49* Aug/49* Aug/49* Aug/49* Aug/49* Aug/49* Aug/49* Aug/49* Aug/49* Aug/49* Aug/49* Aug/49* Aug/49* 14.7 May/18 Mar/17 Aug/49* 13.6 May/18 Mar/17 Aug/49* 28.0 28.0 15.2 May/18 Mar/17 Aug/49* 16.1 May/18 Mar/17 Aug/49* 28.0 28.0 28.0 28.0 14.4 14.7 15.0 13.8 May/18 May/18 May/18 May/18 Mar/17 Mar/17 Mar/17 Mar/17 Aug/49* Aug/49* Aug/49* Aug/49* Location BA BA BA BA BA BA BA BA 28.0 Energy Beginning Beginning of Assured of Construction (MW) Operation 915.4 Jan/15 Aug/11 2,342.03 Mar/12 Aug/08 421.7 May/18 Aug/14 11.1 Jul/15 Jul/14 7.7 Jul/15 Jul/14 13.4 Jul/15 Jul/14 8.1 jul/15 Jul/14 9.9 Jan/16 Jul/14 5.8 Jan/16 Mar/14 8.5 Jan/16 Mar/14 13.9 Jan/16 Mar/14 9.0 Jan/16 Jul/15 End of Concession Jun/46 Dec/43 Apr/49 Dec /45 May/47 Mar/47 Sep/48 Mar/47 Jun /47 Jun /47 Jun /47 Jun /47 57 Marketletter 11.10.2.1 SPE SPE Unit Cia. Hidrelétrica Teles Pires UHE Teles Pires Madeira Energia S.A. UHE Santo Antônio Empresa de Energia São UHE São Manoel Manoel S.A. Investiment (R$ million) Total Up to 3Q14 Working Schedule (%) Participation (%) 4,452.76 3,882.00 92.07 24.5 20,066.00 16,615.00 92.55 39.0 2,474.0 n/a n/a 33.333 Central Geradora Eólica Famosa I S.A. Famosa I 80.0 3.81 2.5 49.0 Central Geradora Eólica Pau Brasil S.A. Pau Brasil 52.0 2.54 2.5 49.0 Central Geradora Eólica Rosada S.A. Rosada 105.0 4.76 2.5 49.0 Central Geradora Eólica São Paulo S.A. São Paulo 75.0 2.86 2.5 49.0 Energia dos Ventos I Goiabeira 62.0 0.33 12.0 49.0 Energia dos Ventos II Ubatuba 41.0 0.25 12.0 49.0 Energia dos Ventos III Santa Catarina 66.0 0.31 12.0 49.0 Energia dos Ventos IV Pitombeira 100.0 0.40 12.0 49.0 Energia dos Ventos V São Januário 75.0 0.31 12.0 49.0 Energia dos Ventos VI Nossa Senhora de Fátima 100.0 0.36 12.0 49.0 Energia dos Ventos VII Jandaia 100.0 0.39 12.0 49.0 São Clemente 75.0 0.29 12.0 49.0 Energia dos Ventos IX Jandaia I 75.0 0.32 12.0 49.0 Consórcio Bom Jesus Bom Jesus 79.0 14.6 18 49.00 Consórcio Cachoeira Cachoeira 53.0 9.7 18 49.00 Consórcio Pitimbu Pitimbu 79.0 14.6 18 49.00 Consórcio São Caetano São Caetano 111.0 21.1 19 49.00 Consórcio São Caetano I São Caetano I 79.0 14.6 18 49.00 Consórcio São Galvão São Galvão 97.0 19.4 20 49.00 Consórcio Carnaúba I Carnaúba I 91.0 17.1 18 49.00 Energia dos Ventos VIII Partners Eletrosul (24.5%) Neoenergia (50.10%) Odebrecht Part. Invest. (0.9%) Odebrecth Energia (18.6%) Cemig (10.0%) Andrade Gutierrez (12.4%) Fundo de Invest. e Participações Amazônia Energia (20.0%) EDP – Energias do Brasil S.A. (66.667%) Empresa Brasileira de Desenvolvimento e Participações S.A. (35.70%) Comercial Mineira S.A (15.25%) Ventos Tecnologia Elétrica S.A. (0.05%) Empresa Brasileira de Desenvolvimento e Participações S.A. (35.70%) Comercial Mineira S.A (15.25%) Ventos Tecnologia Elétrica S.A. (0.05%) Empresa Brasileira de Desenvolvimento e Participações S.A. (35.70%) Comercial Mineira S.A (15.25%) Ventos Tecnologia Elétrica S.A. (0.05%) Empresa Brasileira de Desenvolvimento e Participações S.A. (35.70%) Comercial Mineira S.A (15.25%) Ventos Tecnologia Elétrica S.A. (0.05%) Alupar (50.99%) Central Eólica Goiabeira (0.01%) Alupar (50.99%) Central Eólica Ubatuba (0.01%) Alupar (50.99%) Central Eólica Santa Catarina (0.01%) Alupar (50.99%) Central Eólica Pitombeira (0.01%) Alupar (50.99%) Central Eólica São Januário (0.01%) Alupar (50.99%) Central Eólica Nossa Senhora de Fátima (0.01%) Alupar (50.99%) Central Eólica Jandaia (0.01%) Alupar (49%) Central Eólica São Clemente (0.01%) Alupar (50.99%) Central Eólica Jandaia I (0.01%) Fundo de Investimento em Participações Caixa Milão (50.99%) Central Eólica Bom Jesus Ltda. (0.01%) Fundo de Investimento em Participações Caixa Milão (50.99%) Central Eólica Cachoeira Ltda. (0.01%) Fundo de Investimento em Participações Caixa Milão (50.99%) Central Eólica Pitimbu Ltda. (0.01%) Fundo de Investimento em Participações Caixa Milão (50.99%) Central Eólica São Caetano Ltda. (0.01%) Fundo de Investimento em Participações Caixa Milão (50.99%) Central Eólica São Caetano I Ltda. (0.01%) Fundo de Investimento em Participações Caixa Milão (50.99%) Central Eólica São Galvão Ltda. (0.01%) Fundo de Investimento em Participações Caixa Milão (50.99%) 58 Marketletter SPE Unit Investiment (R$ million) Total Up to 3Q14 Working Schedule (%) Participation (%) Consórcio Carnaúba II Carnaúba II 75.0 14.0 18 49.00 Consórcio Carnaúba III Carnaúba III 67.0 12.5 18 49.00 Consórcio Carnaúba V Carnaúba V 100.0 18.7 18 49.00 Consórcio Cervantes I Cervantes I 67.0 12.5 18 49.00 Consórcio Cervantes II Cervantes II 50.0 9.3 18 49.00 Consórcio Punaú I Punaú I 100.0 18.7 18 49.00 Consórcio Arara Azul Arara Azul 98.0 0 0 90.00 Consórcio Bentevi Bentevi 55.0 0 0 90.00 Consórcio Ouro Verde I Ouro Verde I 98.0 0 0 90.00 Consórcio Ouro Verde II Ouro Verde II 106.0 0 0 90.00 Consórcio Ouro Verde III Ouro Verde III 89.0 0 0 90.00 79.0 0 0 90.00 107.0 0 0 90.00 91.0 0 0 90.00 Consórcio Santa Rosa Santa Rosa Consórcio Uirapuru Uirapuru Consórcio Ventos do Angelim Ventos de Angelim Consórcio Serra do Mel Serra do Mel I 135.29 0 0 90.00 Consórcio Serra do Mel Serra do Mel II 135.29 0 0 90.00 Consórcio Serra do Mel Serra do Mel III 135.29 0 0 90.00 Consórcio Casa dos Ventos I Itaguaçu da Bahia 127.2 2.3 1.8 49.00 Consórcio Casa dos Ventos I Ventos de Santa Luiza 127.2 2.3 1.8 49.00 Consórcio Casa dos Ventos I Ventos de Santa Madalena 127.2 2.3 1.8 49.00 Partners Central Geradora Eólica Carnaúba I Ltda. (0.01%) Fundo de Investimento em Participações Caixa Milão (50.99%) Central Geradora Eólica Carnaúba II Ltda. (0.01%) Fundo de Investimento em Participações Caixa Milão (50.99%) Central Geradora Eólica Carnaúba III Ltda. (0.01%) Fundo de Investimento em Participações Caixa Milão (50.99%) Central Geradora Eólica Carnaúba V Ltda. (0.01%) Fundo de Investimento em Participações Caixa Milão (50.99%) Central Geradora Eólica Cervantes I Ltda. (0.01%) Fundo de Investimento em Participações Caixa Milão (50.99%) Central Geradora Eólica Cervantes II Ltda. (0.01%) Fundo de Investimento em Participações Caixa Milão (50.99%) Central Geradora Eólica Punaú I Ltda. (0.01%) Eólica Tecnologia LTDA (7.0%) Ventos Tecnologia Elétrica LTDA (2.99%) Central Eólica Arara Azul Ltda (0.01%) Eólica Tecnologia LTDA (7.0%) Ventos Tecnologia Elétrica LTDA (2.99%) Central Eólica Bentevi Ltda (0.01%) Eólica Tecnologia LTDA (7.0%) Ventos Tecnologia Elétrica LTDA (2.99%) Central Eólica Ouro Verde I Ltda (0.01%) Eólica Tecnologia LTDA (7.0%) Ventos Tecnologia Elétrica LTDA (2.99%) Central Eólica Ouro Verde II Ltda (0.01%) Eólica Tecnologia LTDA (7.0%) Ventos Tecnologia Elétrica LTDA (2.99%) Central Eólica Ouro Verde III Ltda (0.01%) Eólica Tecnologia LTDA (7.0%) Ventos Tecnologia Elétrica LTDA (2.99%) Central Eólica Santa Rosa Ltda (0.01%) Eólica Tecnologia LTDA (7.0%) Ventos Tecnologia Elétrica LTDA (2.99%) Central Eólica Uirapuru Ltda (0.01%) Eólica Tecnologia LTDA (7.0%) Ventos Tecnologia Elétrica LTDA (2.99%) Centrais Eólicas (0.01%) Eólica Tecnologia LTDA (9.99%) Gestamp Eólica Brasil LTDA (0.01%) Eólica Tecnologia LTDA (9.99%) Gestamp Eólica Brasil LTDA (0.01%) Eólica Tecnologia LTDA (9.99%) Gestamp Eólica Brasil LTDA (0.01%) Salus Fundo de Investimento em Participações (49.0%) Casa dos Ventos Energias Renováveis S.A. (2.0%) Salus Fundo de Investimento em Participações (49.0%) Casa dos Ventos Energias Renováveis S.A. (2.0%) Salus Fundo de Investimento em Participações (49.0%) Casa dos Ventos Energias Renováveis S.A. 59 Marketletter SPE Investiment (R$ million) Total Up to 3Q14 Unit Working Schedule (%) Participation (%) Consórcio Casa dos Ventos I Ventos de Santa Marcella 127.2 2.3 1.8 49.00 Consórcio Casa dos Ventos I Ventos de Santa Vera 127.2 2.3 1.8 49.00 Consórcio Casa dos Ventos I Ventos de Santo Antônio 127.2 2.3 1.8 49.00 Consórcio Casa dos Ventos I Ventos de São Bento 127.2 2.3 1.8 49.00 Consórcio Casa dos Ventos I Ventos de São Cirilo 127.2 2.3 1.8 49.00 Consórcio Casa dos Ventos I Ventos de São João 127.2 2.3 1.8 49.00 Consórcio Casa dos Ventos I Ventos de São Rafael 127.2 2.3 1.8 49.00 Partners (2.0%) Salus Fundo de Investimento em Participações (49.0%) Casa dos Ventos Energias Renováveis (2.0%) Salus Fundo de Investimento em Participações (49.0%) Casa dos Ventos Energias Renováveis (2.0%) Salus Fundo de Investimento em Participações (49.0%) Casa dos Ventos Energias Renováveis (2.0%) Salus Fundo de Investimento em Participações (49.0%) Casa dos Ventos Energias Renováveis (2.0%) Salus Fundo de Investimento em Participações (49.0%) Casa dos Ventos Energias Renováveis (2.0%) Salus Fundo de Investimento em Participações (49.0%) Casa dos Ventos Energias Renováveis (2.0%) Salus Fundo de Investimento em Participações (49.0%) Casa dos Ventos Energias Renováveis (2.0%) S.A. S.A. S.A. S.A. S.A. S.A. S.A. 11.2.Transmission 11.2.1.Own assets 11.2.1.1.Transmission lines Own lines From – to TL Itapeti – Nordeste TL Bom Despacho 3 – Ouro Preto 2 * TL Mascarenhas – Linhares and SE Linhares ** TL Xavantes – Pirineus Total of Investment (R$ million) Investment up to 3Q14 (R$ million) Extension of lines (km) Tension (kV) Beginning of Operation End of Concession 166.00 Basis: Oct/05 226.01 29 345 Dec/14 Apr/36 120.1 Basis: Dec/08 146.11 180 500 ** Jan/39 67.20 Basis: Nov/09 32.41 99 230 Jul/15 Jul/40 31.18 Basis: Sep/11 17.24 50 230 Nov/15 Dec/41 *Considers, in addition to the TL 500 kV Bom Despacho 3-Ouro Preto, the SE Bom Despacho 3 (Cemig) – C and Ouro Preto 2 (Cemig)-3A. ** It is ready to come into commercial Operation, just waiting for the Operation license ***Includes, in addition to the TL 230 kV Mascarenhas-Linhares, the SE Mascarenhas (Escelsa) and Linhares (Escelsa). 60 Marketletter 11.2.1.2.Substations Total of Investment (R$ million)* SE SE Zona Oeste 500/ 138 kV (Auction 002/12, Part E) 43.38 Basis: Mar/12 Investment up to 3Q14 (R$ million)** Transformation capacity Location (State) Beginning of Operation End of Concession 35.49 Installation of 500/138 kV – (3+1R) x 300 MVA transformer plus respective connections to transformers RJ Oct/14 May/42 11.2.2. SPE 11.2.2.1. Transmission Lines SPE Transenergia Goiás S.A. MGE Transmissão S.A. Triângulo Mineiro Transmissora S.A. Paranaíba Transmissora de Energia S.A. From – To Serra da Mesa Niquelândia Niquelândia - Barro Alto Mesquita - Viana 2 Viana 2 - Viana Participation (%) Investment* (R$ Million) Up to 3Q14 (R$ million) 49 130,00 6,89 49 375,69 364,42 Marimbondo II - Assis 49 324,84 46,1 Barreiras II - Rio das Éguas Rio das Éguas - Luziânia Luziânia - Pirapora II 24.5 917,58 125,0 49.9 32,63 1,35 Lago Azul Transmissora Barro Alto - Itapaci S.A. Mata de Santa Itatiba - Bateias Genebra Araraquara II - Itatiba Transmissora Araraquara II - Fernão S.A. Dias Vale do São Luziânia - Brasília Leste Bartolomeu Samambaia - Brasília Sul Transmissora de Brasília Sul - Brasília Geral Energia S.A. Belo Monte Transmissora de Xingu – Estreito Energia S.A. Extensio n of TL (km) Tension (kV) 100 230 88 248 230 500 10 345 296.5 Beginning Endo of of Concession Operation Dec/15 Nov/39 Aug/15 Jun/14 Jul/40 500 Dec/15 Aug/43 500 May/16 May/43 230 Sep/16 Feb/44 500 Sep/17 Feb/44 Jul/16 Oct/43 Feb/18 Jun/44 244 49.9 1,843.8 34,20 373 350 69 399 207 241 39.0 24.5 269,65 (Basis: Jul/2013) 15,32 2,237.55 - 67 14 500 345 13.5 230 2,100 800 * Based on the business plan of the enterprise. 61 Marketletter 11.2.2.2. Subestações SPE Luziânia Niquelândia Transmissora S.A. Substation Participation Investiment Transformation (%) (R$ million) Capacity (MVA) SE Luziânia e SE Niquelândia SE Santa Bárbara D’Oeste 440 kV, Compensador Estático (-300,+300) Mvar Mata de Santa SE Itatiba 500 kV, Genebra Compensador Estático Transmissora S.A. (-300,+300) Mvar SE 500/440 kV Fernão Dias (9+1R) Vale do São Bartolomeu Transmissora de SE Brasília Leste Energia S.A. Estação Conversora CA/CC,±800 kV, 4.000 Belo Monte MW, junto a SE 500 kV Transmissora de Xingu Energia S.A. Estação Conversora CA/CC, ±800 kV, 3.850 MW, junto a SE 500 kV Estreito Location Beginning of Operation Endo f Concession 49.0 39.3 255 Luziânia (GO) / Niquelândia (GO) Aug/15 May/42 49.9 1,843.8 4,000 SP Feb/18 Feb/44 39.0 269.65 180 DF Jul/16 Oct/43 3,400 Xingu(PA) 24.5 2,162.00 Feb/08 Jun/44 3,300 Estreito(MG) 12. Loans and financing – R$ Million Local currency - LC Creditor Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras - Eletronet BNDES BNDES Balance 03.31.14 Balance 06.30.14 Balance 09.30.14 32 63 7 255 1 355 216 678 3 594 610 264 2 144 818 193 31 60 6 254 0 358 218 684 2 590 606 263 2 144 802 189 29 57 5 249 0 357 217 680 2 577 594 258 2 144 785 185 BNDES 46 45 44 FINEP FINEP 68 95 68 95 68 95 Due Date Index 03/30/2018 12/30/2018 12/30/2015 03/30/2023 10/30/2014 06/30/2030 12/30/2030 11/30/2029 03/30/2017 12/30/2021 07/30/2022 12/30/2022 03/30/2020 08/30/2020 07/15/2026 12/15/2025 07/15/2026 and 05/15/2018 11/15/2023 11/15/2023 9.5% py 7% py 7% py IPCA + 7% py 6.5% py IPCA + 7 % py IPCA + 7 % py IPCA + 7% py 6.5% py IPCA + 7% py IPCA + 7% py IPCA + 7% py 6.5% py Selic TJLP + 1.91% py TJLP + 3% py TJLP + 2.18% py and TJLP + 6% py 3.5% py TJLP – 1.5% py 8.7% py and TJLP + 4% py 111% CDI 111% CDI 111% CDI 111% CDI 113.7% CDI 110% CDI 107.3% CDI 115% CDI 102.89% CDI Caixa Econômica Federal 10 9 9 01/17/2022 Caixa Econômica Federal Caixa Econômica Federal Caixa Econômica Federal Caixa Econômica Federal Caixa Econômica Federal Banco do Brasil S.A. Banco do Brasil S.A. Banco do Brasil S.A. Basa Total 217 428 91 119 1,040 211 775 405 203 7,943 223 440 89 116 1,014 217 756 416 209 7,906 217 408 91 120 1,046 212 778 412 204 7,845 07/27/2020 08/03/2020 10/15/2020 10/26/2020 05/16/2023 02/07/2018 10/31/2018 12/06/2023 07/31/2017 62 Marketletter Foreign currency - FC Creditor Balance 03.31.14 Eletrobras Eletrobras BID Total Balance 06.30.14 38 153 234 425 Balance 09.30.14 32 133 250 415 36 138 279 453 Due Date Currency 04/06/2018 04/06/2018 12/15/2031 US$ Yen US$ 13.Contracts 13.1.Loans and financing 13.1.1.Parent company – R$ million Loans and financing By activity Generation Transmission By creditor Eletrobras Others Total 2014 2015 2016 2017 2018 After 2018 Total (LC + FC) 417 88 85 32 397 82 850 83 1,783 63 4,277 141 7,809 489 299 206 505 86 31 117 320 159 479 352 581 933 340 1,506 1,846 1,948 2,470 4,418 3,345 4,953 8,298 13.1.2. SPE (R$) Foz do Chapecó Loans and financing By activity Generation Transmission By creditor BNDES REPASSADORES SINCRONO Total 2014 2015 2016 2017 2018 After 2018 666,127,012.47 - 611,875,629.55 - 559,801,107.89 - - - - 440,046,744.47 222,736,149.67 3,344,118.33 666,127,012.47 404,233,663.09 204,569,882.71 3,072,083.75 611,875,629.55 369,830,798.15 187,159,679.93 2,810,629.81 559,801,107.89 - - - Santo Antônio Loans and financing By activity Generation Transmission By creditor BNDES Direto BNDES Repasse Banco da Amazônia - FNO 2nd bonds emission 3rd bonds emission Total 2014 4,319,996,670.34 - 2015 4,483,723,916.15 - 2016 2017 2018 After 2018 4,426,515,626.67 - - - - 1,913,105,187.01 1,988,973,962.06 1,958,973,862.47 1,977,757,919.67 2,054,939,679.59 2,025,815,332.47 244,057,489.55 243,841,300.69 234,470,943.78 185,076,074.10 195,968,973.81 207,255,487.95 285,695,456.60 302,510,443.21 319,933,679.64 4,319,996,670.34 4,483,723,916.15 4,426,515,626.67 - - - Teles Pires Loans and financing By activity Generation Transmission By creditor FI-FGTS Total 2014 2015 2016 2017 2018 After 2018 173,037,033.60 - 162,540,427.20 - 152,043,820.80 - - - - 173,037,033.60 173,037,033.60 162,540,427.20 162,540,427.20 152,043,820.80 152,043,820.80 - - - 63 Marketletter Centro Oeste de Minas Loans and financing By activity Generation Transmission By creditor BNDES Total 2014 2015 2016 2017 2018 After 2018 9,889,962.50 8,737,733.90 7,585,505.30 - - - 9,889,962.50 9,889,962.50 8,737,733.90 8,737,733.90 7,585,505.30 7,585,505.30 - - - Serra do Facão Loans and financing By activity Generation Transmission By creditor BNDES Total 2014 2015 2016 2017 2018 After 2018 237,058,447.79 - 218,157,748.57 - 199,257,049.34 - - - - - 237,058,447.79 237,058,447.79 218,157,748.57 218,157,748.57 199,257,049.34 199,257,049.34 - - - - 2014 2015 2016 595,383,713.40 575,988,516.42 550,940,961.44 - - - - 72,310,482.46 421,601,968.04 101,471,262.90 595,383,713.40 75,897,475.29 389,969,809.70 110,121,231.43 575,988,516.42 77,192,570.55 358,337,651.35 115,410,739.54 550,940,961.44 - - - - Total Interligação Elétrica do Madeira Loans and financing By activity Generation Transmission By creditor Banco da Amazônia BNDES Bonds Total 2017 2018 After 2018 Total Goiás Transmissão Loans and financing By activity Generation Transmission By creditor Brasil – FCO BNDES Total After 2018 2014 2015 2016 2017 2018 Total 95,587,666.13 91,915,959.64 88,244,253.15 - - - - 49,385,359.38 46,202,306.75 95,587,666.13 49,385,359.38 42,530,600.26 91,915,959.64 49,385,359.38 38,858,893.77 88,244,253.15 - - - - After 2018 MGE Transmissão Loans and financing By activity Generation Transmission By creditor BNDES Total 2014 2015 2016 2017 2018 Total 51,227,180.74 46,987,689.92 42,748,199.10 - - - - 51,227,180.74 51,227,180.74 46,987,689.92 46,987,689.92 42,748,199.10 42,748,199.10 - - - - 64 Marketletter Transenergia São Paulo Loans and financing By activity Generation Transmission By creditor BNDES LP Total After 2018 2014 2015 2016 2017 2018 Total 16,630,150.68 15,204,709.20 13,779,267.71 - - - - 16,630,150.68 16,630,150.68 15,204,709.20 15,204,709.20 13,779,267.71 13,779,267.71 - - - - Transenergia Renovável Loans and financing By activity Generation Transmission By creditor BNDES LP Total 2014 2015 2016 2017 2018 After 2018 68,144,455.86 62,421,738.15 56,699,020.14 - - - - 68,144,455.86 68,144,455.86 62,421,738.15 62,421,738.15 56,699,020.14 56,699,020.14 - - - - Total Brasventos Eolo Geradora de Energia Loans and financing By activity Generation Transmission By creditor BNDES LP Total 2017 2018 After 2018 2014 2015 2016 Total 30,269,536.83 - 28,229,370.05 - 26,188,386.59 - - - - - 30,269,536.83 30,269,536.83 28,229,370.05 28,229,370.05 26,188,386.59 26,188,386.59 - - - - Brasventos Miassaba 3 Geradora de Energia Loans and financing By activity Generation Transmission By creditor BNDES LP Total After 2018 2014 2015 2016 2017 2018 Total 30,476,096.32 - 28,422,007.43 - 26,367,096.29 - - - - - 30,476,096.32 30,476,096.32 28,422,007.43 28,422,007.43 26,367,096.29 26,367,096.29 - - - - 2018 After 2018 Rei dos Ventos 3 Geradora de Energia Loans and financing By activity Generation Transmission By creditor BNDES LP Total 2014 2015 2016 2017 Total 31,901,033.96 - 29,750,904.27 - 27,599,913.89 - - - - - 31,901,033.96 31,901,033.96 29,750,904.27 29,750,904.27 27,599,913.89 27,599,913.89 - - - - 65 Marketletter 14.Number of employees 14.1.By tenure Composition of employees by tenure (Years) 1Q14 2Q14 3Q14 Up to 5 6 to 10 11 to15 16 to 20 21 to 25 Up to 25 Total 745 1,307 334 255 225 658 3,524 672 1,387 323 265 223 660 3,530 658 1,395 318 269 222 663 3,525 14.2.By departments Departmants Number of employees 2Q14 1Q14 Administrative Operational Total 1,031 2,493 3,524 3Q14 1,031 2,499 3,530 1,027 2,498 3,525 14.3.By region State Number of employees 2Q14 1Q14 Distrito Federal Espírito Santo Goiás Minas Gerais Mato Grosso Paraná Rio de Janeiro Rondônia São Paulo Tocantins Total 165 56 251 550 14 158 1,876 05 442 07 3,524 3Q14 166 56 253 551 14 158 1,877 04 444 07 3,530 167 57 254 550 14 158 1,875 03 440 07 3,525 15.Complementary work force Operational 1Q14 2Q14 3Q14 1,336 1,335 1,332 16.Turn-over - % 1Q14 2Q14 3Q14 0.27 0.31 0.32 66 Marketletter Balance Sheet (R$ thousand) Financial Statements for Consolidation Purposes Assets Current Assets Availabilities Clients (Consumers and resellers) Loans and financing - principal Marketable Securities Dividends to receive (Remuneration of equity participation) Fiscal Assets deferred (Taxes and contributions) Income Tax and Social Contribution Linked deposits Stored materials Financial Asset Receivables - 12,783/13 Law Others Current Assets Total 7 Non-Current Assets Clients (Consumers and resellers) Loans and financing - principal Marketable Securities Fiscal Assets deferred (Taxes and contributions) Income Tax and Social Contribution Reimbursement Rights - CCC (12,111 Law) Linked deposits Financial Asset – Annual allowed revenue (transmission) Receivables - 12,783/13 Law Others Advances for equity participation INVESTMENTS FIXED ASSETS INTANGIBLE Non-Current Assets Total Assets Total 09.30.14 09.30.13 913,967 317,846 3,375 1,067,225 9,611 48,130 56,779 10,982 97,912 78,136 1,343,642 370,948 4,318,553 481,417 312,351 3,426 2,693,691 9,305 88,146 10,982 88,672 77,431 1,254,584 268,025 5,288,030 9,761 4,817 3,675 162,173 2,039,412 606,044 3,182,648 164,585 156,184 572,507 6,901,806 3,807,953 1,630,738 34,849 12,375,346 16,693,899 16,287 8,172 3,558 1,986,025 645,225 3,517,421 1,280,976 26,184 250,906 7,734,754 2,919,523 1,510,436 27,614 12,192,327 17,480,357 67 Marketletter Liabilities and Stockholders’ Equity 09.30.14 09.30.13 Current Liabilities Suppliers Loans and financing Taxes and social contribution Income Tax and Social Contribution Derivatives Advances from consumers Shareholders remuneration (dividends payable) Estimated obligations Provisions for contingencies Post-employment benefit (complementary Pension Fund) Onerous Contracts Sector charges (regulatory taxes) Incentive to personnel retirement Others Current Liabilities Total 464,989 249,924 85,952 13 216,397 59,959 141,752 19,747 1,238,733 327,723 59,992 88,468 34 210,970 202,917 505,099 23,492 1,418,695 Non-Current Liabilities Suppliers Loans and financing Taxes and social contribution Income Tax and Social Contribution Derivatives Advances from consumers Estimated obligations Provisions for contingencies Provision for uncovered liabilities on invested companies Provision for onerous contract Post-employment benefit (Complementary Pension Fund) Leasing Concessions to pay - UBP Sectorial charges (regulatory taxes) Obligations for asset demobilization Advance for future Capital Increase Others Non-Current Liabilities Total 971,668 13,572 100,478 1,433,346 827,490 528,693 254,023 5,760 4,135,030 306,365 76,587 1,444,965 1,896,095 743,607 185,765 5,605 4,658,989 Stockholders’ Equity Social Capital Capital reserves Profit reserves Additional dividends proposed Accrued profit/losses Other comprehensive income Non-controlling participation 9,753,953 4,916,199 -2,643,487 -706,529 - 9,753,953 4,916,199 -2,461,733 -805,746 - Stockholders’ Equity Total 11,320,136 11,402,673 Liabilities and Stockholders’ Equity Total 16,693,899 17,480,357 68 Marketletter Statement of Income by activity (R$ thousand) 09.30.14 09.30.13 Operating Revenue Generation Plant Supply Energy Supply Short term electric Energy O&M Revenue of Renewed Plants Construction Revenue Return on Investment - G 94,845 661,210 73,096 915,769 50,640 - 621,283 664,829 1,240,567 46,314 - Transmission O&M Revenue Renewed Lines O&M Revenue Construction Revenue – Transmission Return on Investment - T Other Operating Revenue 527,631 28,057 634,596 36,845 9,622 463,721 16,367 569,511 33,979 13,748 -477,494 2,554,817 -517,180 3,153,139 -428,287 -553,964 -279,372 -685,236 -450,318 -609,314 -721,407 -615,825 -824,929 -9,426 -77,906 -13,744 -126,040 -23,843 -3,022,747 -961,338 -16,534 -78,506 -15,185 -362,358 -55,861 -3,886,646 Result of equity participation Operating Result before Financial Result -31,131 -499,061 55,942 -677,565 Financial Result Result before Income Tax / Social Contribution 362,992 -136,069 293,122 -384,443 151,462 15,393 20,888 94,636 -268,919 Deductions to Operating Revenue Net Operating Revenue Operating Costs and Expenses Electric Energy purchased for resale Charges on the use of electric grid Fuel for production of electric Energy - CCC Construction costs Operating Expenses Personnel, Material and Third party services Remuneration and reimbursement Depreciation and amortization Donations and Contributions Provisions Others Operating Cost and Expenses Current Income Tax and and social contribution Deferred Income Tax and and social contribution Net income for the period 69 Marketletter Cash Flow (R$ thousand) Cash Flow OPERATING ACTIVITIES Profit/Loss before income tax and social contribution Depreciation and amortization Net monetary and currency variations Financial charges Equity Equivalency Result Provision for uncovered liability Provision for credits of questionable liquidation Provision for contingencies Provision for staff realignment Impairment Global reversal reserve charges Adjustment to present value / market value Minority Participation in the Results Charges on shareholders funds Financing assets Revenue - IRR Derivative financial instruments Others Variation in operating assets / liabilities Cash generated in operating activities 09.30.2014 09.30.2013 -136,069 77,906 -190,225 96,839 31,131 27,854 101,229 -17,567 -154,516 -36,845 149,685 -239,909 -290,487 -384,443 78,506 -276,310 20,587 -55,942 26,024 79,771 505,099 -421,678 -33,979 222,485 194,899 -44,981 Financial charges paid Payment of global reversal reserve charges Financial charges received Remuneration received from equity participation Financial asset revenue by RAP Receiving compensation for financial asset Payment of income tax and social contribution Payment of pension fund Lawsuits payment Legal deposits Net cash operating activities -75,962 81,852 -580,339 895,342 -18,440 -72,755 14,633 -46,156 -16,864 22,673 -569,149 4,707,379 -23,491 -36,654 4,038,913 FINANCING ACTIVITIES Loans and financing obtained Loans and financing payable – principal Payment of Shareholders remuneration Payment on refinancing of taxes and contributions - Principal Receipt of Advance for future Capital Increase Others Net cash financing activities 400,000 -43,659 356,341 -102,476 -102,476 -147,126 -7,346 -713,467 630,610 -237,329 -234,085 -3,533 -638,357 -2,673,790 -3,549,765 72,856 386,672 841,111 913,967 72,856 94,745 481,417 386,672 INVESTMENT ACTIVITIES Acquisition of fixed asset Acquisition of intangible asset Acquisition of Concession asset Advance for future capital increase Acquisition of equity participation Others Net cash investment activities Increase (decrease) in cash and cash equivalent Cash and cash equivalent – beginning of period – 12/31/13 Cash and cash equivalent – end of period – 03/31/14 70 Marketletter Analysis of the results 3Q14 X 2Q14 The Company had a net profit in the 3Q14 587.4% lower than reported in the previous quarter, from a profit of R$ 47.4 million in the 2Q14 to a loss of R$ 230.8 million in the 3Q14, mainly due to the following factors described. Operating Revenue In generation: The supply of electricity for final clients increased by 9.8%, from R$ 218.2 million in the 2Q14 to R$ 239.7 million in the 3Q14 , due primarily to higher volume of energy sold with the establishment of new contracts. The short-term electricity decreased by 18%, from R$ (5.6) million in the 2Q14 for R$ (6.7) million in the 3Q14, mainly due to the reduction in power generation of the Power Plant Northeastern Complex. Transmission: Revenues from operation and maintenance of renewed lines showed an increase of 23.6%, from R$ 162.7 million in the 2Q14 to R$ 201.1 million in the 3Q14 , mainly due to the update of the recipe and entry of new projects previously authorized. Revenues from financial assets showed an increase of 403.1%, from R$ 4.9 million in the 2Q14 to R$ 24.5 million in the 3Q14 , mainly due to entry of new ventures. Operating Expenses Electricity purchased for resale increased by 131.1%, from R$ (105.8) million in the 2Q14 for R$ (244.6) million, in the 3Q14 , mainly due to reduction in the generation of hydroelectric power plants due to the strong drought that affects the region. The fuel for electricity production decreased by 27.3% from R$ (108.0) million in the 2Q14 for R$ (78.6) million in the 3Q14 , mainly due to reduced operation of the Camaçari plant. Operational provisions had increased 350.7%, from a reversal R$ 84.8 million in the 2Q14 to a provision of R $ 212.6 million in the 3Q14 , primarily due to the recording of a provision for losses on investments, R$ 44 million, and updating of the studies conducted by the Company to record an impairment, R$ 368 million. Financial Results Revenues from financial investments decreased by 45.2%, from R$ 91.9 million in the 2Q14 to R$ 50.3 million in the 3Q14, mainly due to income from investments in the extra market fund. The arrears revenues decreased by 60%, from R$ 13.4 million in the 2Q14 to R$ 5.4 million in the 3Q14, mainly due to the reduction in arrears of electricity sold. The remuneration of the Indemnifies Law 12,783/13 decreased by 49%, from R$ 69.8 million in the 2Q14 to R$ 35.6 million in the 3Q14, mainly due to reduction of receivables. Shareholding Participations The result from equity investments presented gain of 122.6%, from a loss of R$ (37.0) million in the 2Q14 to a gain of R$ 8.4 million in the 3Q14, due primarily to an increase in income of equity accounting of CHESF on their investments in SPEs. 71 Marketletter Market Data 1.Generation Assets and Energy generated 1.1.Own assets Unit Funil Pedra Araras Curemas Paulo Afonso Complex, Piloto and Apolônio Sales (Moxotó) Sobradinho Luiz Gonzaga (Itaparica) Boa Esperança (Castelo Branco) Xingó Camaçari* Installed Capacity (MW) Guaranteed energy (MW Average) Energy generated (MWh) 1Q14 2Q14 3Q14 30.00 20.00 4.00 3.52 10.91 3.74 1.00 11,239,38 1,433,04 83,30 9,119,54 2,450,95 - 9,052,60 2,102,05 - 4,281.60 2.225.00 2,453,958,72 2,414,740,91 2,399,169,40 1,050.30 1,479.60 237.30 3,162.00 346.80 531.00 959.00 143.00 2.139.00 229.80 582,647,89 1,062,845,43 333,799,22 2,710,531,52 126,992,22 599,487,26 1,040,267,05 275,788,21 2,713,788,43 143,031,99 550,797,90 1,038,596,58 291,247,74 2,737,994,07 95,358,77 (*) The UTE Camaçari installed capacityis 346.8 MW when operates with Natural Gas, that is more efficient. When diesel oil is usedits installed capacity is around 333.8 MW. Guaranteed Energy of Funilchanged since 01/01/2014, according to ANEEL Ordinance 1,577, from 07/30/2013. Unit Funil Pedra Araras Piloto Curemas Complexo de Paulo Afonso Sobradinho Luiz Gonzaga (Itaparica) Boa Esperança (Castelo Branco) Xingó Camaçari Location (State) Beginning of Operation End of Concession BA BA CE BA PB BA BA PE PI SE BA Mar/62 Apr/78 Feb/67 Jan/55 Jun/57 Jan/55 Apr/79 Feb/88 Jan/70 Apr/94 Feb/79 Dec/2042 Dec/2042 Jul/2015 Jul/2015 Nov/2024 Dec/2042 Feb/2022 Dec/2042 Dec/2042 Dec/2042 Aug/2027 1.2.SPEs SPE Energetica Águas da Pedra S.A. ESBR Participações S.A. Pedra Branca S.A. São Pedro do Lago S.A. Sete Gameleiras S.A. Unit Dardanelos Jirau (*) Pedra Branca São Pedro do Lago Sete Gameleiras Unit UHE Dardanelos UHE Jirau Pedra Branca São Pedro do Lago Sete Gameleiras Installed Capacity (MW) Guaranteed energy (MW Average) 261,00 3,750,00 30,00 30,00 30,00 159,60 2,184,60 12,20 13,50 12,60 Energy generated (MWh) 1Q14 2Q14 3Q14 544,046,35 289,282,53 26,500,75 22,615,16 25,566,99 465,653,50 730,294,27 30,733,00 23,734,50 29,291,16 98,142,47 1,047,941,35 38,559,89 37,050,43 38,426,09 Participation (%) Local (State) Beginning of Operation End of Operation 24.5 20.0 49.0 49.0 49.0 MT RO BA BA BA Aug/11 Sep/13 Jan/13 Jan/13 Jan/13 Jul/42 Aug/43 Feb/46 Feb/46 Feb/46 (*) The first turbine become into Operation on Sep/13 with 75 MW of installed capacity. In the 3Q14 the company totallized 13 machines into Operation, compounding an installed capacity under Operation of 975 MW. 72 Marketletter 2.Electric energy purchased for resale 2.1. Own assets Supplier Eletrobras Sistem Others Unit 1Q14 2Q14 3Q14 MWh R$ million MWh R$ million 108,050 17,3 393,719 54,1 109,200 17,5 404,089 53,9 110,400 17,7 596,173 178,9 1Q14 2Q14 3Q14 - 7,830 4,84 29,645 17,72 2.2.SPE Energética Águas da Pedra S.A. Supplier Unit MWh R$ million MWh R$ million Eletrobras System Others Due to the enlargement of the drought, the generation of power from the plant was affected need to resort to short-term energy market (CCEE) to ensure delivery of contracted energy. 3.Energy sold 3.1.Own assets 3.1.1. Energy sold by enterprises not affected by 12,783 law Buyer Eletrobras System Others Total Sale model 1Q14 R$ million A B A B A B 219,9 219,9 MWh 2,392,313 2,392,313 2Q14 R$ million 235,7 235,7 MWh 1,982,553 1,982,553 3Q14 R$ million 255,8 255,8 MWh 2,088,408 2,088,408 A - Through auction B - Through free market agreements or bilateral contracts 3.1.2. Energy sold by enterprises affected by 12,783 law Buyer Eletrobras System Others Total Sale model 1Q14 R$ million A B A B A B 24,8 295,9 320,7 - MWh 938,919 10,688,510 11,627,429 - 2Q14 R$ million 26,2 296,7 322,9 - MWh 948,912 10,756,402 11,705,314 - 3Q14 R$ million 26,6 290,3 316,9 - MWh 959,340 10,874,604 11,833,944 - A - Through auction B - Through free market agreements or bilateral contracts 73 Marketletter 3.2.SPE Energética Águas da Pedra S.A. Buyer Eletrobras System Others Total Sale model A B A B A B 1Q14 R$ million 52,7 52,7 MWh 2Q14 R$ million MWh 327,333 327,333 50,2 50,2 3Q14 R$ million 306,799 306,799 52,9 52,9 MWh 315,136 315,136 ESBR Participações S.A. Buyer Eletrobras System Others Total Sale model A B A B A B CCEE 1Q14 R$ million 3,2 1,6 28,2 2,4 31,4 4,0 91,4 MWh 32,900 9,500 299,400 14,200 332,300 23,700 -66,800 2Q14 R$ million MWh 8,3 3,7 76,5 5,6 84,8 9,3 108,1 88,100 21,900 799,600 32,900 887,700 54,800 -212,200 3Q14 R$ million 12,7 16,7 112,0 24,3 124,7 41,0 12,9 MWh 131,300 98,300 1,141,200 143,900 1,272,500 242,200 -466,700 Pedra Branca S.A. Buyer Eletrobras System Others Total Sale model A B A B A B 1Q14 R$ million 2,4 1,9 4,3 - MWh 15,078 11,639 26,717 - 2Q14 R$ million MWh 2,4 1,9 4,3 - 15,078 11,639 26,717 - 3Q14 R$ million 2,4 1,9 4,3 - MWh 15,078 11,639 26,717 - São Pedro do Lago S.A. Buyer Eletrobras System Others Total Sale model A B A B A B 1Q14 R$ million 2,6 2,0 4,6 - MWh 16,314 12,593 28,907 - 2Q14 R$ million MWh 2,6 2,0 4,6 - 16,314 12,593 28,907 - 3Q14 R$ million 2,6 2,0 4,6 - MWh 16,314 12,593 28,907 - Sete Gameleiras S.A. Buyer Eletrobras System Others Total Sale model A B A B A B 1Q14 R$ million 2,5 1,9 4,4 - MWh 15,448 11,926 27,374 - 2Q14 R$ million MWh 2,5 1,9 4,4 - 15,448 11,926 27,374 - 3Q14 R$ million 2,5 1,9 4,4 - MWh 15,448 11,926 27,374 - 74 Marketletter 4.Settlement CCEE (Spot e MRE) Unit 1Q14 R$ million MWh MWaverage R$ million MWh MWaverage R$ million MWh MWaverage Sale Purchase Net 2Q14 85,39 29,256,43 13,54 6,49 31,173,14 14,43 78,90 -1,916,70 0,89 -5,63 7,957,25 3,64 34,44 44,783,40 20,51 -40,07 36,826,15 16,86 3Q14 -6,67 * * 48,08 110,667,32 50,12 -54,75 -110,667,32 -50,12 * In the 3Q14 there was no sale in CCEE liquidation. The negative move is due to adjustment from prevoious period. 5.Fuel used to produce electricity Type Unit Diesel Oil Gas Litre m3 1Q14 Amount R$ Million 25.494.000 18.416.991 Total: Amount 58,1 34,7 92,8 2Q14 R$ Million 36.386.000 14.903.007 79,2 28,8 108,0 3Q14 R$ Million Amount 29.708.000 1.238.529 76,2 2,3 78,6 *Since 3Q14, the UTE Camaçari operates with only 1 machine. The others 4 machines were suspended of operation by ANEEL, because it does not have operations conditions 6.Losses in generation - % 1Q13 2Q13 3Q13 2.76 2.63 2.40 7.Average price – R$/MWh 7.1.Own assets – enterprises not affected by 12,783 law 1Q14 2Q14 3Q14 91.92 118.88 122.49 7.1.1. Own Assets – enterprises renewed in terms of 12,783 law - O&M 1Q14 2Q14 3Q14 27.58 27.58 26.78 7.2.SPE Energética Águas da Pedra S.A. ESBR Participações S.A. Pedra Branca S.A. São Pedro do Lago S.A. Sete Gameleiras S.A. 1Q14 2Q14 3Q14 160.99 99.31 160.86 160.86 160.86 163.68 99.87 160.86 160.86 160.86 168.10 109.38 160.86 160.86 160.86 75 Marketletter 8.Extension of transmission lines - Km 8.1.Own assets 8.1.1.Transmission lines 8.1.1.1. Transmission lines – enterprises not affected by 12,783 law From-To Ibicoara-Brumado, C1 Milagres-Coremas, C2 Milagres-Tauá, C1 Paulo Afonso III- Zebu II, C1 Paulo Afonso III- Zebu II, C2 Paraiso-Açu II, C2 Picos-Tauá II, C1 Pirapama II-Suape II, C1 Pirapama II-Suape II, C2 Suape III-Suape II, C1 Suape III-Suape II, C2 C. Mirim II-João Câmara II C1 Extremoz II-C. Mirim II C1 Jardim/Penedo, C1 B. Jesus da Lapa II – Igaporã II Sub-Total - 230 Kv Total Extension (km) Tension (kV) Beginning of Operation End of Concession 94.5 119.8 208.1 5.4 5.4 132.8 183.2 20.9 20.9 3.6 3.6 31.4 74.5 110.0 115.0 1,129.1 1,129.1 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 Mar/12 Jun/09 Dec/07 Aug/12 Aug/12 Sep/10 Feb/13 Dec/12 Dec/12 Dec/12 Dec/12 Feb/14 Feb/14 Mar/14 May/14 Jun/37 Feb/35 Feb/35 Aug/39 Aug/39 Jun/37 Jun/37 Jun/37 Jun/37 Jan/39 Jan/39 Nov/40 Nov/40 Mar/38 Nov/40 8.1.1.2. Transmission lines – enterprises renewed in terms of 12,783 law – O&M From-To Angelim II-Recife II, C1 Angelim II-Recife II, C2 Jardim-Camaçari IV, C1 Camaçari II-Camaçari IV, C1 L. Gonzaga-Angelim II, C1 L. Gonzaga-Milagres, C1 L. Gonzaga-Olindina, C1 Luiz Gonzaga-Sobradinho, C1 Messias-Suape II, C1 Suape II-Recife II, C1 Milagres-Quixada, C1 Olindina-Camacari II, C1 Olindina-Camacari II, C2 P.Afonso IV-Angelim II, C2 P.Afonso IV-Olindina, C2 P.Afonso IV-L. Gonzaga, C1 P.Afonso IV-Xingo, C1 Pres.Dutra II-Teresina II, C1 Pres.Dutra II-Teresina II, C2 Quixada-FortalezaII, C1 Sobral III-Pecem II, C1 Pecem II-Fortaleza II, C1 S.J.Piaui-B.Esperanca, C1 Sobradinho-S.J.Piaui, C1 Sobradinho-Luiz Gonzaga, C2 Teresina II-Sobral III, C1 U. Luiz Gonzaga-L.Gonzaga, C1 U. Luiz Gonzaga-L.Gonzaga, C2 U. Luiz Gonzaga-L.Gonzaga, C3 Usina IV-P.Afonso IV, C1 Usina IV-P.Afonso IV, C2 Usina IV-P.Afonso IV, C3 Usina IV-P.Afonso IV, C4 Usina IV-P.Afonso IV, C5 Usina IV-P.Afonso IV, C6 Extension (km) Tension (kV) Beginning of Operation End of Concession 169.1 170.7 249.6 0.3 248.4 230.8 248.6 290.6 176.6 45.4 268.0 147.2 146.9 221.5 212.8 37.4 53.8 207.9 207.7 136.5 176.6 73.1 233.5 211.0 316.0 334.2 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 Aug/77 Mar/80 May/00 Nov/12 Feb/77 Feb/02 May/76 Oct/79 Dec/98 Dec/98 Sep/03 Oct/76 Sep/78 Jul/79 Jun/78 Oct/79 Feb/93 May/00 Apr/03 Sep/03 May/00 May/00 Dec/80 Oct/80 Jun/88 May/00 May/79 May/79 May/79 Dec/79 May/80 Oct/80 Jul/81 Dec/81 May/83 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 76 Marketletter From-To Usina Xingo – Xingo, C1 Usina Xingo – Xingo, C2 Usina Xingo – Xingo, C3 Usina.Xingo.- Xingo, C4 Usina Xingo – Xingo, C5 Usina Xingo – Xingo, C6 Xingo-Jardim, C1 Xingo-Messias, C1 Sub-Total - 500 Kv Angelim-Messias, C1 Angelim-Messias, C2 Angelim-Messias, C3 Angelim-Ribeirão, C1 Angelim-Recife II, C2 Angelim-Recife II, C3 Angelim-Tacaimbó, C1 Angelim-Tacaimbó, C2 Angelim-Tacaimbó, C3 Arapiraca III–Rio Largo II, C1 Arapiraca III–Penedo, C1 Boa Esperança-Teresina, C1 Boa Esperança-Teresina, C2 Bongi-Açonorte, C1 B.Jesus da Lapa-Barreiras, C1 Banabuiu-Fortaleza, C1 Banabuiu-Fortaleza, C2 Aquiraz II-Banabuiu, C1 Aquiraz II-Fortaleza, C1 Banabuiu-Mossoro II, C1 Banabuiu-Russas II, C1 Bom Nome-Milagres, C1 Bom Nome-Milagres, C2 Bom Nome-Milagres, C3 Cauipe-Sobral, C1 Cicero Dantas-Catu, C1 Cicero Dantas-Catu, C2 Campina Grande-Coteminas, C1 Campina Grande-Goianinha, C1 C. Grande II – Extremoz II C1 Campina Grande II-Natal III, C2 Natal III-Natal II, C1 Natal III-Natal II, C2 Campina Grande II-Paraiso, C1 Campina Grande II-Paraiso, C2 Camaçari-Caraíba Metais, C1 Camaçari-Cqr, C1 Camaçari-Cotegipe, C1 Camaçari-Cotegipe, C2 Camaçari-Gov.Mangabeira, C1 Camaçari-Gov.Mangabeira, C2 Camaçari-Jacaracanga, C1 Camaçari-Jacaracanga, C2 Camaçari-Matatu, C1 Camaçari-Pituaçu, C1 Camaçari-Pituaçu, C2 Cotegipe-Jacaracanga, C1 Cotegipe-Matatu, C1 Catu-Camaçari, C1 Catu-Camaçari, C2 Catu-Gov.Mangabeira, C1 Catu-Itabaianinha, C1 Funil-Itapebi, C1 Funil-Itapebi, C2 Fortaleza-Cauipe, C1 Fortaleza II-Delmiro Gouveia, C1 Fortaleza II-Delmiro Gouveia, C2 Fortaleza-Fortaleza II, C1 Fortaleza-Fortaleza II, C2 Fortaleza-Fortaleza II, C3 Extension (km) 0.9 0.9 0.9 0.9 0.8 0.8 159.8 219.0 5,203.6 78.9 78.5 79.1 115.7 171.7 171.7 63.9 64.1 65.7 124.7 89.6 198.0 198.0 6.0 233.5 177.2 176.0 181.8 30.1 177.2 110.4 83.7 84.1 83.9 177.4 200.7 201.3 2.5 99.3 192.8 176.5 11.6 11.6 118.1 119.0 3.2 7.2 22.9 23.5 83.7 83.7 19.2 19.2 47.0 39.2 39.2 15.2 30.0 25.0 25.0 77.2 143.9 198.1 198.1 58.2 7.1 7.1 0.3 0.3 0.3 Tension (kV) Beginning of Operation End of Concession 500 500 500 500 500 500 500 500 Oct/95 Oct/95 Oct/95 Oct/95 Mar/94 Nov/94 May/00 Feb/93 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 Apr/77 Oct/76 Aug/86 Jan/53 Jan/67 Jan/61 Mar/63 Mar/73 Jun/98 Jan/98 Jan/98 Mar/70 Dec/81 Aug/76 Dec/90 Oct/65 Jul/78 Aug/78 Aug/78 Jul/03 May/71 Sep/61 Dec/74 Sep/79 Nov/73 Mar/68 Apr/72 Oct/99 Feb/70 Oct/99 Oct/02 Oct/99 Oct/02 May/79 Apr/79 Feb/82 May/92 Jun/70 Oct/76 Sep/82 Sep/82 Jul/77 Mar/77 Aug/53 Oct/84 Jan/02 Dec/71 May/77 Jun/70 Aug/53 Aug/67 Aug/53 Jul/90 Jul/90 Nov/73 Jun/89 Jun/89 Feb/00 Feb/00 Oct/05 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 77 Marketletter From-To Fortaleza II-Cauipe, C1 Fortaleza II-Cauipe, C2 Fortaleza II-Pici, C1 Fortaleza II-Pici, C2 Goianinha-Santa Rita II, C1 Santa Rita II-Mussuré II, C1 Goianinha-Mussure, C2 Gov.Mangabeira-Sapeaçu, C1 Gov.Mangabeira-Sapeaçu, C2 Gov.Mangabeira-Sapeaçu, C3 Icó-Banabuiú, C1 Itapebi-Eunápolis, C1 Itapebi-Eunápolis, C2 Irecê-Brotas de Macaúba, C1 Brotas de Macaúba-B.J Lapa, C1 Itabaianinha-Itabaiana, C1 Itabaiana-Jardim, C1 Itabaiana-Jardim, C2 Jacaracanga-Alunordeste, C1 Jacaracanga-Dow, C1 Jacaracanga-Dow, C2 Jardim-Fafen, C1 Jardim-Cia.Vale.Rio Doce, C1 Jaguarari-Sr. do Bonfim II, C1 Juazeiro II-Jaguarari, C1 Juazeiro II-Sr.do Bonfim II, C2 Libra-Libra, C1 Milagres-Banabuiu, C1 Milagres-Ico, C1 Milagres-Banabuiu, C3 Milagres-Coremas, C1 Mirueira-Pau Ferro, C1 Mirueira-Goianinha, C1 Messias-Maceió, C1 Messias-Maceió, C2 Messias-Rio Largo, C1 Messias-Rio Largo, C2 Messias-Rio Largo, C3 Mossoró-Açu, C1 Natal III - Extremoz II, C1 Olindina-Olindina, C1 Olindina-Olindina, C2 Paulo Afonso-Angelim, C1 Paulo Afonso-Angelim, C2 Paulo Afonso-Angelim, C3 Paulo Afonso-Angelim, C4 Paulo Afonso-Bom Nome, C1 Paulo Afonso-Bom Nome, C2 Paulo Afonso-Bom Nome, C3 Paulo Afonso-C. Dantas, C1 Paulo Afonso-C. Dantas, C2 Paulo Afonso-Itabaiana, C2 Paulo Afonso-Itabaiana, C3 Paulo Afonso IV-P.Afonso, C1 Paulo Afonso IV-P.Afonso, C2 Pau Ferro-Coteminas, C1 Pau Ferro-Campina Grande, C2 Paraiso-Natal II, C1 Paraiso-Natal II, C2 Piripiri-Sobral, C1 Pituaçu-Narandiba, C1 Pituaçu-Narandiba, C2 Pituaçu-Pituaçu, C1 Recife II-Joairam, C1 Recife II-Joairam, C2 Recife II-Joairam, C3 Joairam-Bongi, C1 Joairam-Bongi, C2 Joairam-Bongi, C3 Extension (km) Tension (kV) Beginning of Operation End of Concession 58.0 58.0 27.5 27.5 59.0 17.0 50.6 23.5 22.5 22.6 124.7 47.0 47.0 135.4 204.6 76.8 44.0 44.0 1.8 7.9 7.8 12.5 0.8 80.7 88.0 148.6 1.5 225.9 103.4 225.1 119.4 23.1 50.1 25.9 25.9 11.9 11.6 11.6 71.3 17.0 0.2 0.2 221.3 220.2 220.2 221.0 170.1 170.7 170.8 134.2 133.8 162.5 162.5 1.1 1.4 123.9 125.9 96.2 97.2 167.4 3.6 3.6 2.0 7.4 7.4 7.4 6.3 6.4 6.4 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 Nov/03 Nov/03 May/09 May/09 Oct/77 Oct/77 Oct/77 Dec/68 Feb/84 Feb/84 Dec/77 Jul/90 Jul/90 Sep/81 Sep/81 Aug/53 Aug/79 Aug/79 May/83 Jul/77 Mar/77 Aug/81 Feb/07 Jan/80 Jan/80 Apr/81 Dec/91 Feb/65 Dec/77 Dec/77 Nov/86 Oct/99 Dec/89 Nov/96 Nov/96 Aug/86 Oct/76 Apr/77 Jul/87 Feb/14 May/80 May/80 Jan/53 Jan/67 Jan/61 Dec/73 Oct/61 Dec/74 Nov/78 Mar/68 Jun/72 Apr/87 Sep/85 Oct/79 Feb/81 Oct/99 Oct/99 May/79 Apr/79 Aug/73 Nov/83 Nov/83 Jan/77 Jan/67 Jan/67 Jan/61 Jan/53 Jan/67 Jan/61 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 78 Marketletter From-To Recife II-Goianinha, C1 Recife II-Goianinha, C2 Recife II-Mirueira, C1 Recife II-Mirueira, C2 Recife II-Mirueira, C3 Recife II-Pau Ferro, C1 Recife II-Pau Ferro, C2 Recife II-Pirapama II, C1 Recife II-Pirapama II, C2 Ribeirão-Recife II, C1 Rio Largo-Braskem, C1 Russas II-Mossoró II, C1 Sobral III-Sobral II, C1 Sobral III-Sobral II, C2 Sobral II – Cccp, 230 Kv, C1 S. Mendes-Picos, C1 S.João Piaui-Eliseu Martins, C1 S.João Piaui-S. Mendes, C1 Sr.do Bonfinal-Irece, C1 Sapeaçu-Funil, C1 Sapeaçu- S.Ant.Jesus, C2 Sapeaçu- S.Ant.Jesus, C3 S.Ant.Jesus-Funil, C2 S.Ant.Jesus-Funil, C3 Tacaimbo-C.Grande II, C1 Tacaimbo-C.Grande II, C2 Teresina I-Teresina II, C1 Teresina I-Teresina II, C2 Teresina-Piripiri, C1 Usina Apol.Sales- P.Afonso, C1 Usina Apol.Sales- P.Afonso, C2 Us. B.Esperança-B.Esperança, C1 Sobradinho-Juazeiro II, C1 Sobradinho-Juazeiro II, C2 Usina II-Paulo Afonso, C1 Usina II-Paulo Afonso, C3 Usina II-Paulo Afonso, C4 Usina II-Paulo Afonso, C5 Usina III-Paulo Afonso, C1 Usina III-Paulo Afonso, C2 Usina III-Paulo Afonso, C3 Usina III-Paulo Afonso, C4 Usina I-Paulo Afonso, C1 Usina I-Paulo Afonso, C2 Sub-Total - 230 Kv C.Grande II-S.Cruz II, C1 C.Grande II-Pilões, C1 Paraíso-Santa Cruz II, C1 Pilões – Paraíso, C1 C. Novos-Santana do Matos, C1 Santana do Matos-Açu, C1 Santa Cruz II-C.Novos II, C1 Usina II-Zebu, C1 Sub-Total - 138 Kv Abaixadora-Mulungu, C1 Abaixadora-Moxoto, C1 Abaixadora-Zebu, C1 Camacari-Camacari, C2 Cotegipe-Catu, C1 Cotegipe-Catu, C2 Jaboatao-Recife II, C1 M.Reduzido-M.Reduzido, C1 Matatu-Pituacu, C1 Matatu-Pituacu, C2 Pirapama II-Recife II, C1 Pituacu-Cotegipe, C1 Pituacu-Cotegipe, C2 Usina de Pedra-Jequié, C1 Vila Zebu-Itaparica, C1 Extension (km) 71.4 71.5 31.0 31.5 31.5 33.2 33.2 27.6 27.6 56.6 23.2 75.0 13.8 13.8 2.9 99.6 172.9 68.2 214.0 195.7 32.0 32.0 162.1 162.6 124.7 124.7 25.3 25.3 154.7 5.8 5.7 2.8 42.5 42.5 0.7 0.7 0.7 0.7 0.6 0.6 0.6 0.6 0.6 0.6 12,584.2 117.3 79.3 8.7 107.9 38.8 49.6 55.0 6.0 462.6 6.5 5.3 5.4 1.4 48.7 48.7 3.1 0.5 7.5 7.4 21.3 22.1 21.9 20.5 27.0 Tension (kV) Beginning of Operation End of Concession 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 Feb/72 Feb/72 Jun/80 Jun/80 Jun/86 Sep/04 Sep/04 Jun/80 Jun/80 Sep/94 Jun/76 Apr/81 May/09 May/09 Jun/01 Mar/86 Feb/98 Jul/85 Sep/81 Dec/68 Feb/84 Feb/84 Feb/84 Feb/84 Jun/85 Jun/85 Sep/02 Sep/02 Nov/71 Oct/77 Mar/77 Dec/80 Jan/80 Apr/81 Oct/61 May/67 May/67 Dec/67 Oct/71 Apr/72 Apr/74 Aug/74 Jan/55 Jan/55 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 138 138 138 138 138 138 138 138 Apr/63 Jan/68 Jan/68 Jan/68 Dec/67 Dec/67 Oct/65 Dec/64 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 May/75 Oct/70 Oct/72 Jun/60 Jun/60 Jun/60 Jan/65 Apr/73 Jun/60 Jun/60 Jan/65 Jun/60 Jun/60 Nov/78 Jul/77 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 79 Marketletter From-To Zebu-Moxoto, C1 Zebu-Xingo, C1 Sub-total 69 kV Total Extension (km) 7.2 56.5 311.0 18,561.4 Tension (kV) Beginning of Operation End of Concession 69 69 Apr/83 Aug/81 Dec/42 Dec/42 8.1.2.Substations 8.1.2.1. Substations – enterprises not affected by 12,783 law Substation SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE Elev. Usina de Curemas Elev. Usina Term. Camaçari Tauá II Ibicoara Pilões II Santa Rita II Suape III Coteminas Natal III Zebu II Brotas de Macaubas Brumado Camaçari IV Sapeaçu Suape II Arapiraca III Extremoz II João Câmara Acaraú Igaporã Transformation capacity (MVA) Location Beginning of Operation End of Operation 5 400 102 410 300 200 300 200 2,400 600 100 150 360 200 300 PB BA CE BA PB PB PE PB RN AL BA BA BA BA PE AL RN RN CE BA Jan/68 Sep/78 Dec/07 Jan/11 Oct/12 Jul/12 Jul/12 Dec/09 Aug/12 Jul/12 Jul/12 Aug/10 Nov/12 May/03 Dec/12 Jun/13 Feb/14 Feb/14 Apr/14 Jun/14 Nov/24 Aug/27 Mar/35 Jun/37 Dec/42 Aug/39 Jan/39 Dec/42 Aug/39 Aug/39 Dec/42 Jul/40 Jul/40 Jul/40 Jan/39 Oct/40 Nov/40 Nov/40 Nov/40 Nov/40 8.1.2.2. Substations – enterprises renewed in terms of 12,783 law – O&M Substation SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE Elev. Usina Apolonio Sales Elev. Usina Luiz Gonzaga Elev. Usina Paulo Afonso I Elev. Usina Paulo Afonso II Elev. Usina Paulo Afonso III Elev. Usina Paulo Afonso IV Elev. Usina Piloto Elev. Usina Xingó Elev. Usina de Araras Elev. Usina B. Esperança Elev. Usina de Sobradinho Elev. Usina de Funil Elev. Usina de Pedra Pau Ferro Paraiso Bom Nome Irecê Milagres Mirueira Moxotó Mulungú Sobradinho Sobral II Tacaimbó Cícero Dantas Açu II Angelim Angelim II Bongi Transformation Capacity (MVA) Location (State) Beginning of Operation End of Operation 480 1,665 202.5 495 960 2,700 3 3330 5 280 1200 43,2 27 301 100 388 229 920 401 20 10 600 400 301 101 378 310 0 490 AL PE BA BA BA BA BA SE CE PI BA BA BA PE RN PE BA CE PE BA BA BA CE PE BA RN PE PE PE Feb/77 May/88 Jan/55 Jan/62 Jan/71 Nov/79 Jan/53 Nov/94 Feb/60 Mar/70 Oct/79 Jan/59 Nov/78 Aug/02 Feb/04 Oct/63 Sep/81 Jan/64 Aug/78 Jan/72 May/75 Oct/79 Nov/73 Jun/85 May/56 Nov/89 Jan/56 Jan/80 May/56 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 80 Marketletter Substation SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE Campina Grande II Jaguarari Itapebi Funil SEnhor Do Bonfim II Eunápolis Picos Modelo Reduzido Mossoró II Barreiras Sto. Antonio de Jesus Icó Mussuré II Paulo Afonso Penedo Cauípe Pici II Piripiri Pituaçu Santa Cruz II Banabuiú Currais Novos II Santana dos Matos II Coremas Fortaleza Joairam Juazeiro da Bahia II Matatu Natal II Itabaianinha Pirapama II Russas II Elizeu Martins Boa Esperança 230 Kv Boa Esperança 500 Kv Xingó 500 Kv Paulo Afonso IV Recife II S. João do Piaui Zebu Abaixadora Bom Jesus da Lapa Gov. Mangabeira Quixadá Jacaracanga Ribeirão Rio Largo II Messias Camaçari II Catu Cotegipe Teresina Fortaleza II Goianinha Teresina II Delmiro Gouveia Maceió Itabaiana Itaparica Jardim Sobral III Xingó 69 Kv Olindina Luiz Gonzaga 500kv Transformation Capacity (MVA) 640 450 333.34 300 173 12,5 300 401 201 200 401 302 201 400 242 402 90 121 92 50 300 405 451 302 380 401 73 400 300 101 110 300 1,200 2,410 418 38 110 162 100 301 300 301 1,201 2,605 300 302 600 1,800 300 600 401 400 223 10 1,601 1,200 12.5 40 - Location (State) Beginning of Operation End of Operation PB BA BA BA BA BA PI BA RN BA BA CE PB AL AL CE CE PI BA RN CE RN RN PB CE PE BA BA RN SE PE CE PI PI PI SE AL PE PI AL BA BA BA CE BA PE AL AL BA BA BA PI CE PE PI CE AL SE PE SE CE SE BA PE May/64 Jan/80 Jan/03 Jan/56 May/81 Sep/98 Jul/92 Jan/67 Jan/77 Jun/96 Mar/97 May/97 Mar/79 Mar/74 May/97 Mar/01 May/05 Aug/73 Mar/83 Mar/63 Jan/64 Nov/75 Nov/75 Dec/90 Jan/64 Jul/06 Apr/81 Jan/65 Jan/79 Feb/96 Feb/72 Nov/82 Jan/06 Mar/70 Nov/80 Nov/94 Jan/79 Jan/79 Nov/80 Nov/76 Oct/67 Sep/81 Mar/60 Jul/03 Jan/82 Oct/94 Dec/62 Nov/94 Jan/79 May/56 Jan/56 Apr/70 May/00 Jan/61 May/00 Jun/89 Sep/02 May/57 Jan/83 Aug/79 Apr/00 Jan/87 Apr/80 May/88 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 (*) The SE Bela Vista and Campina Grande I were transferred to Energisa, according to ANEEL Resolution 4,462/2013 81 Marketletter 8.2. SPE 8.2.1. Transmission Line SPE From - To Sistema de Transmissão do Nordeste S.A. Teresina II/PI to Sobral/CE and Fortaleza/CE Colinas–MiracemaGurupi-Peixe NovaSerra da Mesa 2 (TO / GO) Oriximiná - Silves - Lechuga (AM) and SE Lechuga (exCariri) TL Coletora Porto Velho/ Araraquara II, CS INTESA - Integração Transmissora de Energia S.A. Manaus Transmissora de Energia S.A. Interligação Elétrica do Madeira S.A. Participation (%) Extension (km) Tension (kV) Beginning of Operation End of Concession 49 546 500 Jan/06 Feb/34 12 695 500 May/08 Apr/36 19.5 559 500 Mar/13 Oct/38 24.5 2,375 600 Aug/13 Feb/39 8.2.2. Substations SPE Substation Interligação Elétrica do Madeira S.A. TDG – Transmissora Delmiro Gouveia S.A. Transformation capacity Location 3,150 RO Estação Retificadora CA/CC de 500 kV para +/- 600 kV. Estação Inversora CC/CA de +/600 kV para 500 kV. SE – Pecém II, de 500/230 kV. 2,950 SP 3,600 Beginning of Operation End of Operation May/14 Feb/39 Oct/13 Jul/40 Nov/13 Jul/40 CE SE – Aquiraz, de 230/69 kV. 450 9. Transmission losses % 1Q14 2Q14 3Q14 3.0 2.4 1.8 82 Marketletter 10.Main investments of parent company– R$ million Project Generation Generation system maintenance Combined cycle of UTE Camaçari Wind Power Casa Nova Deployment of Wind Park Extension of electric Energy System Extension Generation Cap. HEP Luiz Gonzaga (Itaparica) Implant. Solar project - Power Generation Itaparica resettlement area irrigation Transmission System extension Reimforcement and improvements System maintenance Suape II / Suape III venture Others Total 1Q14 2Q14 3Q14 2014 budget 66,03 14,83 0.03 25,82 0.13 - 57,34 25,20 0.05 9,22 0.95 - 50,08 19,32 0.04 16,93 0.47 - 424,73 151,59 1,09 86,36 42,27 1,00 - - - 0.62 0.01 25,21 221,01 94,94 93,38 32,52 0.17 12,06 299,10 0.04 21,88 228,18 106,30 89,85 31,90 0.13 12,22 297,74 0.03 13,29 185,82 91,29 69,61 24,71 0.21 16,41 252,31 1,60 140,20 1,253,70 629,14 433,06 190,5 1,00 162,18 1,840,61 11.New investments 11.1.Generation 11.1.1.Own assets Unit - Own assets Location (State) Total Investment (R$ million) Investment up to 3Q14 (R$ million) Installed capacity (MW) Guaranteed energy (MW Avg) BA 692,5 648,0 180 61,4 Mar/15 May/12 Jan/46 BA 102,47 0.9 28 7,1 May/18 Feb/15 Jul/49 BA 93,04 0.7 24 5,5 May/18 Feb/15 Jul/49 Parque Eólico Casa Nova I Parque Eólico UEE Casa Nova II Parque Eólico UEE Casa Nova III Beginning of Beginning of Operation Construction End of Concession 11.1.2.SPE UHE Jirau UHE B. Monte RO 3,750.0 Physical Assurance (MW) 2,184.6 Sep/13 Dec/09 Aug/43 PA 11,233.1 4,571.0 Nov/15 Aug/11 Aug/45 UHE Sinop MT 400.0 239.8 Mar/17 Dec/13 Feb/49 UEE UEE II UEE UEE Caiçara I Caiçara CE 30.0 13.5 Jan/16 Jul/14 Jun/47 CE 21.0 9.3 Jan/16 Jul/14 Jul/47 Junco I Junco II CE CE 30.0 30.0 12.1 11.1 Jan/16 Jan/16 Jul/14 Jul/14 Jul/47 Jul/47 UEE Santa Joana IX PI 30.0 15.8 Sep/15 Mar/14 Apr/49 UEE Santa Joana X PI 30.0 16.0 Sep/15 Mar/14 Apr/49 UEE Santa Joana XI PI 30.0 16.0 Sep/15 Mar/14 Apr/49 UEE Santa PI 30.0 16.9 Sep/15 Mar/14 Apr/49 SPE ESBR Participações S.A. Norte Energia S.A. Cia Energética Sinop S.A. U.E.E. Caiçara I S.A. U.E.E. Caiçara II S.A. U.E.E. Junco I S.A. U.E.E. Junco II S.A V. de Santa Joana IX Energia Renováveis S.A. V. de Santa Joana X Energia Renováveis S.A. V. de Santa Joana XI Energia Renováveis S.A. V. de Santa Joana XII Unit Location Installed Capacity (MW) Beginning of Operation Beginning of Construction End of Concession 83 Marketletter SPE Energia Renováveis S.A. V. de Santa Joana XIII Energia Renováveis S.A. V. de Santa Joana XV Energia Renováveis S.A. V. de Santa Joana XVI Energia Renováveis S.A. Baraúnas I Energética S.A. Mussambê Energética S.A. Morro Branco I Energética S.A. Caititú 2 Energia S.A. Caititú 3 Energia S.A. Teiú 2 Energia S.A. Arapapá Energia S.A. Carcará Energia S.A. Corrupião 3 Energia S.A. Acauã Energia S.A. Angical 2 Energia S.A. Banda de Couro Energética S.A. Baraúnas II Energética S.A. Coqueirinho 2 Energia S.A. Papagaio Energia S.A. Tamanduá Mirim 2 Energia S.A. Eólica Serra das Vacas I S.A. Eólica Serra das Vacas II S.A. Eólica Serra das Vacas III S.A. Eólica Serra das Vacas IV S.A. V. de Santa Joana I Energia Renováveis S.A. V. de Santa Joana III Energia Renováveis S.A. V. de Santa Joana IV Energia Renováveis S.A. V. de Santa Joana V Energia Renováveis S.A. V. de Santa Joana VII Energia Renováveis S.A. V. de Santo Augusto IV Energia Renováveis S.A. Location Installed Capacity (MW) Physical Assurance (MW) Beginning of Operation Beginning of Construction End of Concession UEE Santa Joana XIII PI 30.0 16.0 Sep/15 Mar/14 Apr/49 UEE Santa Joana XV PI 30.0 16.2 Sep/15 Mar/14 Apr/49 UEE Santa Joana XVI PI 30.0 17.4 Sep/15 Mar/14 Apr/49 BA 29.7 12.4 Sep/15 Mar/14 Apr/49 BA 29.7 11.5 Sep/15 Mar/14 Apr/49 BA 29.7 12.7 Sep/15 Mar/14 Apr/49 BA BA BA BA BA 14.0 14.0 14.0 10.0 10.0 5.1 4.7 4.2 2.2 4.6 Sep/15 Sep/15 Sep/15 Sep/15 Sep/15 Nov/14 Nov/14 Nov/14 Nov/14 Nov/14 Apr/49 Apr/49 Apr/49 Apr/49 Apr/49 BA 14.0 4.2 Sep/15 Nov/14 Apr/49 BA 12.0 3.1 Sep/15 Nov/14 Apr/49 BA 14.0 5.1 Sep/15 Nov/14 Apr/49 BA 29.7 12.9 May/18 Jan/15 Jul/49 BA 21.6 7.8 May/18 Jan/15 Jul/49 BA 20.0 8.5 Jan/16 Nov/14 Jun/49 BA 18.0 4.9 Jan/16 Nov/14 Jun/49 BA 24.0 8.0 May/18 Nov/14 Jun/49 PE 30.0 12.2 Jan/16 Aug/14 Jun/49 PE 30.0 9.9 Jan/16 Aug/14 Jun/49 PE 30.0 11.0 Jan/16 Aug/14 Jun/49 PE 30.0 10.5 Jan/16 Aug/14 Jun/49 UEE Santa Joana I PI 30.0 14.7 Jan/16 Jun/14 Jun/49 UEE Santa Joana III PI 30.0 14.3 Jan/16 Jun/14 Jun/49 UEE Santa Joana IV PI 30.0 14.2 Jan/16 Jun/14 Jun/49 UEE Santa Joana V PI 30.0 14.1 Jan/16 Jun/14 Jun/49 UEE Santa Joana VII PI 30.0 14.8 Jan/16 Jun/14 Jun/49 UEE Santo Augusto IV PI 30.0 15.7 Jan/16 Jun/14 Jun/49 Unit Joana XII UEE Baraúnas I UEE Mussambê UEE Morro Branco I UEE Caititú 2 UEE Caititú 3 UEE Teiú 2 UEE Arapapá UEE Carcará UEE Corrupião 3 UEE Acauã UEE Angical 2 UEE Banda de Couro UEE Baraunas II UEE Coqueirinho 2 UEE Papagaio UEE Tamanduá Mirim 2 UEE Serra das Vacas I UEE Serra das Vacas II UEE Serra das Vacas III UEE Serra das Vacas IV 84 Marketletter 11.1.2.1 SPE SPE Unit Investiment (R$ million) Up to Total 3Q14 Participation Working Schedule (%) (%) Partners 18,641 17,954,40 95.54 20.00 UHE B. Monte 29,375,00 14,983,60 58.6 15.00 Cia Energética Sinop S.A. U.E.E. Caiçara I S.A. U.E.E. Caiçara II S.A. U.E.E. Junco I S.A. U.E.E. Junco II S.A. V. de Santa Joana IX Energia Renováveis S.A. V. de Santa Joana X Energia Renováveis S.A. V. de Santa Joana XI Energia Renováveis S.A. V. de Santa Joana XII Energia Renováveis S.A. V. de Santa Joana XIII Energia Renováveis S.A. V. de Santa Joana XV Energia Renováveis S.A. V. de Santa Joana XVI Energia Renováveis S.A. UHE Sinop UEE Caiçara I UEE Caiçara II UEE Junco I UEE Junco II 1,804.81 134.0 93.3 120.8 120.8 79.6 6.9 4.6 6.7 6.3 10.4 35 35 35 35 24.50 49.00 49.00 49.00 49.00 UEE Santa Joana IX 102.94 58.5 62 49.00 UEE Santa Joana X 102.94 56.5 62 49.00 UEE Santa Joana XI 102.94 51.2 62 49.00 102.94 64.6 62 49.00 102.94 56.6 62 49.00 UEE Santa Joana XV 102.94 77.7 62 49.00 UEE Santa Joana XVI 102.94 62.4 62 49.00 Baraúnas I Energética S.A. UEE Baraúnas I 103.95 - (**) 49.00 Mussambê Energética S.A. UEE Mussambê 103.95 - (**) 49.00 UEE Morro Branco I 103.95 - (**) 49.00 40.16 40.16 40.16 28.69 28.69 40.16 34.42 40.16 74.00 66.60 6.50 6.50 5.20 2.60 6.50 6.50 3.90 6.50 0.41 0.26 (**) (**) (**) (**) (**) (**) (**) (**) (**) (**) 49.00 49.00 49.00 49.00 49.00 49.00 49.00 49.00 49.00 49.00 Mizha Energia Suez Energy/ Eletrosul Eletrobras/Eletronorte Petros/ Belo Monte Part Amazonas Energia e Outros Eletronorte/ Alupar Envolver Participações Envolver Participações Envolver Participações Envolver Participações Contour Global/ SalusFip/ Ventos de Santa Joana Contour Global/ SalusFip/ Ventos de Santa Joana Contour Global/ SalusFip/ Ventos de Santa Joana Contour Global/ SalusFip/ Ventos de Santa Joana Contour Global/ SalusFip/ Ventos de Santa Joana Contour Global/ SalusFip/ Ventos de Santa Joana Contour Global/ SalusFip/ Ventos de Santa Joana Brennand Energia S.A./ Brennand Energia Eólica Brennand Energia S.A./ Brennand Energia Eólica Brennand Energia S.A./ Brennand Energia Eólica Sequóia Sequóia Sequóia Sequóia Sequóia Sequóia Sequóia Sequóia Sequóia Sequóia 73.20 0.55 (**) 49.00 Sequóia 75.6 - (**) 49.00 103.95 - (**) 49.00 124.4 - (**) 49.00 PEC Energia 122.6 - (**) 49.00 PEC Energia 122.6 - (**) 49.00 PEC Energia 122.6 - (**) 49.00 ESBR Participações S.A. UHE Jirau Norte Energia S.A. Morro Branco I Energética S.A. Caititu 2 Energia S.A. Caititu 3 Energia S.A. Teiú 2 Energia S.A. Arapapá Energia S.A. Carcará Energia S.A. Corrupião 3 Energia S.A. Acauã Energia S.A. Angical 2 Energia S.A. Coqueirinho 2 Energia S.A. Papagaio Energia S.A. UEE Santa Joana XII UEE Santa Joana XIII UEE Caititú 2 UEE Caititú 3 UEE Teiú 2 UEE Arapapá UEE Carcará UEE Corrupião 3 UEE Acauã UEE Angical 2 UEE Coqueirinho 2 UEE Papagaio UEE Tamanduá Mirim Tamanduá Mirim 2 Energia S.A. 2 Baraúnas II Energética S.A. UEE Baraunas II Banda de Couro Energética S.A. UEE Banda de Couro Eólica Serra das Vacas I S.A. Eólica Serra das Vacas II S.A. Eólica Serra das Vacas III S.A. Eólica Serra das Vacas IV S.A. V. de Santa Joana Renováveis S.A. V. de Santa Joana Renováveis S.A. V. de Santa Joana Renováveis S.A. V. de Santa Joana Renováveis S.A. I Energia III Energia IV Energia V Energia UEE I UEE II UEE III UEE IV Serra das Vacas Serra das Vacas Serra das Vacas Serra das Vacas UEE Santa Joana I 105.25 17.0 28 49.00 UEE Santa Joana III 105.25 22.3 28 49.00 UEE Santa Joana IV 105.25 13.1 28 49.00 UEE Santa Joana V 105.25 12.9 28 49.00 Brennand Energia/ Brennand Energia Eólica S.A Brennand Energia/ Brennand Energia Eólica S.A PEC Energia Contour Global/ SalusFip/ Ventos de Santa Joana Contour Global/ SalusFip/ Ventos de Santa Joana Contour Global/ SalusFip/ Ventos de Santa Joana Contour Global/ SalusFip/ Ventos de Santa Joana 85 Marketletter SPE Investiment (R$ million) Up to Total 3Q14 Unit V. de Santa Joana VII Energia UEE Santa Joana VII Renováveis S.A. V. de Santo Augusto IV Energia UEE Santo Augusto Renováveis S.A. IV Participation Working Schedule (%) (%) 105.25 14.3 28 49.00 105.25 13.0 28 49.00 Partners Contour Global/ SalusFip/ Ventos de Santa Joana Contour Global/ SalusFip/ Ventos de Santa Joana (**) Not started working. 11.2.Transmission 11.2.1.Own assets 11.2.1.1.Transmission lines Own lines From - To LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT LT 230 230 230 230 230 230 230 230 230 230 500 500 230 230 230 230 230 230 230 230 230 230 kV kV kV kV kV kV kV kV kV kV kV kV kV kV kV kV kV kV kV kV kV kV Eunápolis/Teixeira Freitas II C1 Funil/Itapebi C3 Eunápolis/Teixeira Freitas II C2 Pau Ferro – Santa Rita II Paraiso/Açu II, C3 Açu/Mossoró II, C2 Sobral III/Acaraú II Morro do Chapéu II/Irecê Paraíso/Lagoa Nova II Teresina II/Teresina III Recife II/Suape II, C2 Camaçari IV/Sapeaçu Sapeaçu/Sto.Antonio de Jesus Jardim/ N Sra do Socorro Messias/ Maceió II Camaçari IV/Pirajá Pituaçú/Pirajá Mossoró II/ Mossoró IV Ceará Mirim II/Touros Russas II/ Banabuiu C2 Igaporã II – Igaporã III C1 e C2 Igaporã III – Pindaí II Total Investment (R$ Million) 30,09 41,07 44,15 34,00 59,48 25,87 22,13 33,11 13,76 61,12 84,29 13,60 47,07 81,74 77,50 Extension of TL (km) 152 223 152 96,7 123 69 97 65 65 26 44 105 31 1,3 20 45 5 40 56,17 110 4 46 Tension (kV) 230 230 230 230 kV kV kV kV 230 kV 230 230 230 230 500 500 230 230 230 230 230 230 230 230 230 230 kV kV kV kV kV kV kV kV kV kV kV kV kV kV kV kV Beginning of Operation End of Concession Dec/15 Feb/16 Dec/15 Jan/16 Jul/15 Jul/15 Apr/15 Sep/15 Apr/15 Jul/15 Feb/16 Jan/16 Jan/16 Feb/15 Sep/15 Dec/15 Dec/15 Sep/15 Aug/15 Nov/15 May/15 May/15 Oct/38 Apr/37 Aug/39 Aug/39 Nov/40 Nov/40 Nov/40 Oct/41 Oct/41 Dec/41 Dec/41 Dec/41 Dec/41 May/42 May/42 May/42 May/42 Jun/42 Jun/42 Jun/42 Jun/42 Jun/42 86 Marketletter 11.2.1.2.Substations Substation SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE SE Total Investment (R$ million) 230/69 kv Polo 230 kv Morro do Chapéu 230 kv Lagoa Nova 230 kv Ibiapina 230/69 kv Teresina III 230/69 kv N.S. Socorro 230/69 kv Maceió II 230/138 kv Poções II 230/69 kv Pirajá 230/69 kv Mirueira II 230/69 kv Jaboatão II 230 kv Touros 230 kv Mossoró IV 500/230 kv Igaporã III 230 kv Pindaí II 230/138 kV Teixeira de Freitas II 17,18 24,33 Transformation Capacity (MVA) 100 150 300 200 400 300 400 200 360 300 300 150 100 51,22 29,21 94,43 30,57 68,77 46,18 Location MVA MVA MVA MVA MVA MVA MVA MVA MVA MVA MVA MVA MVA BA BA RN CE PI SE AL BA BA PE RN Beginning of Operation End of Concession Dec/14 Sep/15 Abr/15 Oct/15 Jul/15 Feb/15 Sep/15 May/15 Sep/15 Jan/15 Jan/16 Aug/15 Sep/15 Oct/40 Oct/41 May/42 Oct/41 Dec/41 May/42 May/42 Dec/42 99,44 2,050 MVA BA May/15 Jun/42 17,91 100 MVA BA Dec/15 Oct/38 11.2.2.SPEs 11.2.2.1.Transmission lines SPE TDG Transmissora Delmiro Gouveia S.A. Extremoz Transmissora do Nordeste –ETN S.A. Interligação Elétrica Garanhuns S.A. From - To Participation (%) LT São Luiz II/ São Luiz III 49 LT Ceará Mirim II/João Câmara III, 500 kV. LT Ceará Mirim II/ Campina III, 500 kV. LT Ceará Mirim II/ Extremoz II, 230 kV. LT Campina Grande III/Campina Grande II, 230 kV. LT Luiz Gonzaga/ Garanhuns, 500 kV LT Garanhuns/ Campina Grande III, 500 kv LT Garanhuns/ Pau Ferro, 500 kV LT Garanhuns/ Angelim I, 230 kV. 49 49 Total Investment (R$ million) Up to 3Q14 Total (R$ million) 367,9 365,9 548,70 351 63,3 Extension of lines (Km) Tension (kV) 156 230 64 500 201 500 26 230 8,5 230 224 500 190 500 239 500 13 230 482,00 Beginning of Operation End of Concession May/15 Jul/40 Jan/15 Oct/41 Feb/15 Dec/41 87 Marketletter 11.2.2.2.Substations SPE Total Investment (R$ million) SE SE – João Câmara III, 500/138 kV. Extremoz Transmissora SE – Campina do Nordeste – ETN S/A Grande III, 500/230 kV. SE – Ceará Mirim II, 500/230 kV. SE – Garanhuns, 500/230 kV Interligação Elétrica Garanhus S/A SE – Pau Ferro, 500/230 kV Investiment up to 3Q14 (R$ million) Transformation Capacity (kV) Location (State) 500/138 RN 500/230 PB 500/230 RN * 197,0 127,54 81,28 500/230 96,80 60,93 500/230 Balance 06.30.14 Balance 09.30.14 PE Beginning of Operation End of Concession Jan/15 Oct/41 Feb/15 Dec/41 (*) Investiment on SEs aggregated with LTs. 12. Loans and financing – R$ million Local currency – LC Creditor Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Banco do Brasil Banco do Nordeste – Maq/Equip/Benf Banco do Nordeste – Finame (PSI-BK) Caixa Econômica Federal Total Balance 03.31.14 Due Date Index 41,6 0.2 0.2 4.5 0.4 5,0 509,8 39,3 0.2 0.2 4,1 0.4 4,6 510,2 37,0 0,1 0,1 3,7 0,4 4,2 510,9 09/30/2018 05/30/2015 05/30/2016 02/28/2017 12/30/2018 04/30/2016 09/28/2018 5.0% py 5.0% py 5.0% py 5.0% py IPCA 5.0% py 115% of CDI 270,1 259,3 248,5 06/30/2020 7.5% py 13,5 12,9 12,3 06/15/2020 4.5% py 403,9 1,249.2 404,4 1,235.6 404,3 1,221.5 02/27/2019 115% of CDI Foreign currency – FC – N/A 88 Marketletter 13.Contracts 13.1.Loans and financing - R$ million 13.1.1.Parent company Loans and financing By activity Generation Transmission Energy tradings By creditor Eletrobras Others 2014 2015 2016 2017 2018 29,760 16,045 13,715 - 233,135 178,403 54,732 - 283,025 228,293 54,732 - 280,610 225,878 54,732 - 277,502 225,083 52,419 - 95,473 50,000 45,473 - 2019 After 2019 Total (LC+ FC) 22,087 22,087 - 1,221,592 923,702 297,890 - 3,187 26,573 12,663 220,473 12,552 270,473 10,138 270,473 7,029 270,471 95,473 22,087 45,569 1,176,023 13.1.2.SPE Sistema de Transmissão Nordeste S.A. Loans and financing 2014 2015 2016 2017 By activity Transmission By creditor Banco do Nordeste do Brasil 4,5 4,5 4,5 4,5 18,4 18,4 18,4 18,4 19,3 19,3 19,3 19,3 20,4 20,4 20,4 20,4 2018 2019 21,4 21,4 21,4 21,4 After 2019 Total (LC+ FC) 22,5 22,5 22,5 22,5 76,8 76,8 76,8 76,8 183,3 183,3 183,3 183,3 Integração Transmissora de Energia S.A. Loans and financing By activity Transmission By creditor BNDES 2014 2015 2016 2017 8,2 8,2 8,2 8,2 30,6 30,6 30,6 30,6 30,6 30,6 30,6 30,6 30,6 30,6 30,6 30,6 2018 2019 30,6 30,6 30,6 30,6 After 2019 Total (LC+ FC) 30,6 30,6 30,6 30,6 25,5 25,5 25,5 25,5 186,7 186,7 186,7 186,7 Manaus Transmissora de Energia S.A. Loans and financing By activity Transmission By creditor BNDES BASA 2014 2015 2016 2017 11,7 11,7 11,7 11,7 - 52,1 52,1 52,1 31,4 20,7 55,6 55,6 55,6 31,5 24,1 56,3 56,3 56,3 31,2 25,1 2018 2019 57,6 57,6 57,6 31,3 26,3 After 2019 Total (LC+ FC) 58,7 58,7 58,7 31,2 27,5 580,3 580,3 580,3 216,0 364,3 872,3 872,3 872,3 384,3 488,0 Interligação Elétrica do Madeira S.A. Loans and financing By activity Transmission By creditor BNDES BASA BONDS 2014 2015 2016 2017 138,9 138,9 138,9 128,6 10,4 92,5 92,5 92,5 92,5 - 132,8 132,8 132,8 123,3 7,6 1,9 143,5 143,5 143,5 123,3 18,2 1,9 2018 2019 161,0 161,0 161,0 123,3 18,2 19,5 After 2019 Total (LC+ FC) 176,6 176,6 176,6 123,3 18,2 35,1 1.591,4 1.591,4 1.591,4 1.030,9 229,3 331,1 2.297,7 2.297,7 2.297,7 1.616,5 291,6 389,6 Interligação Elétrica Garanhuns S.A. Loans and financing By activity Transmission By creditor BNDES 2014 2015 2016 2017 - 27,50 27,50 27,50 27,50 26,71 26,71 26,71 26,71 26,71 26,71 26,71 26,71 2018 26,71 26,71 26,71 26,71 2019 26,71 26,71 26,71 26,71 After 2019 190,87 190,87 190,87 190,87 Total (LC+ FC) 325,20 325,20 325,20 325,20 89 Marketletter Norte Energia S.A. Loans and financing By activity Generation By creditor BNDES CEF Others 2014 2015 2016 2017 2018 2019 After 2019 - - - 212,0 212,0 212,0 138,0 57,0 16,0 543,0 543,0 543,0 326,0 169,0 49,0 620,0 620,0 620,0 371,0 193,0 55,0 13,616,0 13,616,0 13,616,0 8,127,0 4,270,0 1,220,0 Total (LC+ FC) 14,991,0 14,991,0 14,991,0 8,962,0 4,689,0 1,340,0 ESBR Participações S.A. Loans and financing By activity Generation By creditor Banco do Nordeste do Brasil Banco do Brasil BNDES Banco Itaú BBA CEF Bradesco 2014 2015 2016 2017 2018 2019 After 2019 Total (LC+ FC) 187,1 187,1 187,1 4,1 26,5 93,1 17,9 26,5 19,1 561,2 561,2 561,2 12,3 79,4 279,4 53,6 79,4 57,2 561,2 561,2 561,2 12,3 79,4 279,4 53,6 79,4 57,2 561,2 561,2 561,2 12,3 79,4 279,4 53,6 79,4 57,2 561,2 561,2 561,2 12,3 79,4 279,4 53,6 79,4 57,2 561,2 561,2 561,2 12,3 79,4 279,4 53,6 79,4 57,2 8,231,3 8,231,3 8,231,3 180,2 1,164,3 4,098,3 785,9 1,164,3 838,3 11,224,6 11,224,6 11,224,6 245,7 1,587,7 5,588,6 1,071,7 1,587,7 1,143,2 After 2019 Total (LC+ FC) Energética Águas da Pedra S.A. Loans and financing By activity Generation By creditor BNDES 2014 2015 2016 2017 2018 2019 8,5 8,5 8,5 8,5 34,0 34,0 34,0 34,0 34,0 34,0 34,0 34,0 33,7 33,7 33,7 33,7 33,4 33,4 33,4 33,4 33,4 33,4 33,4 33,4 235,9 235,9 235,9 235,9 412,9 412,9 412,9 412,9 Transmissora Delmiro Gouveia S.A. Loans and financing By activity Transmission By creditor Banco do Nordeste do Brasil 2014 2015 2016 2017 2018 154 154 154 154 - - - - 2019 After 2019 Total (LC+ FC) - - 154,0 154,0 154,0 154,0 São Pedro do Lago S.A. Loans and financing By activity Generation By creditor BNDES 2014 2015 2016 2017 2018 2019 1,3 1,3 1,3 1,3 5,0 5,0 5,0 5,0 5,0 5,0 5,0 5,0 5,0 5,0 5,0 5,0 5,0 5,0 5,0 5,0 5,0 5,0 5,0 5,0 2014 2015 2016 2017 2018 2019 1,2 1,2 1,2 1,2 4,9 4,9 4,9 4,9 4,9 4,9 4,9 4,9 4,9 4,9 4,9 4,9 4,9 4,9 4,9 4,9 4,9 4,9 4,9 4,9 After 2019 Total (LC+ FC) 49,5 49,5 49,5 49,5 75,8 75,8 75,8 75,8 Pedra Branca S.A. Loans and financing By activity Generation By creditor BNDES After 2019 Total (LC+ FC) 47,9 47,9 47,9 47,9 73,6 73,6 73,6 73,6 90 Marketletter Sete Gameleiras S.A. Loans and financing By activity Generation By creditor BNDES 2014 2015 2016 2017 2018 1,2 1,2 1,2 1,2 4,9 4,9 4,9 4,9 4,9 4,9 4,9 4,9 4,9 4,9 4,9 4,9 4,9 4,9 4,9 4,9 2014 2015 2016 2017 2018 42,2 42,2 42,2 42,2 - - - - 2019 After 2019 Total (LC+ FC) 4,9 4,9 4,9 4,9 48,1 48,1 48,1 48,1 73,8 73,8 73,8 73,8 2019 After 2019 Total (LC+ FC) - - 42,2 42,2 42,2 42,2 Santa Joana IX Loans and financing By activity Generation By creditor BNDES Santa Joana X Loans and financing By activity Generation By creditor BNDES 2014 2015 2016 2017 2018 43,3 43,3 43,3 43,3 - - - - 2014 2015 2016 2017 2018 42,5 42,5 42,5 42,5 - - - - 2014 2015 2016 2017 2018 50,8 50,8 50,8 50,8 - - - - 2014 2015 2016 2017 2018 42,8 42,8 42,8 42,8 - - - - 2019 After 2019 Total (LC+ FC) - - 43,3 43,3 43,3 43,3 2019 After 2019 Total (LC+ FC) - - 42,5 42,5 42,5 42,5 2019 After 2019 Total (LC+ FC) - - 50,8 50,8 50,8 50,8 2019 After 2019 Total (LC+ FC) - - 42,8 42,8 42,8 42,8 2019 After 2019 Total (LC+ FC) - 47,6 47,6 47,6 47,6 Santa Joana XI Loans and financing By activity Generation By creditor BNDES Santa Joana XII Loans and financing By activity Generation By creditor BNDES Santa Joana XIII Loans and financing By activity Generation By creditor BNDES Santa Joana XV Loans and financing By activity Generation By creditor BNDES 2014 2015 2016 2017 47,6 47,6 47,6 47,6 - - - 2018 - - 91 Marketletter Santa Joana XVI Loans and financing By activity Generation By creditor BNDES 14.Number of employees 2014 2015 2016 2017 2018 50,4 50,4 50,4 50,4 - - - - 2019 After 2019 - - Total (LC+ FC) 50,4 50,4 50,4 50,4 (including requested employees from other Eletrobras companies/ excluding employees assigned to other Eletrobras companies) 14.1.By tenure Generation Composition of employees by tenure (Years) Up to 5 6 to 10 11 to15 16 to 20 21 to 25 Beyond 25 Total 1Q14 2Q14 3Q14 155 105 120 7 1 382 770 159 124 102 25 383 793 159 106 123 25 384 797 1Q14 2Q14 3Q14 422 208 278 31 736 1,675 494 224 251 65 742 1,776 495 185 289 65 740 1,774 1Q14 2Q14 3Q14 389 252 157 16 3 1,175 1,992 391 281 155 18 2 1,168 2,015 391 248 188 18 1 1,163 2,009 Transmission Composition of employees by tenure (Years) Up to 5 6 to 10 11 to15 16 to 20 21 to 25 Beyond 25 Total Administration Composition of employees by tenure (Years) Up to 5 6 to 10 11 to15 16 to 20 21 to 25 Beyond 25 Total 14.2.By region State Bahia Pernambuco Ceará Piauí 1Q14 1,663 2,189 316 269 Number of employees 2Q14 1,698 2,289 323 274 3Q14 1,691 2,291 324 274 14.3.By departments Department Field Administrative 1Q14 Number of employees 2Q14 3Q14 2,953 1,484 3,070 1,514 3,071 1,509 92 Marketletter 14.Complementary work force – N/A 15.Turn-over - % 1Q14 2Q14 3Q14 0.64 1.82 0.15 93 Marketletter Balance Sheet (R$ thousand) Financial Statements for Consolidation Purposes Assets Current Assets Availabilities Clients (Consumers and resellers) Loans and financing - principal Marketable Securities Dividends to receive (Remuneration of equity participation) Fiscal Assets deferred (Taxes and contributions) Income Tax and Social Contribution Derivatives Reimbursement Rights - CCC (12,111 law) Linked deposits Stored materials Financial Asset Receivables - 12,783/13 Law Others Current Assets Total . Non-Current Assets Clients (Consumers and resellers) Loans and financing - principal Marketable Securities Fiscal Assets deferred (Taxes and contributions) Income Tax and Social Contribution Derivatives Reimbursement Rights - CCC (12,111 Law) Linked deposits Financial Asset – Annual allowed Revenue (transmission) Receivables - 12,783/13 Law Others Advances for equity participation INVESTMENTS FIXED ASSETS INTANGIBLE Non-Current Assets Total Assets Total Consolidated 09.30.14 09.30.13 356,392 901,867 126,026 1,870,914 49,642 85,213 137,895 61,735 310,278 373,178 159,486 4,432,626 474,955 846,874 104,757 1,603,721 252,395 108,944 144,325 63,741 276,094 331,364 54,494 4,261,664 15,430 220 17,164 145,052 237,948 404,582 4,251,021 1,363,730 398,669 6,833,816 2,526,331 7,532,204 18,776 16,911,127 21,343,753 173,932 205 104,597 113,244 280,838 4,088,044 276,137 1,321,743 21,162 6,379,902 2,008,597 8,039,198 25,521 16,453,218 20,714,882 94 Marketletter Liabilities and Stockholders’ Equity Consolidated 09.30.14 09.30.13 Current Liabilities Suppliers Loans and financing Bonds Taxes and social contribution Income Tax and Social Contribution Derivative financial instruments Advances from consumers Shareholders remuneration (dividends payable) Estimated obligations Provisions for contingencies Post-emplyment benefit (Complementary Pension Fund) Onerous Contracts Concessions to pay - UBP Sector charges (regulatory taxes) Incentive to personnel retirement Others Current Liabilities Total 822,439 520,889 19,065 58,148 223,816 52,813 211 237,927 3,066 297,465 187,677 2,423,516 418,356 507,707 2,058 67,539 185,031 48,910 685 310,544 276,837 161,080 152,004 2,130,751 Non-Current Liabilities Suppliers Loans and financing Bonds Taxes and social contribution Income Tax and Social Contribution Derivative Advances from consumers Estimated obligations Provisions for contingencies Provision for onerous contract Post-Employment benefit (Complementary Pension Fund) Sectorial Charges (regulatory taxes) Advance for future Capital Increase Incentive to personnel retirement Others Non-Current Liabilities Total 193,842 3,917,865 207,466 23,798 213,621 732,353 2,051 533,335 85,860 68,822 12,984 66,107 6,058,104 4,525,699 209,322 106,128 113,244 789,318 553,709 20,295 52,312 19,564 231,477 39,061 72,502 6,732,631 Stockholders’ Equity Social Capital Capital reserves Profit reserves Additional dividends proposed Accrued profit/losses Other comprehensive income Non-controlling participation 11,563,279 126,605 1,232,225 -59,976 - 9,326,355 2,011,460 563,522 -49,837 - Stockholders’ Equity Total 12,862,133 11,851,500 Liabilities and Stockholders’ Equity Total 21,343,753 20,714,882 95 Marketletter Statement of Income by activity (R$ thousand) Consolidated 09.30.14 09.30.13 Operating Revenue Generation Plant Supply Energy Supply Short term electric Energy O&M Revenue of Renewed Plants Construction Plant Revenue Return on Investment - G 2,522,264 1,004,725 950,632 12,065 - 1,793,474 1,053,669 428,260 9,713 - 286,781 -8,727 139,410 104,473 167,588 202,143 239,110 116,102 175,226 -650,089 4,529,122 -533,555 3,484,142 -1,048,216 -396,571 -35,213 -139,410 -55,511 -413,754 -10,064 -239,110 -989,162 -195,241 -334,133 -590 -4,909 -87,266 -3,230,711 -1,082,854 -176,045 -337,173 -2,126 566,994 -105,545 -1,855,188 Result of equity participation Operating Result before Financial Result 48,031 1,346,442 24,044 1,652,998 Financial Result Result before Income Tax / Social Contribution -30,190 1,316,252 -380,589 1,272,409 Current Income Tax and and social contribution Deferred Income Tax and and social contribution Net income for the period -77,996 -6,031 1,232,225 -17,917 -2,998 1,251,494 Transmission O&M Revenue Renewed Lines O&M Revenue Construction Revenue – Transmission Return on Investment - T Other Operating Revenue Deductions to Operating Revenue Net Operating Revenue Operating Costs Electric Energy purchased for resale Charges on the use of electric grid Fuel for production of Electric Energy Construction costs Operating Expenses Personnel, Material and Third part related services Remuneration and reimbursement Depreciation and amortization Donations and Contributions Provisions Others Operating Costs and Expenses 96 Marketletter Cash Flow (R$ thousand) Cash Flow 09.30.2014 09.30.2013 OPERATING ACTIVITIES Profit/Loss before income tax and social contribution Depreciation and amortization Net monetary and currency variations Financial charges Equity Equivalency Result Provision for uncovered liability Provision for credits of questionable liquidation Provision for contingencies Provision for staff realignment Impairment Global reversal reserve charges Adjustment to present value / market value Minority Participation in the Results Charges on shareholders funds Revenue of financing assets - IRR Derivative financial instruments Others Variation in operating assets / liabilities Cash generated in operating activities 1,316,252 339,978 40,587 248,606 -48,031 2,980 -54,999 -104,473 -40,416 -15,758 462,007 2,146,733 1,299,648 337,173 18,486 298,885 -24,044 -689,023 47,621 -100,546 24,254 -116,102 140,321 -42,703 -495,909 698,061 Financial charges paid Payment of global reversal reserve charges Financial charges received Remuneration received from equity participation Financial asset revenue by RAP Receiving compensation for financial asset Payment of income tax and social contribution Payment of pension fund Lawsuits payment Legal deposits Net cash operating activities -216,223 14,881 161,704 227,939 -70,756 -4,242 -71,613 2,188,423 -286,327 32,416 108,617 1,212,179 -9,692 255,674 2,010,928 FINANCING ACTIVITIES Loans and financing obtained Loans and financing payable – principal Payment of Shareholders remuneration Payment on refinancing of taxes and contributions - Principal Receipt of Advance for future Capital Increase Others Net financing activities 36,762 -658,302 -406,535 -1,028,075 128,345 -778,299 139,500 -510,454 INVESTMENT ACTIVITIES Receiving of loans and Financing Acquisition of fixed asset Acquisition of intangible asset Acquisition of Concession asset Advance for future capital increase Acquisition of equity participation Others Net cash investment activities -126,026 -72,221 -250 -139,410 -346,714 -392,952 -121,707 -1,199,280 -60,842 -239,110 -21,162 -246,537 -851,502 -1,419,153 -38,932 81,321 395,324 356,392 -38,932 295,154 376,475 81,321 Increase (decrease) in cash and cash equivalent Cash and cash equivalent – beginning of period – 12/31/12 Cash and cash equivalent – end of period – 03/31/13 97 Marketletter Analysis of the results 3Q14 x 2Q14 In 3Q14 the Company presented a net profit 171.5% lower than the registered in 2Q14, from a profit of R$ 434.4 million to a loss of R4 310.6 million, due to the factors described below. Operating Revenue In Generation: The electric energy supply for final clients showed a reduction of 3.7%, from R$ 317.8 million in 2Q14 to R$ 306.1 million in 3Q14 due mainly to the reduction in supply demand related to the previous quarter. The electric energy supply for distribution companies presented an increase of 10.5%, from R$ 856.6 million in 2Q14 to R$ 946.5 million in 3Q14, mainly due to the increase in demand. The elecric energy traded in the short-term market presented reduction of 98.4%, from R$ 105.9 million in 2Q14 to R$ 1.7 million in 3Q14, due mainly the company pass from seller to buyer position in short-term energy market. In Transmission The financial asset remuneration presented increase of 624%, from R$ 6,8 million in 2Q14 to R$ 49.2 million in 3Q14, due mainly to the revenue incorporation of controlled companies Estação Transmissora de Energia S/A and Rio Branco Transmissora de Energia S/A. The revenue of operation and maintenance of renewed lines increased by 60.2%, from R$ 79.8 million in 2Q14 to R$ 127.8 million in 3Q14, mainly due to re-adjustment by IPCA and the receipt of overdue installments. Operating Expenses Personnel expenses, materials and third party services decreased by 0.9%, from R$ (336.8) million in 2Q14 to R$ (333.6) million in 3Q14, causing no significant impact in result. The electric energy purchased for resale increased by 775.8%, from R$ (105.1) million in 2Q14 to R$ (920.3) million in 3Q14, primarily due to increased in purchasing power, reflecting the negative determination in the CCEE settlement. The operating provisions and reversals decreased by 136.2%, from a provision in 2Q14 to a reversal in 3T14, mainly due to the reversal of the provision of credit held in 2Q14 in Boa Vista Energia. Financial Result The others financial income decreased by 69.4%, from R$ 73.1 million in 2Q14 to R$ 22.3 million in 3Q14, mainly due to the negative variation of R$ 7 million in derivatives and that in the previous quarter had registered R$ 47 million in positive result. The other financial expenses increased 414%, from R$ 2.3 million in 2Q14 to R$ 12 million in 3Q14, not impacting the result significantly. The net exchange variations reduced by 87%, from R$ 16.4 million in 2Q14 to R$ 2.1 million in 3Q14, mainly due to foreign exchange contracts with Eletrobras, which generated net forward exchange differences resulting from the fluctuation of value of the currency. The remuneration of the indemnities of the 12,783/13 Law showed an increase of 212.8%, from R$ 14.2 million in 2Q14 to R$ 44.6 million in 3Q14, mainly due to the recognition in the August 2014 of interest and penalties in the amount of R$ 27 million related to adjustments to calculation of the previous months of 2014. Equity Participations The result from equity investments decreased by 133.8%, from R$ 31.2 million in 2Q14 to R$ 10.6 million in 3Q14, mainly due to the decrease in income from equity of Eletronorte on their investments in SPEs. 98 Marketletter Market Data 1.Generation Assets and Energy generated 1.1.Own assets Guaranteed Energy (MW Average) Installed Capacity (MW) Unit UHE Coaracy Nunes Complexo de Tucuruí UHE Samuel UHE Curuá-Una UTE Rio Madeira UTE Santana UTE Rio Branco I UTE Rio Branco II UTE Rio Acre UTE - Santarém UTE Senador Arnon Afonso Farias de Mello Ceded to Boa Vista Energia on 02/10/2010 TOTAL 78,00 8,535,00 216,75 30,30 119,35 177,74 18,65 32,75 45,49 10 4,140,00 92,70 24,00 - 85,99 - 9,350,02 Location (State) Unit UHE Coaracy Nunes Complexo de Tucuruí UHE Samuel UHE Curuá-Una UTE Rio Madeira UTE Santana UTE Rio Branco I UTE Rio Branco II UTE Rio Acre AP PA RO PA RO AP AC AC AC UTE Senador Arnon Afonso Farias de Mello RR Ceded to Boa Vista Energia since feb 10th 2010 UTE – Santarém PA Energy Generated (MWh) 1Q14 2Q14 145,249.77 14,108,384.77 304,096.87 63,782.61 0.00 145,179.09 - 3Q14 168,302.02 12,954,494.23 287,107.32 50,642.72 0.00 143,254.91 - 169,210.70 7,772,229.19 147,362.38 43,716.49 182,490.85 14,468 2,765,213 - - - 14,776,693.11 13,603,801.20 8,317,789.29 Beginning of Operation End of Operation Oct/75 Nov/84 Jul/89 Jul/77 Apr/68 Jan/93 Feb/98 Apr/81 Apr/94 1ª Unit (mac. 2) Dec/90; 2ª Unit (mac. 1) Jun/91; 3ª Unit (mac. 3) Dec/93 Jun/14 Dec/42 Jul/24 Sep/29 Jul/28 Sep/18 May/19 Jul/20 Jul/20 Oct/18 Aug/24 Jun/34 1.2.SPE SPE EAPSA - Energia Águas Da Pedra S.A. AAmapari Energia S.A. Unit Installed Capacity (MW) Energy Guaranteed (MW Avg) Energy Generated (MWh) 1Q14 2Q14 3Q14 UHE Dardanelos 261 154.9 544,046.35 465,653.50 98,142.47 UTE Serra do Navio 23.28 21.00 32,592.85 4,091.86 379.46 68.47 22.8 43,316.00 30,074.00 59,361.00 58.45 21.9 22,572.00 23,435.00 46,517.00 60.12 21.1 37,238.00 30,122.00 55,427.00 Brasventos Miassaba 3 Parque Eólico Miassaba 3 Geradora de Energia S.A Brasventos Eolo Geradora de Parque Eólico Rei dos Ventos 1 Energia S.A. Rei dos Ventos 3 Geradora de Parque Eólico Rei dos Ventos 3 Energia S.A. 99 Marketletter Participation (%) Unit EAPSA - Energia Águas da Pedra S.A. UHE Dardanelos Amapari Energia S.A. UTE Serra do Navio Brasventos Miassaba 3 Geradora de Energia S.A Brasventos Eolo Geradora de Energia S.A. Rei dos Ventos 3 Geradora de Energia S.A. Location (State) Beginning of Operation End of Operation 24.5 MT Aug/11 Jul/42 (35 years) 49.00 AP Jun/08 May/37 24.50 RN May/14 24.50 RN May/14 24.50 RN May/14 1Q14 2Q14 3Q14 209,440,8 22,8 209,440,8 22,8 674,258,9 105,0 674,258,9 105,0 870,257,3 920,4 870,257,3 920,4 Unit 1Q14 2Q14 3Q14 MWh R$ million MWh R$ million MWh R$ million - Aug/45 (35 years) Dec/45 (35 years) Dec/45 (35 years) 2.Electric energy purchased for resale 2.1.Own assets System Unit MWh R$ million MWh R$ million MWh R$ million Eletrobras Others Total 2.2.SPE System Eletrobras Others Total 7,830,21 4,84 7,830,21 4,84 29,645,69 17,72 29,645,69 17,72 3.Energy sold 3.1.Own assets 3.1.1. Energy sold by enterprises not affected by 12,783 law Buyer Eletrobras System Others Total Sale model A B A B A B 1Q14 R$ million MWh 44,95 61,86 461,78 506,62 506,73 568,48 328,537.51 321,160.48 3,452,536.20 4,467,064.95 3,781,073.71 4,788,225.43 2Q14 R$ million MWh 52,89 105,21 528,91 475,91 581,80 581,11 337,605.76 562,303.07 3,561,840.51 4,092,407.48 3,899,446.26 4,654,710.56 3Q14 R$ million 51,09 82,56 611,71 475,20 662,80 557,75 MWh 350,863.75 452,304.27 3,905,936.86 4,047,545.77 4,256,800.61 4,499,850.05 A – Energy sale in regulated enviroment – Revenue not from quotas. B - Through free market agreements or bilateral contracts 100 Marketletter 3.1.2. Energy sold by enterprises affected by 12,783 law – O&M Buyer Sale model 1Q14 R$ million A B A B A B Eletrobras System Others Total 18,19 18,19 2Q14 R$ million MWh MWh 290,130.68 290,130.68 17,76 17,76 3Q14 R$ million MWh 309,242.93 309,242.93 22,34 22,34 348,928,96 348,928,96 A – Energy sale in regulated enviroment – Revenue from quotas. B - Through free market agreements or bilateral contracts 3.2.SPE Buyer Sale model A Eletrobras System Unit 1Q14 R$ Million MWh R$ Million MWh R$ Million MWh R$ Million MWh R$ Million MWh R$ Million MWh B A Others B A Total B 52,70 327,333.00 81,38 134,271.73 52,70 327,333.00 81,38 134,271.73 2Q14 3Q14 50,20 306,799.00 41,86 87,284.48 50,20 306,799.00 41,86 87,284.48 52,90 315,136.37 37,43 140,211.43 52,90 315,136.37 37,43 140,211.43 4.CCEE settlement (Spot and MRE) Unit R$ Million MWh MWaverage R$ Million MWh MWaverage R$ Million MWh MWaverage Sale Purchase Net 1Q14* 893,56 6,018,995,09 2,785,28 204,42 399,401,06 184,82 689,14 5,619,594,03 2,600,46 2Q14 3Q14 336,01 5,334,105,98 2,442,35 323,32 868,804,44 397,8 12,69 4,465,301,54 2,044,55 228,64 1,142,108,64 517,26 866,07 1,754,864,33 794,78 -637,43 -612,755,69 -277,52 (*) changed in order of the sale made to CCEE and the liquidation CCEE – (Spot and MRE), that previously considered amounts forecasted for March 5.Fuel for production of electric energy Type Unit litre R$ Million Diesel oil 1Q14 40,244,000 98,597,627.50 2Q14 39,932,000 98,717,873.60 3Q14 51,706,000 131,026,436.90 6.Losses in generation - % 1Q14 2Q14 3Q14 0.07 0.88 1.06 101 Marketletter 7.Average price– R$/MWh 7.1.Own assets – enterprises not affected by 12,783 law 1Q14(*) 2Q14 3Q14 125.47 135.94 139.39 (*) changed in order to the sale made to CGTEE and the liquidation CCEE – (Spot and MRE) that previously considered amounts forecasted for March 7.1.1 Own Assets – enterprises renewed in terms of the 12,783 law – O&M 1Q14 2Q14 3Q14 62.68 57.44 64.04 (*) changed in order to the sale made to CGTEE and the liquidation CCEE – (Spot and MRE) that previously considered amounts forecasted for March 7.2.SPE SPE EAPSA Amapari Miassaba 3 Eolo Rei dos Ventos 1Q14 2Q14 3Q14 160.48 517.97 603.77 677.83 620.33 163.68 2,506.67 383.87 372.35 377.56 168.10 24,846.96 199.48 200.40 200.79 8.Extension of transmission lines - Km 8.1.Own assets 8.1.1.Transmission line 8.1.1.1. Transmission Lines – enterprises not affected by 12,783 law From - To Extension (km) Isolated System Isolated System Total Interconnected System São Luiz II - São Luiz III Ribeiro Gonçalves - Balsas Porto Velho - Abunã - C2 Abunã - Rio Branco - C2 Lechuga/Jorge Teixeira – C1 Lechuga/Jorge Teixeira – C2 35.94 95.00 188.00 302.00 29.54 29.54 Sub-Total 230 kV Interconnected System Total Isolated System + Interconnected 680.02 680.02 680.02 Tension (kV) Beginning of Operation End of Concession May/10 Dec/11 Feb/14 Jan/14 Feb/14 Feb/14 Mar/38 Jan/39 Nov/39 Nov/39 Jul/40 Jul/40 0.00 0.00 230 230 230 230 230 230 102 Marketletter 8.1.1.2. Transmission Line – enterpises renewd in terms of the 12,783 law – O&M From -To Isolated System Boa Vista- Santa Elena Sub-Total 230 kV Coaracy Nunes - Santana - C1 Coaracy Nunes - Santana - C2 Santana - Portuária Coaracy Nunes - Tartarugalzinho Sub-Total 138 kV Santana - Macapá II Santana - Equatorial Tartarugalzinho - Calçoene Tartarugalzinho - Amapá Santana - Santa Rita Equatorial - Santa Rita Sub-Total 69 kV Isolated System Total Interconnected System Colinas - Miracema Imperatriz - Colinas Imperatriz – Marabá - C1 Imperatriz – Marabá - C2 Tucuruí – Marabá – C1 Tucuruí – Marabá – C2 Tucuruí - Vila do Conde Tucuruí (Usina) - Tucuruí (Se) Pres. Dutra - Boa Esparança Imperatriz - Pres. Dutra - C1 Imperatriz - Pres. Dutra - C2 Miranda II - S.Antonio dos Lopes S.Antonio dos Lopes - Pres. Dutra Miranda II - Pres. Dutra – C2 São Luiz II - Miranda II – C1 São Luiz II - Miranda II – C2 Sub-Total 500 kV Altamira - Rurópolis Guamá - Utinga - C1 Guamá - Utinga - C2 Tucuruí - Altamira Utinga - Castanhal Castanhal - Santa Maria Vila do Conde - Guamá - C1 Vila do Conde - Guamá - C2 Marabá - Carajás Carajás – Integradora - C1 Carajás – Integradora - C2 Carajás – Integradora - C3 Imperatriz - Porto Franco São Luiz II - Miranda II São Luiz II - São Luiz I - C1 São Luiz II - São Luiz I – C2 Miranda II - Peritoró Pres. Dutra - Peritoró Peritoró - Coelho Neto Coelho Neto - Teresina São Luiz II - UTE São Luiz Barra Peixe – Rondonópolis – C1 Rondonópolis - Coxipó - C1 Rondonópolis - Coxipó - C2 Coxipó - Nobres Nobres – Nova Mutum - C1 Nova Mutum – Lucas do Rio Verde - C1 Lucas do rio Verde - Sorriso C-1 Sinop - Sorriso C-1 Barra Peixe – Rondonópolis – C2 Extension (km) Tension (kV) Beginning of Operation End of Concession 190.20 190.20 108.00 109.00 4.00 87.00 308.00 20.00 13.00 130.00 17.00 12.60 5.09 197.69 695.89 230 Jun/01 Dec/42 138 138 138 138 Oct/75 Feb/05 Apr/96 Jun/00 Dec/42 Dec/42 Dec/42 Dec/42 69 69 69 69 69 69 Nov/96 Aug/00 Dec/01 Feb/02 Dec/07 Sep/08 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 173.97 342.60 181.09 181.82 222.14 221.70 327.10 10.71 205.39 386.60 385.30 142.60 52.90 195.80 106.80 106.80 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 Mar/99 Mar/99 Apr/81 Mar/88 Oct/81 Feb/88 Dec/81 Nov/84 to May/05 Jan/00 Oct/82 Jan/00 nov/10 nov/10 mar/86 jul/84 mar/86 nov/10 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Jul/24 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Oct/88 Dec/81 Dec/81 Jun/98 Dec/94 Dec/94 Apr/81 Dec/82 Oct/04 Aug/08 Aug/13 Aug/13 Oct/94 Nov/02 Jan/83 Sep/88 Dec/02 Mar/03 Jul/06 Sep/06 Jan/82 Oct/97 Sep/88 Jul/84 Sep/96 Sep/96 Sep/96 Sep/96 Sep/96 Mar/08 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 3,243.32 330.02 19.40 19.40 317.60 69.27 25.04 49.30 49.30 145.00 83.00 85.35 85.35 110.10 105.30 18.60 19.00 94.20 115.00 223.00 127.10 0.05 217.00 187.80 187.80 112.41 104.57 93.80 52.50 86.43 216.79 103 Marketletter From -To Rio Verde (C. Magalhães) – Rondonópolis Jauru - Coxipó - C1 Jauru - Coxipó - C2 Abunã - Rio Branco Ariquemes - Jarú Jarú - Ji-Paraná Samuel - Ariquemes Samuel - Porto Velho – C1 Samuel - Porto Velho – C2 Samuel (Usina) - Samuel (SE) Porto Velho - Abunã Ji-Paraná - Pimenta Bueno Pimenta Bueno – Vilhena Sub-Total 230 kV Tucuruí-Vila - Cametá Curuá-Uma - Tapajós-Celpa Coxipó - São Tadeu São Tadeu - Jaciara Jaciara - Rondonopolis-Cemat Couto Magalhães - Rondonopolis-Cemat Sub-Total 138 kV Tucuruí - Tucuruí Vila Tucuruí (Usina) - Tucuruí (SE) Tucuruí (Usina) - Tucuruí (SE) Sub-Total 69 kV Interconnected System Total Total General Total Extension (km) Tension (kV) Beginning of Operation End of Concession 177.83 230 Jul/83 Dec/42 230 230 230 230 230 230 230 230 230 230 230 230 Jun/03 Jun/03 Nov/02 Sep/94 Sep/94 Aug/94 Jul/89 Jul/89 Jul/89 May/02 Jun/08 Oct/08 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Sep/29 Dec/42 Dec/42 Dec/42 138 138 138 138 138 138 Aug/98 Jan/06 Jul/81 Jul/81 Jul/81 Apr/81 Dec/42 Jul/28 Dec/42 Dec/42 Dec/42 Dec/42 69 69 69 Jul/97 Jan/80 Dec/85 Dec/42 Dec/42 Dec/42 366.00 366.00 302.00 83.82 80.69 151.60 40.55 40.55 2.85 188.00 117.80 160.20 5,427.37 214.21 68.80 44.17 77.92 70.00 176.00 651.10 2.30 1.40 1.40 5.10 9,326.89 10,022.78 10,702.80 8.1.2.Substation 8.1.2.1. Substation – enterprises not affected by 12,783 law Substation Ribeiro Gonçalves Balsas São Luis III Miranda II (ATR1) Lucas do Rio Verde (Só Autotrafo) Nobres Total SPE Energy transmitter station S.A. (Shared transferred to Eletrobrás Eletronorte- Ordinance ANEEL 3532, of 11/23/2010) Transformation Capacity (MVA) 350.00 100.00 300.30 450.00 75.00 200.00 1,475.30 Substation Converter Station 01 CA/CC, 500/±600 KV and to Inverter Station 01 CC/CA, ±600/500 kV Location Beginning of Operation End of Operation Maranhão Maranhão Maranhão Maranhão Mato Grosso Mato Grosso Dec/11 Dec/11 May/10 Nov/10 Apr/13 Sep/13 Jan/39 Jan/39 Mar/38 Jan/39 Jun/41 Dec/41 Transformation Capacity (MVA) Participation (%) Beginning of Operation 7,295.20 100.00 Mar/13 End of Operation Feb/39 104 Marketletter 8.1.2.2. Substation – enterprises renewed in terms of 12,783 law – O&M Substation Transformation Capacity (MVA) Altamira Cametá Carajás Guamá Marabá Rurópolis Santa Maria Tucuruí Transamazônica Tucuruí-Vila Utinga Vila do Conde São Luis I São Luis II Miranda II Peritoró Presidente Dutra Coelho Neto Imperatriz Porto Franco Colinas Miracema Barra do peixe Couto Magalhães Coxipó Jauru Nova Mutum Rondonopolis Sinop Sorriso Epitaciolândia Sena Madureira Rio Branco Ariquemes Ji-Paraná Porto Velho Abunã Samuel Pimenta Bueno Vilhena Jaru Coaracy Nunes Portuária Amapá Tartarugalzinho Calçoene Santana Santa Rita Equatorial Macapá II Boa Vista Total 120.30 23.55 0.30 454.00 1,063.80 200.60 500.15 619.00 60.30 58.44 602.00 3,549.40 401.73 2,829.00 500.60 300.11 721.03 130.00 1,842.17 266.50 1.50 362.50 150.60 15.11 571.20 600.45 60.60 200.90 356.00 60.60 22.10 18.75 422.95 120.30 380.60 525.60 110.60 0.30 110.60 120.60 30.15 40.08 20.05 10.08 40.22 10.08 120.45 80.03 79.95 53.43 201.65 19,140.99 General Total 20,616.29 Location Beginning of Operation End of Operation Pará Pará Pará Pará Pará Pará Pará Pará Pará Pará Pará Pará Maranhão Maranhão Maranhão Maranhão Maranhão Maranhão Maranhão Maranhão Tocantins Tocantins Mato Grosso Mato Grosso Mato Grosso Mato Grosso Mato Grosso Mato Grosso Mato Grosso Mato Grosso Acre Acre Acre Rondônia Rondônia Rondônia Rondônia Rondônia Rondônia Rondônia Rondônia Amapá Amapá Amapá Amapá Amapá Amapá Amapá Amapá Amapá Roraima Jun/98 Aug/98 Nov/06 Dec/81 Oct/81 Dec/98 Sep/95 Oct/81 Dec/98 Jun/99 Dec/81 Dec/81 Dec/82 Dec/82 Jun/98 Dec/82 Dec/82 Jan/00 Dec/82 Feb/94 Mar/99 Mar/99 Nov/93 Oct/81 Jul/87 Jun/03 Sep/96 Jul/83 Sep/96 Sep/96 Mar/08 Oct/08 Nov/12 Aug/94 Sep/94 Jul/89 May/02 jul/89 Jun/08 Oct/08 Sep/97 Nov/75 Apr/96 Dec/01 Jun/00 May/02 Oct/75 Dec/07 Aug/00 Nov/96 Jul/01 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Jan/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 105 Marketletter 8.2.SPE 8.2.1.Transmission Lines From - To Participation (%) Coxipó-Cuiabá-Rondonópolis (MT), SE Seccionadora Cuiabá 49.00 193 230 Aug/05 Feb/34 37.00 695 500 May/08 Apr/36 49.71 402 230 Sep/09 Mar/38 SPE Extension (km) Tension (kV) Beginning of Operation End of Operation AETE - Amazônia Eletronorte Transmissora de Energia S.A. INTESA - Integração Transmissora de Energia S.A. BRASNORTE Transmissora de Energia S.A. Transmissora Matogrossense de Energia S.A. – TME Colinas-Miracema-GurupiPeixe Nova-Serra da Mesa 2 (TO / GO) Jauru - Juba – C2 (MT) e Maggi - Nova Mutum (MT), SE Juba e SE Maggi - 230/138 kV TL Jauru / Cuiabá, em 230 kV, Mato Grosso 49.00 348 500 Nov/11 Nov/39 Manaus Transmissora de Energia S.A. Oriximiná - Silves - Lechuga (AM), SE Silves (exItacoatiara) e SE Lechuga (ex-Cariri) 30.00 559 500 Mar/13 Oct/38 8.2.2.Substation – N/A 9.Transmission losses - % 1Q14 2Q14 3Q14 3.0 3.0 3.0 10.Main investments of parent company – R$ million Project Generation HPU Coaracy 2nd stage Generation system Maintenance HPU Curuá-Una-Extension Extension of Generation System Transmission TL Implementation Rio Branco – Cruzeiro do Sul Reinforcement of the Isolated System TS North/Northeast-Maranhão Transmission system Maintenance Reinforcement of interconnected system Others Preservation and conservation Infrastructure Infrastructure Infrastructure Headquarters Total 1Q14 2Q14 3Q14 2014 budget 2,629,923 2,627,370 2,553 57,332,076 24,780,112 1,170,468 49,692 1,770,738 29,561,066 1,578,314 1,074,447 849 57,018 446,000 61,540,313 3,429,508 362,617 2,814,360 252,531 58,454,857 6,072 2,883,119 360,577 4,095,528 51,109,562 3,993,509 2,897,141 83,658 566,710 446,000 65,877,875 2,132,717 174,288 1,748,618 209,811 85,998,469 5,989,659 5,653,184 1,835,527 11,275,266 61,244,833 4,522,334 2,637,377 20,180 1,864,777 92,653,520 64,171,782 5,000,000 24,038,182 1,500,000 33,633,600 409,199,023 40,061,000 16,410,000 5,000,000 35,000,000 312,728,023 56,690,195 38,590,195 1,050,000 1,050,000 15,000,000 1,000,000 530,061,000 106 Marketletter 11.New investments 11.1.Generation 11.1.1.Own assets – N/A 11.1.2.SPE Location (State) Installed Capacity (MW) Assured Energy (MW) UHE Belo Monte PA 11,233 4,571 Nov/15 Aug/11 Aug/45 UHE Sinop MT 400 239.8 Mar/17 Dec/13 Feb/49 SPE Unit Norte Energia S.A. Cia. Energética Sinop S.A. Beginning Beginning of End of of Construction Concession Operation 11.1.2.1. SPE Investiment (R$ million) Total Up to 3Q14 SPE Unit Norte Energia S.A. UHE Belo Monte Working Schedule (%) Participation (%) Partners 14,983,60 58.6 19.98 ELETROBRAS / CHESF / PRIVADOS 79,6 10.4 24.50 CHESF / ALUPAR 29,375.00 Working final basis 25,885.00 Basis: April/10 Cia. Energética Sinop S.A. UHE Sinop 1,804.81 11.2.Transmission 11.2.1.Own assets 11.2.1.1.Transmission lines From - To Jorge Teixeira – Lechuga (AM) Jorge Teixeira – Lechuga (AM) SE Lechuga (leilão 02/12(*) Total of investment (R$ million) Extension of lines (Km) Tension (kV) Beginning of Operation End of Concession Total Up to 3Q14 44,2 43,6 30 230 Feb/14 Jul/40 58,0 47,2 30 230 May/14(*) May/42 (*) the TL is concluded and available to begin into Operation since May/14. But, the forecasted of conclusuion of substations for Dec/14, when the group might be energized, entering into Operation. 11.2.1.2.Substations SE SE Rio Branco I – AT2 230/138/13,8KV SE Nobres – AT1/AT2 230/138kV SE Sinop - AT3 230/138kV SE Miracema TR2 500/138/13,8kV Investiment (R$ million) Total Up to 3Q14 10,5 (basis dec/2010) 10,1 55 AC Sep/13 Sep/43 16,9 (basis sep/2011) 16,5 100 MT Oct/13 Oct/41 11,9 100 MT Sep/13 Sep/43 MA Oct/13 Jun/43 11,9 (basis jun/11) 25,6 (basis dec/10) 24,3 180 Location (State) Beginning of Operation Transformation capacity (MVA) End of Concession 107 Marketletter 11.2.2.SPE 11.2.2.1.Transmission lines SPE Norte Brasil Transmissor a de Energia S.A Linha Verde Transmissor a de Energia S.A. Transnorte Energia S.A. Belo Monte Transmissor a de Energia S.A. From-To Coletora Porto Velho (RO) – Araraquara (SP) Porto Velho (RO) – Samuel (RO) – Ariquemes (RO) - JiParaná (RO) Pimenta Bueno (RO) – Vilhena (RO) – Jauru (MT) Eng. Lechuga (AM) Equador (RR) e Equador (RR) - Boa Vista (RR), circuito duplo e SEs Equador (RR) Boa Vista (RR) Estação Conversora CA/CC, ±800 kV, 4.000 MW, junto a SE 500 kV Xingu; Estação Conversora CA/CC, ±800 kV, 3.850 MW, junto a SE 500 kV Estreito; e Linha de Transmissão em Corrente Contínua de ±800 kV Xingu Estreito. Participation (%) Investiment (R$ million) Up to Total 3Q14 24.50 2,770,20 2,656,90 49.00 658,40 526,36 Extension of lines (Km) Tension (kV) Beginning of Operation End of Concession 2,375 ±600 Sep/14 Feb/39 987 230 Dec/14 Nov/39 TL: Sep-16 49.00 1,110,00 216,82 715 500 Jan/42 CE: Dec-14 24.50 5,049,00 - 2,092 ±800 Feb/18 Jun/44 108 Marketletter 11.2.2.2.Substations SE Participation (%) Investiment (R$ million) Transformation Capacity (MVA) Location SE Luziânia e SE Niquelândia 49.0 39.3 255 Luziânia (GO)/ Niquelândia (GO) SPE Luziânia Niquelândia Transmissora S.A. Beginning End of of Concession Operation Aug/15 May/42 12. Loans and financing – R$ million Local currency – LC Creditor Eletrobras ECF-2092/01 Eletrobras ECF-2272/02 Eletrobras ECF-2273/02 Eletrobras ECF-2710/08 Eletrobras ECF-2757/09 Eletrobras ECF-2758/08 Eletrobras ECF-2794/09 Eletrobras ECF-2818/10 Eletrobras ECF-2934/11 Eletrobras ECF-3038/13 BNDES-03.2.782.3.1 BNDES-09.02.1355.1 BNDES-10.20.2677 Banco do Brasil Banco do Nordeste Banco do Brasil Banco da Amazônia BNDES-11.2.13181.1 BNDES-11.2.0281.-ETE BANCO DA AMAZÔNIA-ETE BASA-043.11/0029-2DEBENDURES BNDES-13.2.0672.1 BNDES-13.2.0673.1 BNDES-13.2.0679.1 Balance 03.31.14 Balance 06.30.14 Balance 09.30.14 207.97 317.37 71.20 7.95 127.72 25.08 1,531.55 69.90 383.89 72.87 255.06 30.24 10.43 7.72 67.64 6.54 24.26 136.62 496.32 242.10 202.63 298.33 66.12 7.00 125.40 24.62 1,520.72 68.69 382.47 72.90 229.64 29.28 10.19 7.20 66.53 6.55 23.72 134.00 490.98 222.99 197.30 279.29 61.03 6.04 122.15 23.98 1,474.04 66.94 377.43 72.87 204.17 28.34 9.94 6.70 65.58 6.55 23.33 131.41 482.56 244.77 12/30/2023 05/30/2018 09/30/2017 04/30/2016 06/30/2021 06/30/2021 12/30/2029 10/30/2021 01/30/2023 07/30/2020 09/15/2016 11/15/2024 11/15/2024 01/01/2018 06/03/2031 12/01/2026 01/01/2029 03/15/2027 11/15/2028 07/10/2031 - 222.99 226.53 10/15/2031 TJLP+1.5% py - - 17.21 14.98 4.45 10/15/2028 08/15/2028 03/15/2028 TJLP+3.05 and 3.05% py TJLP+3.05 and 3.05% py TJPL+3.05 and 3.05% py Due Date Index RGR+8.42% py RGR+7% py RGR+7% py RGR+7% py IPCA+7%py IPCA+7% py IPCA+7% py IPCA+7% py IPCA+7% py SELIC TJLP+3.5% py TJLP+2.5% py TJLP+2.5% py 8.5 % py 8.5% py 8.5% py 8.5% py TJLP+2.12 and 1.72% py TJLP+2.12% py 8.5% py Foreign currency – FC Creditor Eletrobras ECR-257/97– BID Eletrobras ECR-259/98 – CAF Eletrobras ECR – 260/98 – Eximbank Credit National 121/0118 Credit National 121/0122 D.M.L.P – Tesouro Nacional Balance 03.31.14 350.65 18.07 144.98 0.00 0.04 0.47 Balance 06.30.14 319.61 17.77 135.79 0.00 0.03 * Balance 09.30.14 363.51 13.05 141.09 0.00 0.03 * Due Date 04/06/2025 08/04/2015 04/06/2025 12/31/2016 12/31/2016 04/15/2014 Index US$+6.83% py Libor+3.58% py Yen+3.5% py EUR+3.5% py EUR+3.5% py US$+8% py * The contract was ended on 04.30.2014. 109 Marketletter 13.Contracts 13.1.Loans and financing – R$ million 13.1.1.Parent company Loans and financing By activity Generation Transmission Energy tradings By creditor Eletrobras Others 2014 2015 2016 2017 2018 After 2018 Total (LC + FC) 73.03 89.46 0.08 299.53 182.88 12.96 286.18 180.33 218.02 174.62 178.17 159.36 1,582.46 1.228.21 2,637.39 2,014.86 13.04 81.91 80.66 293.89 201.48 305.53 160.98 305.21 87.43 251.93 85.60 1,930.52 880.15 3,168.99 1,496.30 13.1.2.SPE Loans and financing By activity Generation Transmission Energy tradings By creditor BNDES Others Total 2014 2015 2016 2017 2018 After 2018 15,633,099,574.34 2,998,377,766.74 16,698,705,908.62 2,780,625,746.14 17,843,115,587.53 2,351,166,010.07 - - - 11,267,936,288.34 7,363,541,052.75 18,631,477,341.09 11,779,547,029.24 7,699,784,625.52 19,479,331,654.76 12,008,826,667.61 8,185,454,929.99 20,194,281,597.60 - - - 14.Number of employees (including requested employees from other Eletrobras companies and excluding employees assigned to other Eletrobras companies) 14.1.By tenure Generation Composition of employees by tenure (Years) Up to 5 6 to 10 11 to15 16 to 20 21 to 25 beyond 25 Total 1Q14 21 236 18 18 121 186 600 2Q14 18 239 18 17 121 187 600 3Q14 19 240 17 18 117 188 599 110 Marketletter Transmission Composition of employees by tenure (Years) Up to 5 6 to 10 11 to15 16 to 20 21 to 25 beyond 25 Total 1Q14 2Q14 3Q14 72 327 57 42 159 446 1,103 42 356 57 42 158 447 1,102 37 358 60 41 157 444 1,097 1Q14 2Q14 3Q14 64 516 8 16 301 462 1,367 38 527 9 15 298 462 1,349 Administration Composition of employees by tenure (Years) Up to 5 6 to 10 11 to15 16 to 20 21 to 25 beyond 25 Total 77 503 8 16 304 458 1,366 14.2.By region State 1Q14 Acre Amazonas Amapá Maranhão Mato Grosso Pará Rondônia Roraima São Paulo Tocantins Tucuruí Distrito Federal Total Number of employees 2Q14 133 11 170 348 197 454 237 48 37 54 278 1,102 3,069 133 12 170 348 198 450 237 48 36 54 279 1,104 3,069 3Q14 134 14 169 347 199 449 236 48 36 54 277 1,082 3,045 14.3.By departments Department 1Q14 Field Administrative Total Number of employees 2Q14 1,031 2,493 3,524 1,702 1,367 3,069 3Q14 1,696 1,349 3,045 15.Complementary work force Operational 1Q14 2Q14 3Q14 380 399 394 16.Turn-over - % 1Q14 2Q14 3Q14 0.23 0.05 0.29 111 Balance Sheet (R$ thousand) Financial Statements for Consolidation Purposes Assets Current Assets Availabilities Clients (Consumers and Resellers) Loans and Financing - Principal Marketable securities Deferred Fiscal Assets (Taxes and Contribution) Income tax and Social Contribution Reimbursement Right - CCC (12,111 Law) Stored Material Storage of Nuclear fuel Financial Asset Other Non-Current Assets Clients (Consumers and Resellers) Loans and Financing - Principal Marketable securities Deferred Fiscal Assets (taxes and Contributions) Income tax and Social Contribution Reimbursement Right – CCC (12,111 law) Linked deposits Stored Nuclear fuel Other Advance for equity participation Investment Fixed Asset Intangible Non-Current Assets Total Total Assets 09.30.14 09.30.13 5,125 200,295 33,323 17,828 9,089 138,816 340,319 71,623 816,418 29,228 156,886 305,559 42,758 93,514 343,730 59,766 1,031,441 45,292 496,683 334,536 876,511 10,139,054 53,128 11,068,693 11,885,111 42,432 430,072 285,459 757,963 9,103,682 45,450 9,907,095 10,938,536 112 Liabilities and Stockholders’ Equity Current Liabilities Suppliers Loans and financing - Principal Loans and financing - Charges Taxes and social contributions Income tax and Social Contribution Advance from clients (Energy sell in advance) Remuneration to Shareholders (dividends to pay) Estimated Obligations Provision for contingencies Post-employment benefits (Complementary Pension Fund) Onerous Contracts Sector charges (regulatory taxes) Incentive to personnel retirement Others Non-Current Liabilities Suppliers Loans and Financing - Principal Taxes and Social Contribution Income tax and Social Contribution Advance from Clients Estimated Obligations Provision for Contingencies Provision for onerous contaract Post-Employment Benefit (Complementary Pension Fund) Leasing Sectorial Charges (regulatory taxes) Demobilization of asset obligation Advance for future capital increase Others Stockholders’ Equity Social capital Capital Reserves Profit Reserves Additional Proposed Dividend Accrued profit/losses Other comprehensive income Non-controlling shareholders participation Stockholders’ Equity Total Total Liabilities and Stockholders’ Equity 09.30.14 09.30.13 140,748 830,896 10,721 53,044 327,151 11,789 55,473 78,800 1,508,622 152,308 56,843 4,552 53,457 119,697 8,376 2,502 16,560 414,295 3,338,348 79,166 145,531 48,286 1,278,809 100,930 4,991,070 2,709,410 72,440 233,573 1,025,185 75,857 4,116,465 6,607,258 -1,200,914 -20,925 5,385,419 11,885,111 6,607,258 -22,854 -176,628 6,407,776 10,938,536 113 Statement of Income (R$ thousand) Operating Revenue Supply Other Operating Revenue Deductions to the Revenue Net Operating Revenue . Operating Costs Charges over the use of electric grid Fuel for electric energy production - CCC Operating expenses Personnel, Material and Third-part related Service Depreciation and Amortization Donations and Contributions Provisions Realignment Headcount Plan Others Operating Cost and Expenses Operating Result before Financial Result Financial result Income before Income tax and Social Contribution . Current Income tax and Social contribution Deferred Income tax and Social Contribution Net income for the period 09.30.14 09.30.13 1,618,404 220 -196,596 1,422,028 1,520,605 -134,921 1,385,684 -47,063 -220,505 -43,269 -211,363 -757,509 -271,155 -61,747 -305,404 -56,000 -1,719,383 -297,355 -119,031 -416,386 -665,491 -217,318 -50,109 -52,798 -1,240,348 145,336 -52,543 92,793 -26,001 -442,387 -12,250 -33,405 47,138 114 Cash Flow (R$ thousand) Cash Flow 09.30.2014 09.30.2013 OPERATING ACTIVITIES Profit/Loss before income tax and social contribution Depreciation and amortization Net monetary and currency variations Financial charges Equity Equivalency Result Provision for uncovered liability Provision for credits of questionable liquidation Provision for contingencies Provision for staff realignment Impairment Global reversal reserve charges Adjustment to present value / market value Minority Participation in the Results Charges on shareholders funds Revenue of financing assets - IRR Derivative financial instruments Others Variation in operating assets / liabilities Cash generated in operating activities -416,386 271,155 42,518 25,064 50,397 305,404 57,939 263,795 -397,387 202,499 92,793 217,318 11,283 31,236 5,069 33,694 285,647 -316,051 360,989 Financial charges paid Payment of global reversal reserve charges Financial charges received Remuneration received from equity participation Financial asset revenue by RAP Receiving compensation for financial asset Payment of income tax and social contribution Payment of pension fund Lawsuits payment Legal deposits Net cash operating activities -49,576 -32,091 -5,749 115,083 -44,954 -19,426 -2,918 293,691 FINANCING ACTIVITIES Loans and financing obtained Loans and financing payable – principal Payment of Shareholders remuneration Payment on refinancing of taxes and contributions - Principal Receipt of Advance for future Capital Increase Others Net financing activities 860,863 -37,767 -10,092 813,004 299,969 -64,238 235,731 -910,511 -12,612 -6,756 -929,879 -824,438 -12,155 205,045 -631,548 -1,792 -102,126 6,917 5,125 -1,792 131,354 29,228 -102,126 INVESTMENT ACTIVITIES Acquisition of fixed asset Acquisition of intangible asset Acquisition of Concession asset Advance for future capital increase Acquisition of equity participation Others Net cash investment activities Increase (decrease) in cash and cash equivalent Cash and cash equivalent – beginning of period – 12/31/13 Cash and cash equivalent – end of period – 03/31/14 115 Analysis of the result 3Q14 x 2Q14 The Company presented a profit in 3Q14 110.4% higher than the registered in the previous quarter, from a loss of R$ (166.2) million in 2Q14 to a profit of R$ 17.3 million in 3Q14, mainly due the factors described below. Operating Revenue The electric energy supply decreased by 4.2%, from R$ 541.9 million in 2Q14 to R$ 519.4 million in 3Q14, mainly due to the negative adjustment of forecast revenues complementary RAG (Annual Revenue Generation). Operating Expenses The personnel expenses, materials and third-part related services had increased 22%, from R$ (255.3) million in 2Q14 to R$ (311.6) million in 3Q14, primarily due to expenses related to the execution of the Early Retirement Program. The spending in Early Retirement Program (PID) showed an increase of 207.1% from an expense of R$ (49.5) million in 2Q14, to an income of R$ 53 million in 3Q14, mainly due to the reversal of provision occurred as the retirements started in August 2014. The fuel for electricity production decreased by 15.9% from R$ (73.5) million, in 2Q14, to R$ (61.9) million, in 3Q14, mainly due to the increase in fuel consumption in 3Q14. The operational provisions decreased by 118.1%, from a provision of R$ (67.5) million in 2Q14, for a reversal of R$ 12.2 million in 3Q14, mainly due to the reversal of a provision of the PID of R$ 48 million, by the exit of employees in August and September. Financial Result The net foreign currency variations decreased by 112%, from an expense of R$ (18.7) million in 2Q14, a recipe for R$ 2.2 million in 3Q14, mainly due to currency fluctuations on debt with suppliers from abroad in 3Q14. The other financial income decreased by 443.5%, from an expense of R$ (8.5) million in 2Q14 to a revenue of R$ 29.3 million in 3Q14, mainly due to the compensation fund decommissioning the 3Q14, due to sharp movements in the dollar during the quarter. 116 Market Data 1. Generation Assets and Energy generated Unit Installed Capacity (MW) Angra I Angra II Total Guaranteed energy (MW Average) 640 1,350 1,990 1Q14 509,8 1,204.7 1,714.5 Energy generated (MWh) 2Q14 1,299,694.18 2,939,049.94 4,238,744.12 842,821.64 2,926,158.78 3,768,980.42 3Q14 1,427,505.52 1,586,080.78 3,013,586.30 Unit Location (State) Beginning of Operation End of Concession = Useful Economic Life Angra I Angra II Rio de Janeiro Rio de Janeiro 01/1985 09/2000 12/2024 08/2039 2. Electric energy purchased for resale - N/A 3. Energy sold Buyer Eletrobras System Others Total Sale model 1Q14 R$ million A B A B A B MWh 15,8 542,3 109,906,136 3,765,422,290 558,1 3,875,328,426 2Q14 R$ million MWh 3Q14 R$ million MWh 15,4 526,6 -97,531,195 3,341,452,522 504,6 2,667,959,623 542,0 3,438,983,717 519,3 2,745,832,73 14,7 77,873,107 A - Through auction B - Through free market agreements or bilateral contracts 4. CCEE settlement (Spot and MRE) – N/A 5. Fuel used to produce electricity 1Q14 Type Kg Uranium 72,101 2Q14 R$ Million 85,1 Kg 59,990 R$ Million 73,5 3Q14 R$ Million Kg 56,551 61,9 6. Losses in generation - % 1Q14 2Q14 3Q14 2.11 2.38 2.12 7. Average price– R$/MWh 1Q14 2Q14 3Q14 143.76 157.69 189.12 8. Extension of transmission lines - Km – N/A 9. Transmission losses - % - N/A 117 10.Main investments– R$ million Project 1Q14 Generation Angra 1 and 2 (Maintanence) Angra 3 Others Total 2Q14 29,735.3 155,198.4 9,602.7 194,536.4 3Q14 36,269.5 532,649.9 2,355.7 571,275.1 2014 budget 58,567.0 279,737.9 2,291.5 340,596.4 405,743.7 2,110,817.6 45,253.6 2,561,814.9 11. New investments Generation Location (State) Unit Total of investment (R$ million) RJ - Angra dos Reis Angra 3 Investment up to 3Q14 (R$ million) 14,882 ** 5,039.6 Installed capacity (MW) 1,405 Guaranteed energy (MW) Beginning of Operation 1,214,2 Beginning of Construction Dec/18 End of Concession Jul/08 Mar/58* *There is still no license of Operation for Angra 3. It considers 40 years. ** Direct costs. 12. Loans and financing – R$ million Local currency – LC Creditor Balance 03.31.14 Eletrobras BNDES CEF 1,083.6 2,118.8 264.0 Balance 06.30.14 Balance 09.30.14 Date Due Index 1,062.2 2,260.6 760.8 1,048.0 2,358.3 773.6 01.30.2038 06.15.2036 12.27.2014 5% py/UFIR 1.72% py + TJLP 6.7% py Foreign currency – FC – N/A 13.Contracts 13.1.Loans and financing – R$ million Loans and financing By activity Generation By creditor Eletrobras BNDES CEF 2014 789,495 789,495 789,495 9,442 6,425 773,628 2015 2016 61,371 61,371 61,371 61,371 - 79,879 79,879 79,879 47,280 32,599 - 2017 102,628 102,628 102,628 34,161 68,467 - 2018 134,465 134,465 134,465 61,398 73,067 - After 2018 3,012,127 3,012,127 3,012,127 834,395 2,177,732 - Total 4,179,965 4,179,965 4,179,965 1,048,047 2,358,290 773,628 118 14.Number of employees (including requested employees from other Eletrobras companies/ excluding employees assigned to other Eletrobras companies) 14.1.By tenure Generation Tenure in years Up to 5 6 to 10 11 to15 16 to 20 21 to 25 beyond 25 Total 1Q14 2Q14 3Q14 397 345 304 166 126 504 1,842 416 351 306 166 126 501 1,866 412 330 337 165 117 449 1,810 1Q14 2Q14 3Q14 149 139 60 11 79 282 720 147 136 66 11 65 245 670 Administration Tenure in years Up to 5 6 to 10 11 to15 16 to 20 21 to 25 beyond 25 Total 148 137 59 10 79 280 713 14.2.By region State Rio de Janeiro Federal District Number of employees 2Q14 1Q14 2,550 05 3Q14 2,581 05 2,475 05 14.3.By departments Departments Field Administrative 1Q14 Number of employees 2Q14 3Q14 1,842 713 1,866 720 1,810 670 15.Complementary work force – N/A 16.Turn-over - % 1Q14 2Q14 3Q14 0.0043 0.0081 0.0284 119 Marketletter Balance Sheet (R$ thousand) Financial Statements for Consolidation Purposes Assets Current Assets Availabilities Clients (Consumers and resellers) Financing and Loans - Principal Marketable Securities Dividends to Receive (Remuneration from equity participations) Fiscal Assets Deferred (Taxes and Contributions) Income Tax and Social Contribution Linked Deposits Stored Material Financial Asset Receivable 12,783/13 Law Others Total Current Assets . Non-Current Assets Clients (Consumers and resellers) Financing and Loans - Principal Marketable Securities Fiscal Assets Deferred (Taxes and Contributions) Income Tax and Social Contribution Derivatives Reimbursement Rights – CCC (12,111 law) Linked Deposits Financial Asset – Annual allowed Revenue (transmission) Receivables 12,783/13 Law Others Advances for equity participation INVESTMENTS FIXED INTANGIBLE Non-Current Assets Total Assets Total Consolidated 09.30.14 09.30.13 59,763 161,358 1,359 181,178 7,696 18,027 61,660 24,837 35,482 63,855 431,773 89,742 1,136,730 795,954 238,653 1,324 3,330 75,991 0 65,742 33,739 61,746 391,107 59,693 1,727,279 501,303 4,459 176 28,941 127,079 2,074,963 91,401 389,595 3,217,917 2,613,454 2,367,629 173,737 8,372,737 9,509,467 387,861 1,358 142 291,795 92,078 2,193,825 325,923 7,586 137,601 3,438,169 2,320,317 2,475,186 181,514 8,415,186 10,142,465 120 Marketletter Liabilities and Stockholders’ Equity Consolidated 09.30.14 09.30.13 Current Liabilities Suppliers Loans and financing Taxes and Social Contributions Income tax and Social Contribution Derivatives Advance from consumers (Energy sell in advance) Remuneration to shareholders (dividends to pay) Estimated obligations Provisions for contingencies Post-employment benefit (Supplementary Pension Fund) Onerous Contracts Concessions to pay - UBP Sectorial Charges (regulatories fees) Incentive for personnel retirement Others Total of current Liabilities 50,003 399,909 52,426 154 273,296 99,352 9,465 2,053 38,949 120,157 1,045,764 49,364 387,455 48,062 68,529 102,626 11,733 1,939 32,929 530 177,184 880,351 Non-Current Liabilities Suppliers Loans and financing - principal Taxes and Social Contributions Income tax and Social Contribution Advance from consumers (Energy sell in advance) Estimated obligations Provisions for contingencies Provisions for uncovered liabilities on invested companies Provision for Onerous Contracts Post-employment benefit (Supplementary Pension Fund) Leasing Concessions to pay - UBP Advance for future capital increase Incentive for personnel retirement Others Non-Current Total 2,643,448 53,999 28,296 21,010 56,791 16,343 75,962 23,502 63,976 19,160 3,002,487 2,611,826 82,077 2,121 100,981 727,717 236,447 27,107 607,987 57,458 177 4,453,898 4,295,250 1,072,411 143,367 -63,987 14,175 3,740,410 1,059,172 181,764 -186,577 13,447 Total Stockholders’ Equity 5,461,216 4,808,216 Total Liabilities and Stockholders’ Equity 9,509,467 10,142,465 Stockholders’ Equity Social Capital Capital reserve Profit reserve Additional proposed dividends Accumulated Profit/Losses Others comprehensive Results Non-Controlling shareholders participation 121 Marketletter Statement of Income (R$ thousand) Consolidated 09.30.14 09.30.13 Operating Revenue Generation Supply Supply Short Term Electric Energy 241,745 7,331 192,157 46,583 Transmission O&M Revenue Renewed Lines O&M Revenue Construction Revenue – Transmission Return on Investment - T Others Operationg Revenues 363,735 72,986 28,867 148,331 20,616 325,578 114,725 94,345 67,389 19,023 -95,146 788,465 -82,806 776,994 -33,609 -10,291 -28,867 -35,673 -8,246 -94,345 -336,444 -4,938 -95,115 -4,463 412,250 -24,675 -126,152 -312,269 -5,827 -65,792 -3,315 103,083 -22,828 -445,212 Equity Participation Results Operating Result before Financial result -261,429 400,884 417 332,199 Financial Result Result before Income tax and Social Contribution -52,849 348,035 -58,174 274,025 Current Income tax and Social Contribution Deferred Income tax and Social Contribution Net Profit of the period -13,931 -188,475 145,629 -24,191 -66,257 183,577 Deductions to Revenue Net Operating Revenue Operating Costs Electric Energy purchased for resale Charges over the electric energy network usage Fuel for electric energy production - CCC Construction Cost Operating Expenses Personnel, Material and Third party services Remuneration and Reimbursement Depreciation and Amortization Donations and Contributions Provisions Others Operating Costs and Expenses 122 Marketletter Cash Flow (R$ thousands) Cash Flow Operating Activities Income before income tax, social contributionx Depreciation and amortization . Monetary / Exchange net variation Financial Charges Equity method result Provision for uncovered liability Provision for credits of questionable liquidation Provision for contingencies Provision for realignment of staff plan Provision for impairment . . Charges of reversal global reserve Adjustment to present value / market value (sum to Others item) Minority participation in the result Charges on shareholders funds . Revenue of Financial Asset by IRR Derivatives Others Increase/Decrease in operating assts/liabilities Cash from operating activities 09.30.2014 09.30.2013 348,035 95,115 274,025 65,792 -30,562 108,211 261,429 -56 -4,302 151 -407,893 -12,179 130,468 -417 56 22,011 66,975 -206,055 4,067 19,871 3,612 -148,331 -438,809 -237,846 -430,920 -67,389 -451,101 -26,370 -200,572 -152,307 347 14 626,038 267,699 -21,027 -272 289,572 -187,738 436 9,531 557,089 1,387,347 -31,362 -24,161 1,510,570 Financing Activities Loans and Financing obtained Payment of loans and Financing - Principal Payment to shareholders Payment of refinancing of taxes and social contributions - principal Receiving of future capital increase Others Net cash from financing activities 950 -204,676 -320 -13,975 -8,512 -226,533 345,578 -175,451 -88 -23,725 -8,121 138,193 Investment Activities Fixed Asset Acquisition Intangible Asset Acquisition Concession Asset Acquisition Concession of cash in advance for future capital Increase Acquisition/Contribution of Capital in equity participation Others Net cash from Investment Activities -78,834 -909 -28,867 -303,134 -365,243 -776,987 -124,257 -449 -94,345 -975,863 131,117 -1,063,797 -713,948 584,966 773,711 59,763 -713,948 210,988 795,954 584,966 Payment of financing charges Payment of charges of reversal global reserve Financial charges receiving Receiving of investment remuneration on equity participation Receiving of annual allowed revenue (financial asset) Receiving of indemnities of financial asset Payment of income tax and Social Contribution Payment of complementary pension fund Payment of lawsuit contingencies Lawsuits deposits Net cash from operating activities Increase (decrease) in cash and cash equivalent Cash and cash equivalent – beginning of period - 12/31/13 Cash and cash equivalent – end of period – 03/31/14 123 Marketletter Analysis of the result 3Q14 x 2Q14 The Company had a net loss in the 3Q14 167.9% lower than reported in the previous quarter, from a profit of R$ 61.4 million in the 2Q14 for a loss of R$ (41.7) million in the 3Q14, primarily due to the factors described below. Operating Revenue In generation: The supply of electricity to distribution companies increased by 5.7%, from R$ 77.0 million in the 2Q14 to R$ 81.4 million in the 3Q14, due to contractual adjustments, as well as the seasonality of sales contracts. Revenue from sale of electricity decreased by 869% because of reduced physical assurance of plants due to the occurrence of GSF (Generation Scaling Factor). In transmission: Revenues from operation and maintenance of renewed lines had an increase of 24% from R$ 111 million in the 2Q14 to R$ 137.6 million in the 3Q14, mainly due to the adjustment in the amount of RAP on the 2014/2015 cycle and adjustments related to the variable amount and system apportionment. Revenues from operation and maintenance had an increase of 20.4%, from R$ 45.7 million in the 2Q14, for R$ 55 million in the 3Q14, mainly due to the reduction in the percentage of operation and maintenance by the readjustment of the value of the RAP on the 2014/2015 cycle. Other operating revenue increased 15%, from R$ 6.8 million in the 2Q14 for R$ 7.9 million in the 3Q14, due primarily to an increase in service delivery. Operating Expenses Expenses for personnel, material and services decreased by 2.9%, from R$ 123 million in the 2Q14 to R$ 119.5 million in the 3Q14, mainly due to salary adjustment in the second quarter and that reflects on all provisions accounting, such as vacation pay and related charges. Electricity purchased for resale increased by 2.6%, from R$ 15.3 million in the 2Q14 to R$ 15.8 million in the 3Q14, due mainly due to the purchase of the Power Purchase Agreement - PPA signed with SPE Energia Sustentável do Brasil (UHE Jirau). Operating Provisions decreased 15.8%, from a reversal of R$ 130.3 million in the 2Q14 for a reversal of R$ 109.8 million in the 3Q14, mainly due to reversal of provision for onerous contracts in UHE Jirau. While in the 2Q14 reversal was R$ 132.0 million, in the 3Q14 was R$ 108.1 million. Financial Results Financial income decreased by 33.6%, from R$ 15.7 million in the 2Q14 to R$ 10.4 million in the 3Q14, mainly due to changes in cash and cash equivalents. The charges on shareholder remuneration decreased by 35%, from R$ 11.1 million in the 2Q14 to R$ 7.2 million in the 3Q14, due mainly to update in Selic, in the 2Q14, of additional dividends proposed in respect of 2014 first half. Net monetary variations increased 64.7%, from R$ 14.3 million in the 2Q14 to R$ 23.5 million in the 3Q14, mainly due to variation on loans and financing from Eletrobras that are adjusted by the IPCA, and contingencies update. Shareholding Participations The result from equity investments decreased by 248.8% from a loss of R$ (44.8) million in the 2Q14 to a loss of R$ (156.3) million in the 3Q14, mainly due to inferior results presented by investees companies. 124 Marketletter Market Data 1.Generation Assets and Energy generated 1.1.Own assets Plant Installed Capacity (MW) Guaranteed energy (MW Average) UHE Passo São João UHE Mauá* UHE São Domingos SCH Barra do Rio Chapéu SCH João Borges Cerro Chato I WPP Cerro Chato II WPP Cerro Chato III WPP Megawatt Solar 77.0 177.9 48.0 15.15 19.0 30 30 30 0.93 41.1 96.9 36.4 8.61 10.14 11 11 11 - Energy Generated (MWh) 1Q14 2Q14 67,052.7 186,075.2 50,819.7 13,740.0 12,760.3 22,236.2 23,209.4 22,391.0 - 3Q14 119,228.2 253,601.7 48,277.8 18,764.0 25,586.7 24,042.3 25,445.5 24,640.5 35.1 143,053.7 302,507.4 48,202.5 14,723.9 19,297.3 28,611.6 30,441.5 29,583.3 171.5 * Mauá Consortium (49% Eletrosul). The figures relate to the company's participation in the venture Plant Location (State) Beginning of Operation End of Operation UHE Passo São João RS Mar/12 Aug/41 UHE Mauá* PR Nov/12 Jul/42 UHE São Domingos MS Jun/13 Dec/37 PCH Barra do Rio Chapéu SC Feb/13 May/34 PCH João Borges SC Jul/13 Dec/35 WPP Cerro Chato I RS Nov/11 Aug/45 WPP Cerro Chato II RS Set/11 Aug/45 WPP Cerro Chato III RS May/11 Aug/45 Megawatt Solar SC May/14 - * Mauá Consortium (49% Eletrosul) 1.2.SPE SPE Installed Capacity (MW) Plant Guaranteed energy (MW Average) ESBR Participações S.A. UHE Jirau* 3,750.0 2,184.6 Eólica Livramento Wind Plant** 78.0 29.0 Energy generated (MWh) 1Q14 2Q14 3Q14 289,282,53 730,294,27 1,047,941,35 4,089,30 8,181,40 20,238,8 * UHE Jirau is operating with 975 MW capacity ** The wind power plants refers to plants of Livramento Holding, operating with 18 MW of installed capacity. Plant Participation (%) Location (State) Beginning of Operation End of Operation UHE Jirau 20.00 RO Sep/13 Aug/43 Wind – Livramento Holding SA 49.00 RS Nov/13 Mar/47 125 Marketletter 2.Electric energy purchased for resale 2.1.Own assets System Eletrobras Others* Total Unit MWh R$ million MWh R$ million MWh R$ million 1Q14 2Q14 3Q14 12,178,792 4,51 12,178,792 4,51 10,968,506 1,857 10,968,506 1,857 67,699,035 21,61 67,699,035 21,61 * Includes the reimbursement to Klabin (PCH Salto Mauá). According to Concession Contract # 001/2007, the enterprise should reimburse Klabin, bythe loss in generation in PCH Salto Mauá. 2.2.SPE Livramento Holding S.A. System Unit MWh R$ million MWh R$ million MWh R$ million Eletrobras Others TOTAL 1Q14 2Q14 3Q14 17,176,7 11,537 17,176,7 11,537 47,403,7 27,363 47,403,70 27,363 42,181,63 25,702 42,181,63 25,702 3.Energy sold 3.1.Own assets 3.1.1. Energy sold by enterprises not affected by 12,783 law (not from quotas) Buyer Eletrobras System Others Total Sale model A B A B* A B 1Q14 R$ million MWh 76,0 7,3 76,0 7,3 454,413,7 59,727,9 454,413,7 59,727,9 2Q14 R$ million MWh 69,5 7,3 69,5 7,3 417,140,5 57,999,5 417,140,5 57,999,5 3Q14 R$ million 73,9 7,4 73,9 7,4 MWh 429,127,0 61,216,4 429,127,0 61,216,4 A – Regulated enviroment B - Through free market agreements or bilateral contracts * Includes the reimbursement to Klabin (PCH Salto Mauá). According to the Concession Contract # 001/2007 – MME – HEU Mauá, the enterprise should reimburse Klabin by loss in generation in Salto Maua PCH 126 Marketletter 3.1.2. Energy sold by enterprises affected by 12,783 law – O&M – N/A 3.2.SPE ESBR Participações S.A. Buyer Sale model 1Q14 R$ million A B A B A B Eletrobras System Others Total 3,2 1,6 28,2 2,4 31,4 4,0 91,4 TOTAL CCEE 2Q14 MWh R$ million 32,900 9,500 299,400 14,200 332,300 23,700 -66,800 8,3 3,7 76,5 5,6 84,8 9,3 108,1 3Q14 MWh 88,100 21,900 799,600 32,900 887,700 54,800 -212,200 R$ million MWh 12,7 16,7 112,0 24,3 124,7 41,0 12,9 131,300 98,300 1,141,200 143,900 1,272,500 242,200 -466,700 A – Regulated enviroment B - Through free market agreements or bilateral contracts Livramento Holding S.A. Buyer Sale model 1Q14 R$ million A B A B A B Eletrobras System Others Total 2Q14 MWh R$ million 3Q14 MWh R$ million MWh 0.765 2,762,232 1,529 6,918,74 0.346 6,921,85 6,316 23,001,768 13,136 57,702,47 2,856 57,110,14 7,081 25,764,000 14,665 64,621,21 3,202 64,031,99 A – Through Auctions B - Through free market agreements or bilateral contracts 4.CCEE settlement (Spot and MRE – Regulated Market) Unit R$ million MWh MWaverage Net 1Q14 -10,33 -117,100,99 -54,19 2Q14 -10,30 52,020,60 23,82 3Q14 -0.04 169,390,74 76,72 5. Fuel used to produce electricity - N/A 6. Losses in generation - % 1Q14 2Q14 3Q14 3.31 3.35 3.17 * Considers Basic Network and Internal Losses 127 Marketletter 7.Average price– R$/MWh 7.1.Own assets – enterprises not affected by 12,783 law 1Q14 2Q14 3Q14 166.11 168.50 173.68 7.1.Own assets – enterprises renewd in terms of 12,783 law – O&M – N/A 7.2.SPE SPE ESBR Participações S.A. Livramento Holding S.A. 1Q14 2Q14 3Q14 99.31 274.85 99.87 232.66 109.38 50.01 8.Extension of transmission lines – Km 8.1.Own assets 8.1.1.Transmission lines Extension (km) From - To Blumenau – Biguaçu /Campos Novos Salto Santiago/Ivaiporã Ivaiporã/Cascavel Oeste Campos Novos(SC)/Nova S. Rita(RS) Sub/Total 525 kV Coletora Porto Velho / P. Velho (RO) Sub/Total 500/230 kV Presidente Médice/Santa Cruz Monte Claro /Garibaldi Sub/Total 230 kV General Total 357.8 168.5 203.4 257.4 987.1 44.0 44.0 237.4 33.5 270.9 1,302.0 Tension (kV) Beginning of Operation End of Concession 525 525 525 525 Sep/06 Oct/05 Oct/05 May/09 Mar/35 Feb/34 Feb/34 Apr/36 500/230 Aug/12 Feb/39 230 230 Jan/10 Sep/13 Mar/38 Oct/40 8.1.1.2.Transmission lines – enteprises renewed in terms of 12,783 law – O&M From - To Areia/Bateias Areia/Campos Novos Areia/Curitiba Areia/Ivaiporã Areia / /Segredo Blumenau / /Curitiba Campos Novos / /Machadinho Campos Novos / /Caxias Caxias / /Gravataí Caxias / /Itá Curitiba –Bateias Itá – Nova Santa Rita Gravataí – Nova Santa Rita Itá / /Machadinho Itá / /Salto Santiago Ivaiporã / /Londrina Ivaiporã / /Salto Santiago Ivaiporã Eletrosul / Ivaiporã Furnas Ivaiporã Eletrosul / Ivaiporã Furnas Extension (km) Tension (kV) Beginning of Operation End of Concession 220.3 176.3 235.8 173.2 57.8 135.7 50.2 203.3 78.7 256.0 33.5 314.8 29.1 70.1 186.8 121.9 165.6 525 525 525 525 525 525 525 525 525 525 525 525 525 525 525 525 525 Jun/00 Sep/82 Jun/00 May/82 Aug/92 Dec/83 Jan/02 Dec/01 Dec/01 Feb/02 Jun/00 Apr/06 Apr/06 Jan/02 Sep/87 Apr/88 May/82 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 0.8 525 Sep/82 Dec/42 0.8 525 Feb/92 Dec/42 128 Marketletter From - To Ivaiporã Eletrosul / Ivaiporã Furnas Salto Santiago //Segredo Salto Santiago //Segredo Areia / /Gov. Bento Munhoz Areia / /Gov. Bento Munhoz Cascavel D'Oeste /Guaíra Campos Novos / /Machadinho 2 Ivaiporã / /Londrina 2 Itá / /Salto Santiago 2 Sub/Total 525 kV Anastácio – Dourados Areia / Ponta Grossa Norte Areia / Salto Osório Areia / Salto Osório Areia / São Mateus do Sul Assis / Londrina Copel Blumenau –Jorge Lacerda B Biguaçu – Blumenau 2 Blumenau – Itajaí Blumenau – Itajaí Blumenau – Joinville Blumenau – Joinville Norte Blumenau – Palhoça Campo Mourão / Apucarana Campo Mourão /Maringá Campo Mourão /Salto Osório 1 Campo Mourão /Salto Osório 2 Canoinhas /São Mateus do Sul Cascavel /Cascavel D'Oeste Caxias / Caxias 5 Curitiba –Joinville Curitiba /São Mateus do Sul Farroupilha /Caxias 5 Monte Claro – Passo Fundo Farroupilha /Monte Claro Farroupilha /Monte Claro2 Monte Claro – Nova Prata Jorge Lacerda A /Jorge Lacerda Jorge Lacerda "B"/ Palhoça Jorge Lacerda / Siderópolis 1 Jorge Lacerda / Siderópolis 2 Londrina(Eletrosul) / Assis Londrina(Eletrosul) / Maringá Londrina – Apucarana Londrina Eletrosul / Londrina Copel Atlândida 2 / Osório 2 Passo Fundo / Nova Prata 2 Passo Fundo – Xanxerê Passo Fundo – Xanxerê Passo Fundo / Passo Fundo 1 Passo Fundo / Passo Fundo 2 Salto Osório / Pato Branco Salto Osório – Xanxerê Salto Osório / Salto Osório (1 a 6) Lajeado Grande / Forquilhinha Lajeado Grande / Caxias 5 Xanxerê / Pato Branco Joinville / Vega do Sul 1 Joinville / Vega do Sul 2 Gravataí 2/ / Gravataí 3 Complexo Industrial Automotivo Gravataí /Gravataí 3 Extension (km) Tension (kV) Beginning of Operation End of Concession 0.8 525 Jun/04 Dec/42 60.9 2.1 10.7 10.9 126.2 39.9 122.1 187.6 3,071.9 210.9 181.6 156.3 156.2 129.0 114.3 129.5 116.4 37.5 37.5 67.0 72.8 133.9 114.5 79.9 181.2 181.3 47.7 9.9 22.5 99.7 116.7 17.9 211.5 31.0 31.0 30.9 0.8 120.6 49.4 47.3 156.5 95.3 40.4 525 525 525 525 525 525 525 525 Aug/92 Aug/92 Sep/80 Aug/81 Apr/01 Jan/02 Apr/88 Sep/87 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 230 Aug/94 Oct/76 Jan/77 Dec/76 Jul/90 Mar/79 Oct/80 Jun/79 Jan/02 Mar/02 Sep/79 Apr/79 Jan/84 Feb/76 Feb/76 Feb/76 May/76 Feb/88 Apr/01 Jun/09 Jun/77 Jul/90 Oct/05 Sep/04 Sep/04 Sep/04 Sep/04 Dec/79 Aug/05 Jun/79 Aug/79 May/05 May/05 Apr/88 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 31.6 230 Apr/88 Dec/42 36.0 199.1 79.3 79.2 0.4 0.4 85.9 162.0 230 230 230 230 230 230 230 230 May/07 Nov/92 May/75 Nov/79 Mar/73 May/73 Dec/79 Oct/75 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 2.2 230 Nov/75 Dec/42 116.5 65.6 79.6 44.1 44.1 2.1 230 230 230 230 230 230 Sep/03 Oct/05 Dec/79 Nov/02 Nov/02 Nov/07 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 2.1 230 Dec/07 Dec/42 129 Marketletter From - To Jorge Lacerda A / Jorge Lacerda B2 Jorge Lacerda B / Jorge Lacerda C1 Jorge Lacerda B / Jorge Lacerda C2 Biguaçu –Palhoça Biguaçu –Palhoça (Circuito Duplo) Biguaçu – Desterro Circiuto Duplo Biguaçu – Desterro (Continente) Biguaçu – Desterro (Marítimo) Biguaçu – Desterro (Ilha) Curitiba /Joinville Norte (Circuito Duplo) Curitiba /Joinville Norte (Circuito Simples) Joinville – Joinville Norte (Circuito Duplo) Joinville – Joinville Norte (Circuito Simples) Dourados –Guaíra (Estaiada) Dourados –Guaíra (Circiuto Duplo) Atlântida 2/Gravataí 3 Atlântida 2/Gravataí 3 (Circuito Duplo) Livramento / Rivera El Dorado / Guaíra Siderópolis / Forquilhinha Campos Novos / Barra Grande Sub/Total 230 kV Blumenau / Ilhota Campo Grande / Mimoso 2 Biguaçu – Camboriú – Morro do Boi Biguaçu – Florianópolis Campo Grande / Mimoso 3 Campo Grande / Mimoso 4 Dourados das Nações / Ivinhema Florianópolis / Itajaí Fazenda Florianópolis / Palhoça 1 Florianópolis / Palhoça 2 Blumenau / Gaspar Ilhota – Picarras Ilhota / Itajaí 1 Ilhota / Itajaí 2 Itajaí / Camboriú Morro do Boi Itajaí / Itajaí Fazenda Ivinhema / Porto Primavera Jorge Lacerda A / Imbituba Jorge Lacerda A / Palhoça Joinville / Joinville Santa Catarina Joinville Santa Catarina / Picarras Jupiá – Mimoso 2 Jupiá – Mimoso 3 Jupiá – Mimoso 4 Palhoça – Imbituba Anastácio / Aquidauana 1 Anastácio / Aquidauana 2 LI Araquari/Joinville GM Extension (km) Tension (kV) Beginning of Operation End of Concession 0.8 230 Oct/07 Dec/42 0.5 230 Feb/97 Dec/42 0.5 230 Feb/97 Dec/42 2.7 230 Oct/08 Dec/42 17.7 230 Oct/08 Dec/42 17.7 230 Dec/08 Dec/42 21.0 4.3 13.6 230 230 230 Dec/08 Dec/08 Dec/08 Dec/42 Dec/42 Dec/42 1.0 230 Nov/76 Dec/42 95.4 230 Nov/76 Dec/42 1.0 230 Nov/76 Dec/42 4.3 230 Nov/76 Dec/42 209.6 230 Nov/91 Dec/42 16.9 230 Nov/91 Dec/42 64.2 230 Apr/08 Dec/42 36.0 230 Apr/08 Dec/42 1.9 16.9 27.6 34.6 4,847.3 40.2 108.3 50.3 230 230 230 230 Jan/01 Oct/82 Oct/11 Sep/05 Dec/42 Dec/42 Dec/42 Dec/42 138 138 138 Oct/88 Oct/83 Feb/02 Dec/42 Dec/42 Dec/42 19.5 108.3 108.3 94.7 138 138 138 138 Feb/02 Sep/83 Sep/83 Dec/83 Dec/42 Dec/42 Dec/42 Dec/42 58.4 9.6 9.6 29.0 14.8 7.9 7.9 13.3 5.4 91.0 45.7 108.6 11.0 138 138 138 138 138 138 138 138 138 138 138 138 138 Oct/90 Nov/83 Nov/83 Sep/89 Apr/94 Mar/02 Jan/02 Feb/02 Mar/02 Mar/82 Oct/80 Oct/83 Oct/99 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 50.0 138 Oct/99 Dec/42 218.7 218.7 218.7 74.0 11.1 11.1 19.3 138 138 138 138 138 138 138 Feb/92 Jan/82 Jan/82 Oct/83 Nov/06 Nov/06 May/12 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 Dec/42 130 Marketletter From - To Biguaçu/ Florianópolis 2 Ilhota/Araquari Hyosung Ilhota/Gaspar Joinville/Joinville GM Sub/Total 138 kV Conversora de Uruguaiana / Passo de Los Libres Salto Osório / Salto Santiago Sub/Total (132 and 69 kV) Total geral Extension (km) Tension (kV) Beginning of Operation End of Concession 19.5 47.7 11.2 8.7 1,850.5 138 138 138 138 May/11 Sep/11 Oct/88 May/12 Dec/42 Dec/42 Dec/42 Dec/42 12,5 132 Sep/94 Dec/42 69 Oct/78 Dec/42 56,2 68.7 9,838.4 8.1.2.Substations 8.1.2.1. Substations – enterprises not affected by 12,783 law Substations SE – Missões SE – Biguaçu SE – Foz do Chapecó * SE – Caxias 6 SE – Ijuí 2 SE – Lageado Grande * SE – Nova Petrópolis 2 SE – Coletora Porto Velho SE Biguaçu –ampliação SE Tapera 2 - ampliação SE Joinville Norte - ampliação SE Nova Santa Rita –ampliação Total Transformation capacity (MVA) 150 1,344 100 330 166 75 83 800 150 83 150 672 4,103 Location Beginning of Operation End of Operation RS SC RS RS RS RS RS RO SC RS SC RS Nov-10 Apr-08 Dec-12 Aug-12 Apr-13 Nov-12 Nov-12 Aug-12 Oct-12 Nov-12 Sep-13 Dec-13 Jan-39 Mar-35 Oct-40 Oct-40 Oct-40 Oct-40 Oct-40 Feb-39 Dec-42 Dec-42 Dec-42 Dec-42 *Transformers installed in third-part related substations 131 Marketletter 8.1.2.2. Substations – enterprises renewd in terms of 12,783 law – O&M Transformation Capacity (MVA) Substations SE - Campos Novos SE – Caxias SE – Gravataí SE - Nova Santa Rita SE – Blumenau SE – Curitiba SE – Londrina SE - Santo Ângelo SE – Biguaçu SE – Joinville SE – Areia SE – Xanxerê SE – Itajaí SE - Jorge Lacerda "A" SE – Palhoça SE - Canoinhas SE - Siderópolis SE - Assis (*) SE - Joinville Norte SE - Dourados SE - Atlântida 2 SE - Caxias 5 (*) SE - Passo Fundo SE - Tapera 2 SE - Gravataí 3 SE - Desterro SE - Anastácio Conver. frequência de Uruquaiana SE – Ilhota SE – Alegrete SE - Charqueadas SE – Farroupilha SE – Salto Santiago SE – Florianópolis SE – Salto Osório SE – Itararé Total 2,466 2,016 2,016 2,016 1,962 1,344 1,344 1,344 300 691 672 600 525 399.8 384 375 352 336 300 300 249 215 168 166 165 150 150 109.7 100 66 88 88 15 75 33.3 42 21,622.8 Location Beginning of Operation End of Operation SC RS RS RS SC PR PR RS SC SC PR SC SC SC SC SC SC SP SC MS RS RS RS RS RS SC MS RS SC RS RS RS PR SC PR SC Sep/1982 Dec/2001 Sep/1982 Aug/2009 Apr/1979 Out/1980 Apr/1988 Dec/1999 Apr/2008 Nov/1974 Aug/1980 Jun/1983 Jan/2002 Jun/1973 Jan/1984 Feb/1988 Apr/1975 Mar/1979 Jun/2009 Nov/1987 May/2007 Jun/2005 Nov/1992 Mar/2005 Nov/2007 Dec/2008 Aug/1994 Sep/1994 Dec/1976 May/1971 Jan/1972 Jun/1973 Nov/1980 Dec/1974 Out/1975 May/2013 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 Dec-42 * Transformers installed on third-part related substations 8.2.SPEs 8.2.1. Transmission Line SPE Etau Uirapuru Transmissora Sul Brasileira de Energia - TSBE Costa Oeste From - To Linha de transmissão (Campos Novos (SC) – Barra Grande (SC) – Lagoa Vermelha (RS) – Santa Marta (RS)) Linha de transmissão (Ivaiporã (PR) – Londrina (PR)) LT 525 KV 188 Km Salto Santiago – Itá LT 525KV 307 Km Itá – Nova Santa Rita LT Cascavel Oeste – Umuarama, CS Participation (%) Extension (km) Tension (kV) Beginning of Operation End of Concession 27.42 188 230 Jul/05 Dec/32 75.00 120 525 Jul/06 Mar/35 188 525 Feb/14 May/42 307 525 Jul/14 May/42 143 230 Aug/14 Jan/42 80.00 49.00 132 Marketletter 8.2.2. Substations SPE Participation (%) Substation Transmissora Sul Brasileira de Energia TSBE Costa Oeste* Ampliação SE 525 KV Salto Santiago Ampliação SE 525 kV Itá e Ampliação SE 525/230kV Nova Santa Rita Subestação Umuarama 230/138 kV – 2X150 MVA Beginning of Operation Transformation Capacity (MVA) End of Operation - Feb/14 May/42 - Jul/14 May/42 300 Jul/14 Jan/42 80.00 49.00 9.Transmission losses - % - N/A 10.Main investments of parent company– R$ million Project Generation Installation of Hydro Complex São Domingo Installation of Solar Megawatt Project Electric energy generation Maintenance Hydro Complex Hidreletrico Alto da Serra installation with 37.0 MW and Associate of transmission system in 138 KV, with 54 Environmental Preservation and Conservation Projects Transmission Expansion of South transmission system Improvement in Transmission System in Southern Region and in Mato Grosso do Sul Brazil-Uruguay-Electric Interconnection (Eletrosul Activities) Maintenance of electric energy transmission system Infra-Structure Total 1Q14 2Q14 3Q14 1.7 0.3 0.5 18.4 2.5 14.8 4.2 0.3 1.2 2014 budget 134.2 0.4 0.3 17.3 0.9 1.2 2.7 116.1 11.1 6.2 0.1 4.7 0.0 0.6 13.4 16.0 9.3 0.4 5.7 0.6 2.2 36.6 16.9 10.0 0.5 6.2 0.2 1.8 22.9 0.1 195.9 153.8 5.9 30.2 6.1 47.9 378.0 11.New investments 11.1.Generation 11.1.1.Own assets Unit -Own assets PCH Santo Cristo* PCH Coxilha Rica** Location (State) Total of Invest. up investment to 3Q14 (R$ (R$ million) million) Installed capacity (MW) Guaranteed Beginning Beginning of End of energy of Operation Concession (MW) Construction SC 183,4 16,87 19.5 10.5 - - Jun/42 SC 141,0 10,08 18.0 10.1 - - Jun/42 * In stage of installation license. Beginning of Operation scheduled for 22 months after the license is issued. ** Beginning of Construction and Operation undefined in order of the negative athorization by IPHAN. 133 Marketletter 11.1.2.SPE SPE ESBR Participações S/A Teles Pires Participações S.A. Eólica –Chuí Holding SA Eólica – Livramento Holding SA Eólica – Santa Vitória do Palmar SA Hermenegildo I Hermenegildo II Hermenegildo III Chuí IX Coxilha Seca Unit Location (State) Installed capacity (MW) Guaranteed Energy (MW) Beginning of Operation Beginning of Construction End of Concession UHE Jirau RO 3,750 2,184.6 Sep/13 Dec/09 Aug/43 MT 1,820 915.4 Jan/15 Aug/11 Jun/46 RS 144 59.8 Nov/14 Feb/14 Apr/47 RS 78 29.0 Nov/13 Jan/12 Mar/47 RS 258 109.0 Nov/14 Nov/12 Apr/47 RS 57.3 27.4 Apr/15 Aug/14 Jun/49 RS 57.3 26.6 Jun/15 Aug/14 Jun/49 RS 48.3 22.2 May/15 Aug/14 Jun/49 RS 17.9 7.8 Apr/15 Aug/14 May/49 RS 48.0 18.7 May/15 Mar/14 May/49 UHE Teles Pires Parques eólicos de Chuí I a V, (98MW) e Minuano VI e VII (46MW). Parques eólicos de Cerro Chato IV, V, VI, Ibirapuitã e Trindad Parques eólicos Geribatu de I a X Parques eólicos Verace 24 to 27 Parques eólicos Verace 28 a 31 Parques eólicos Verace 34 a 36 Parque eólico Chuí IX Coxilha Seca, Galpões e Capão do Inglês. 134 Marketletter 11.1.2.1 SPE SPE ESBR Participações S/A Teles Pires Participações S.A. Eólica –Chuí Holding SA Eólica –Livramento Holding SA Eólica – Santa Vitória do Palmar SA Hermenegildo I Hermenegildo II Hermenegildo III Chuí IX Coxilha Seca Unit Investiment (R$ million) Total Up to 3Q14 Working Participation (%) Schedule (%) Partners Suez – 40%. Chesf – 20% and Mitsui – 20% Neoenergia – 50.6% and Furnas – 24.7% UHE Jirau 18,641,0 17,954,4 95.54 20.00 UHE Teles Pires 4,452,76 3,882,0 92.07 24.70 805,6 248,0 55.7 49.00 Rio Bravo Investimentos 51% 490,3 338,0 89.7 52.53 Rio Bravo Investimentos 41% and Fundação Elos – 6.47% 1,099,10 874,0 95.0 49.00 Brave Winds Geradora – 51% 287,26 19,1 * 99.99 Renobrax – 0.01% 287,26 8,5 * 99.99 Renobrax – 0.01% 244,9 6,4 * 99.99 Renobrax – 0.01% 81,6 8,7 * 99.99 Renobrax – 0.01% 270,0 0.5 * 99.99 Renobrax – 0.01% Parques eólicos de Chuí I a V, (98MW) e Minuano VI e VII (46MW). Parques eólicos de Cerro Chato IV, V, VI, Ibirapuitã e Trindade Parques eólicos Geribatu de I a X Parques eólicos Verace 24 a 27 Parques eólicos Verace 28 a 31 Parques eólicos Verace 34 a 36 Parque eólico Chuí IX Coxilha Seca, Galpões e Capão do Inglês. *Construction with recent beginning 135 Marketletter 11.2.Transmission 11.2.1.Own assets 11.2.1.1.Transmission lines Own lines From - To Secc. LT JLA – PAL, na SE GAROPABA Secc. LT JLA – PAL, na SE PALHOÇA – PINHEIRA LT Passo Fundo / Monte Claro 230Kv Secc. LT 138 KV Araquari Hyosung – Joinville GM, na SE Joinville SC Seccionamento da LT 138 kV Porto Primavera Ivinhema, na SE IVINHEMA 2, circuito duplo Seccionamento da LT 138 kV PORTO PRIMAVERA IVINHEMA, na SE NOVA ANDRADINA (Enersul) Interligação Elétrica Brasil – Uruguai – LT Candiota-Melo Interligação Elétrica Brasil – Uruguai – LT Presidente Médici-Candiota Seccionamento da LT 230 kV Blumenau - Palhoça, na SE Gaspar 2 Total of investment (R$ million) Invest. up to 3Q14 (R$ million) Extension of lines (Km) Tension (kV) 7,61 0.70 5.4 138 5,48 2,5 3.7 138 9,29 4,93 11.0 230 3,55 0.18 1.0 3,42 0.02 3.5 10,93 0.06 11.0 51,66 48,69 5,43 15,81 Beginning of Operation Forecasted to Dec/15 Forecasted to Sep/15 Forecasted to Mar/15 End of Concession Dec/42 Dec/42 Dec/42 Forecasted to Sep/15 Dec/42 Forecasted to Jan/16 Jan/44 138 Forecasted to Jan/16 Dec/42 60.0 525 Nov/14* Feb/40 6,92 2.8 230 Nov/14* Feb/40 0.01 2.0 230 Forecasted to Sep/16 138 138 Jan/44 *Enterprise concluded in Sep/14, but the commercial Operation depends on the conclusion of SE Candiota, forecasted to Nov/14. 136 Marketletter 11.2.1.2.Substations Substation SE Garopaba –Implantação de dois módulos de EL SE Pinheira – Implantação de dois módulos de EL SE Nova Prata 2 – Implatação de 2 módulo de EL SE Joinville Norte – Ampliação D Instalação de 2 bancos de capacitores 230kV – 2x100MVA SE – Foz do Chapecó Ampliação B º3 Trafo / 230/138kV SE Alegrete–Transf. trafo /69/13,8/13,8kV 17MVA SE Joinville SC – Implantação de dois módulos de entrada de linha Subestação Ivinhema 2 (ampliação / 230/138 kV) SE Siderópolis – ampliação K – implantação de um módulo de entrada de linha em 69 KV SE Foz do Chapecó – ampliação D – implantação de um módulo de entrada de linha em 138 KV SE Biguaçu – Ampliação “G” – 230/138/13,8 KV SE Biguaçu - Ampliação "J" SE Canoinhas - Ampliação "G" – 50 MVAR SE Desterro - Ampliação "A" SE Joinville Norte - Ampliação "E" Reforços em SEs: Gravataí, Gravataí 2, Salto Osório, Curitiba, Areia Reforços em SEs: Farroupilha, Florianópolis, Ilhota, Palhoça, Areia Total of investment (R$ million) Invest. up to Transformation 3Q14 (R$ capacity million) Location Beginning of Operation Scheduled for Dec/15 Scheduled for Sep/15 Scheduled for Mar/15 End of Concession 6,23 0.62 0.00 SC 5,20 3,14 0.00 SC 9,31 4,52 0.00 RS 12,31 3,39 200 SC 11,79 1,58 100 RS 7,56 3,35 66 RS 5,13 0.10 0.00 SC 24,90 0.52 300 MS 1,53 0,04 0.00 SC Scheduled for Dec/15 Dec/42 1,69 0.22 0.00 RS Scheduled for Dec/15 Jun/44 14,68 0.09 150 SC 46,91 0.05 672 SC Scheduled for Apr/16 Sep/16 Scheduled for Feb/15 Scheduled for May/15 Scheduled for Dec/14 Scheduled for Sep/15 Scheduled for Jan/16 Dec/42 Dec/42 Dec/42 Dec/42 Jun/44 Dec/42 Dec/42 Jan/44 Dec/42 Mar/35 7,24 0.03 50 SC Sep/16 Dec/42 11,92 13,23 0.04 0.07 150 150 SC SC Sep/16 Sep/16 Dec/42 Dec/42 3,40 1,87 0.00 PR Jun/15 Dec/42 1,47 0.02 0.00 RS and SC 2016 Dec/42 137 Marketletter 11.2.2.SPEs 11.2.2.1.Transmission lines SPE From - To LT Coletora Porto Velho (RO) – Araraquara 2 (SP), em CC LT 525 KV Curitia / Marumbi Curitiba Leste (PR) LT de 230KV Nova Santa Rita – Transmissora Camaquã, Sul Brasileira de Energia SA LT 230KV Camaquã – Quinta, LT Nova santa Rita – Povo Novo, CS Transmissora LT Povo Novo – Sul Litorânea Marmeleiro, CS de Energia LT Marmeleiro – S/A* Santa Vitória do Palmar LT Santo Ângelo/Maçambará, em 230 kV Fronteira LT Pinhalzinho/Foz Oeste do Chapecó, Transmissora circuito simples, C1 de Energia e C2 S.A.** Seccionamento LT 138KV Alegrete 1 – Santa Maria 1 Norte Brasil Participation Investiment (%) (R$ million) Up to 3Q14 (R$ million) Extension Beginning Tensão End of of TL of (kV) Concession (Km) Operation 24.5 2,770.20 2,656.90 2,375 + 600 Nov/14 Feb/39 20 60,47 45,18 28 525 Mar/15 May/42 121 230 80 174,92 167,90 Nov/14 May/42 Nov/14 Aug/42 Mar/16 Jan/44 51 51 448,48 95,87 419,32 167 230 268 525 152 525 48 525 205 40 230 230 2 230 4,79 * The TL Nova Santa Rita-Povo Novo is forecasted to oct/14. The others to Nov/14 ** The TL Santo Ângelo-Maçambará is forecasted to Jan/16 while the portioning is forecasted to Jul/15. 138 Marketletter 11.2.2.2. Substations SPE Substations SE Curitiba Leste 1 Marumbi banco 3x224MVA 525/230kV SE Povo Novo525/230 kV, 672 MVA (4 unidades monofásicas de 224 MVA) e Ampliação SE Nova Santa Rita Transmissora Sul SE Marmeleiro Litorânea de 2 525 kV / Energia S.A. Compensador Síncrono ±200 Mvar SE Santa Vitória 2 do Palmar 525/138 kV, 75 MVA (1 unidade trifásica) SE Camaquã 3 230/69Kv Transmissora Sul 2x83MVA e Brasileira de ampliação da Energia S.A. SE 230 kV Quinta SE Pinhalzinho, em 230/138 kV (ATF1), SE Pinhalzinho, em 230/138 kV (ATF 2 e ATF3) e Fronteira Oeste Transmissora de ampliações SE Maçarambá, Foz Energia S.A. * do Chapecó e Santo Angelo Ampliação da SE Santa Maria 3, 230/138 kV Participation (%) Total of investment (R$ million) Transformation capacity (MVA) Location 20 56,79 672 PR Mar/15 May/42 101,25 672 RS Nov/14 Aug/42 175,09 200 RS Dec/14 Aug/42 48,54 75 RS Nov/14 Aug/42 51 Beginning End of of Concession Operation 80 50,15 166 RS Nov/14 Apr/42 51 58,69 450 RS Jan/16 Jan/44 23,75 166 RS Aug/15 Jan/44 * The ampliations of the SE’s Maçambará and Santo Ângelo are forecasted to Mar/16. 139 Marketletter 12.Loans and financing – R$ million Local currency – LC Creditor BNDES/BRDE BNDES BNDES/Banco do Brasil Banco do Brasil Eletrobras Balance 03.31.14 Balance 06.30.14 Balance 09.30.14 Due Date Index 22,7 1,116.9 21,4 1,094.3 20,8 1,073,8 05/15/2019 Up to 08/15/2028 TJLP + 4.5% py Currency basket + 4% py 377.2 365,7 354,8 Up to 01/15/2028 TJLP + 2.65% py 251.1 251,1 251,3 11/15/2023 115% of CDI Up to 03/30/2030 RGR/IPCA + 7% py/Selic + 0.5%py 1,114.3 1,117,0 1,131,4 Foreign currency – FC Balance 03.31.14 Creditor Eletrobras Balance 06.30.14 186,1 Balance 09.30.14 178,6 184,7 Due Date Currency Up to 12/30/2042 Euros 13.Contracts 13.1.Loans and financing 13.1.1.Parent company – R$ million Loans and financing By activity Generation Transmission By creditor Eletrobras Others 2014 2015 2016 2017 2018 394,0 189,1 204,9 394,0 228,5 165,5 89,8 43,1 46,7 89,8 24,5 65,3 276,2 132,6 143,6 276,2 92,9 183,2 284,4 136,5 147,9 284,4 101,2 183,2 283,8 136,2 147,6 283,8 105,1 178,7 After 2018 Total (LC + FC) 1,688,5 810,5 878,0 1,688,5 763,9 924,7 3,016,7 1,448,0 1,568,7 3,016,7 1,316,1 1,700,6 13.1.2.SPE – R$ million Uirapuru Transmissora de Energia S.A. Loans and financing By activity Generation Transmission By creditor BRDE 2014 2015 2016 2017 2018 After 2018 1,6 1,6 1,6 1,6 5,8 5,8 5,8 5,8 5,8 5,8 5,8 5,8 5,8 5,8 5,8 5,8 5,8 5,8 5,8 5,8 1,4 1,4 1,4 1,4 Transmissora Sul Litorânea de Energia S.A. Loans and financing By activity Generation Transmission By creditor Santander Banco ABC Brasil Banrisul 2014 2015 2016 2017 2018 After 2018 464,6 464,6 464,6 206,5 134,2 123,9 - - - - - - - - - - 140 Marketletter Transmissora Sul Brasileira de Energia S.A. Loans and financing By activity Generation Transmission By creditor BNDES 2014 2015 2016 2017 2018 After 2018 4,9 4,9 4,9 4,9 19,7 19,7 19,7 19,7 19,7 19,7 19,7 19,7 19,7 19,7 19,7 19,7 19,7 19,7 19,7 19,7 180,3 180,3 180,3 180,3 2014 2015 2016 2017 2018 After 2018 - 185,4 185,4 185,4 185,4 - - - 2015 2016 2017 2018 After 2018 19,0 19,0 19,0 12,6 6,4 38,0 38,0 38,0 25,3 12,7 38,0 38,0 38,0 25,3 12,7 38,0 38,0 38,0 25,3 12,7 475,9 475,9 475,8 316,8 159,1 2018 After 2018 Teles Pires Participações Loans and financing By activity Generation Transmission By creditor BNDES 2.185,5 2.185,5 2.185,5 2.185,5 Santa Vitória do Palmar Holding S.A. Loans and financing 2014 By activity Generation Transmission By creditor BNDES BRDE - Norte Brasil Transmissora de Energia S.A. Loans and financing By activity Generation Transmission By creditor BNDES 2014 17,6 17,6 17,6 17,6 2015 2016 2017 190,12 190,12 190,12 190,12 120,11 120,11 120,11 120,11 107,01 107,01 107,01 107,01 95,19 95,19 95,19 95,19 533,13 533,13 533,13 533,13 Marumbi Transmissora de Energia S.A. Loans and financing By activity Generation Transmission By creditor BRDE 2014 2015 2016 2017 2018 After 2018 - - - - - - 2014 2015 2016 2017 2018 After 2018 2,5 2,5 2,5 2,5 10,2 10,2 10,2 10,2 10,2 10,2 10,2 10,2 10,2 10,2 10,2 10,2 10,2 10,2 10,2 10,2 Livramento Holding S.A. Loans and financing By activity Generation Transmission By creditor BNDES 118,0 118,0 118,0 118,0 141 Marketletter Empresa de Transmissão do Alto Uruguai S.A. Loans and financing By activity Generation Transmission By creditor BNDES 2014 2015 2016 2017 2018 After 2018 3,5 3,5 3,5 3,5 7,0 7,0 7,0 7,0 7,0 7,0 7,0 7,0 7,0 7,0 7,0 7,0 0.5 0.5 0.5 0.5 - ESBR Participações S.A. Loans and financing By activity Generation Transmission Energy Trading By creditor Banco do Nordeste do Brasil Banco do Brasil BNDES Banco Itaú BBA BASA CEF Bradesco 2014 187,1 187,1 187,1 4,1 26,5 93,1 17,9 26,5 19,1 2015 561,2 561,2 561,2 12,3 79,4 279,4 53,6 79,4 57,2 2016 561,2 561,2 561,2 12,3 79,4 279,4 53,6 79,4 57,2 2017 561,2 561,2 561,2 12,3 79,4 279,4 53,6 79,4 57,2 2018 561,2 561,2 561,2 12,3 79,4 279,4 53,6 79,4 57,2 2019 After 2019 561,2 561,2 561,2 12,3 79,4 279,4 53,6 79,4 57,2 8,231,3 8,231,4 8,231,3 180,2 1,164,3 4,098,3 785,9 1,164,3 838,3 Total 11,224,6 11,224,6 11,224,6 245,7 1,587,7 5,588,6 1,071,7 1,587,7 1,143,2 Chuí Holding S.A. Loans and financing By activity Generation Transmission By creditor Banco ABC Brasil S.A - SPEs Banco ABC Banrisul 2014 10,2 10,2 10,2 10,2 - 2015 100,2 100,2 100,2 50,1 50,1 2016 2017 2018 After 2018 - - - - 2016 2017 2018 After 2018 Costa Oeste Transmissora de Energia S.A. Loans and financing By activity Generation Transmission By creditor BNDES 2014 0.3 0.3 0.3 0.3 2015 4,3 4,3 4,3 4,3 4,1 4,1 4,1 4,1 4,0 4,0 4,0 4,0 3,8 3,8 3,8 3,8 18,4 18,4 18,4 18,4 Chuí IX, Hermenegildo I, II and III and Coxiha Seca Loans and financing By activity Generation Transmission By creditor BNDES 2014 2015 2016 2017 2018 After 2018 - - - - - - 142 Marketletter 14.Number of employees (including requested employees from other Eletrobras companies/ excluding employees assigned to other Eletrobras companies) 14.1.By tenure Generation Composition of employees by tenure (Years) Up to 5 6 to 10 11 to 15 16 to 20 21 to 25 beyond 25 Total 1Q14 2Q14 42 35 5 1 9 1 93 3Q14 39 41 5 2 10 1 98 36 46 5 2 10 1 100 Transmission Composition of employees by tenure (Years) Up to 5 6 to 10 11 to 15 16 to 20 21 to 25 beyond 25 Total 1Q14 2Q14 3Q14 82 202 133 37 154 86 694 79 200 115 58 152 86 690 70 204 114 62 151 87 688 1Q14 2Q14 3Q14 168 126 61 2 133 61 551 155 135 51 14 134 61 550 141 148 50 15 135 60 549 Administration Composition of employees by tenure (Years) Up to 5 6 to 10 11 to 15 16 to 20 21 to 25 beyond 25 Total 14.2.By region State Santa Catarina Rio Grande do Sul Paraná Mato Grosso do Sul Rondônia 1Q14 Number of employees 2Q14 994 129 144 49 22 994 132 143 47 22 3Q14 995 133 142 45 22 14.3.By departments Departments Field Administrative 1Q14 787 551 Number of employees 2Q14 788 550 3Q14 788 549 143 Marketletter 15.Complementary work force - N/A 16.Turn-over - % 1Q14 2Q14 3Q14 0.04 0.00 0.18 144 Marketletter Balance Sheet (R$ thousands) Financial Statements for Consolidation Purposes Assets Current Assets Availabilities Clients (Consumers and Resellers) Financing and Loans - Principal Marketable Securities Dividends to receive (Remuneration from equity participation) Fiscal Assets diferred (taxes and contributions) Income tax and Social Contribution Linked deposits Stored Materials Financial Asset Receivables – 12,783/13 law Others Current Assets Total Non-Current Assets Clients (Consumers and Resellers) Financing and Loans - Principal Marketable Securities Fiscal Assets diferred (taxes and contributions) Income tax and Social Contribution Reimbursement Right – CCC (12,111 law) Linked deposits Financial Asset Receivables – 12,783/13 law Others Advance to equity participation INESTMENTS FIXED ASSETS INTANGIBLES Non-Current Assets Total Assets Total 09.30.14 09.30.13 4,963 43,957 19,255 29,326 3,904 101,405 6,278 72,033 22,735 100,201 41,775 243,022 19,741 43,285 8,078 114,489 185,593 1,551,201 1,455 9,989 11,776 21,765 1,641,965 1,679 1,738,249 1,839,654 1,665,409 1,908,431 145 Marketletter Liabilities and Stockholders’ Equity Current Liabilities Suppliers Loans and financing Taxes and social contributions Income tax and Social Contribution Advance from clients (Advance sell of energy) Remuneration to shareholders (dividends to pay) Estimated Obligations Provisions for Contingencies Post-employment Benefit (Complementary Pension Fund) Onerous Contracts Concessions to pay - UBP Sectorial Charges (regulatory taxes) Incentive to personnel retirement Others Non-Current Liabilities Suppliers Loans and financing Taxes and social contributions Income tax and Social Contribution Derivatives Advance from clients (Advance sell of energy) Estimated Obligations Provisions for Contingencies Provision for Onerous Contracts Post-employment Benefit (Complementary Pension Fund) Leasing Sectorial Charges (regulatory taxes) Advance for future capital increase Incentive to personnel retirement Others Stockholders’ Equity Social Capital Capital reserve Profit Reserve Additional proposed Dividend Accrued income (losses) Other comprehensive income Non-controlling shareholders participation Stockholders’ Equity Total Total Liabilities and Stockholders’ Equity 09.30.14 09.30.13 136,607 239,539 13,469 64,405 16,314 28,224 2,446 1,863 16,509 519,376 202,904 199,469 8,839 58,324 18,836 23,201 32 20,959 36,335 20,747 589,646 1,706,413 31,625 20,906 1,758,944 1,116,862 122,914 148,664 3,615 1,392,055 845,510 2,596 - 1,230,167 - 56,605 - 438,666 1,839,654 845,510 2,596 - 775,361 - 146,015 - 73,270 1,908,431 146 Marketletter Statement of Income (R$ thousands) 09.30.14 09.30.13 Operating Revenue Supply Supply Short term Electric Energy Other Operating Revenue Deductions to Revenue Net Operating Revenue 280,817 2,570 -31,877 251,510 210,230 2,869 -29,574 183,525 Operational Costs Electric Energy purchased for resale Charges on the use of electric grid Fuel for production of electric Energy - CCC Construction Cost -138,200 -23,000 -7,614 - -131,857 -19,249 -7,975 - Operating Expenses Personnel, material and third party services Remuneration and Reimbursement Depreciation and amortization Donations and Contributions Provisions Others Operating Costs and Expenses -218,565 -54,723 -4,570 -3,954 -450,626 -212,166 -53,983 -40,974 -18,693 -484,897 Operating Result before Financial Result -199,116 -301,372 Financial Result Result before Income tax and Social Contribution -141,822 -340,938 -56,803 -358,175 Current Income tax and Social Contribution Diferred Income tax and Social Contribution Net income for the period -340,938 -358,175 147 Marketletter Cash Flow (R$ thousands) Cash Flow 09.30.2014 09.30.2013 Operating Activities Income before income tax, social contribution Depreciation and amortization Amortization of Intangible assets – Distribution / Transmission Monetary / Exchange net variation Financial Charges Equity method result Provision for uncovered liability Provision for credits of questionable liquidation Provision for contingencies Provision for realignment of staff plan Provision for impairment Provision for onerous contract Provision for losses of financial asset Charges of reversal global reserve Adjustment to present value / market value (sum to Others item) Minority participation in the result Charges on shareholders funds Loss/Gain in the disposal of assets (sum to Others item) Revenue of Financial Asset by IRR Derivatives Others Increase/Decrease in operating assets/liabilities Cash from operating activities -340,938 54,723 -5,827 126,671 4,570 4,718 55,851 -84,167 -184,399 -358,175 57,839 -9,203 48,588 2,105 3,171 173 7,876 -247,626 Payment of financing charges Payment of charges of reversal global reserve Financial charges receiving Receiving of investment remuneration on equity participation Receiving of annual allowed revenue (financial asset) Receiving of indemnities of financial asset Payment of income tax and Social Contribution Payment of complementary pension fund Payment of lawsuit contingencies Lawsuits deposits Net cash from operating activities -33,430 3,876 -213,953 -18,604 -849 -267,079 Financing Activities Loans and Financing obtained Payment of loans and Financing - Principal Payment to shareholders Payment of refinancing of taxes and social contributions - principal Receiving of future capital increase Others Net cash from financing activities 392,033 -113,412 13,794 292,415 353,180 -125,234 60,395 288,341 Investment Activities Fixed Asset Acquisition Intangible Asset Acquisition Concession Asset Acquisition Concession of cash in advance for future capital Increase Acquisition/Contribution of Capital in equity participation Others Net cash from Investment Activities -90,570 -32 -90,602 -41,709 -70 -41,779 -12,140 -20,517 17,103 4,963 -12,140 26,795 6,278 -20,517 Increase (decrease) in cash and cash equivalent Cash and cash equivalent – beginning of period - 12/31/13 Cash and cash equivalent – end of period – 03/31/14 148 Marketletter Analysis of the result 3Q14 x 2Q14 The Company had a net loss in 3Q14 60% lower than reported in the previous quarter, from R$ (162.9) million in 2Q14 for R$ (65.1) million in 3Q14, primarily due to the factors described below. Operating Revenue The supply of electric energy increased by 16.7%, from R$ 90.6 million in 2Q14 to R$ 105.7 million in 3Q14, mainly due to the new power purchase contract with Eletronorte that enabled the company were to become a creditor in the CCEE in 3Q14. Operating Expenses The expenses with personnel, material and third-part related services decreased by 15.4%, from R$ (84.9) million in 2Q14 for R$ (71.8) million in 3Q14, mainly due to the reduction in third-part related services due to the reduced need for maintenance of the plants in 3Q14. The electric energy purchased for resale decreased by 85.7%, from R$ (85.6) million in 2Q14 for R$ (12.2) million in 3Q14, ma inly due to reduced exposure in CCEE due to contracts concluded with Eletronorte on power purchase. Financial Result The net foreign currency variations had increased 513.4%, from an expense of R$ (3.2) million in 2Q14 to an income of R$ 13,2 million in 3Q14, due mainly to exchange rate variation occurred in the period that affects the commitment established in US dollars related to the purchases of UTE Candiota III machines. The debt charges had increased by 18.4%, from R$ (45) million in 2Q14 to R$ (53.2) million in 3Q14, mainly due to higher loan balance in 3Q14. 149 Marketletter Market Data 1. Generation Assets and Energy generated Installed Capacity (MW) Unit P. Médici (Candiota) Candiota III – Fase C S. Jerônimo (Candiota) Nutepa (Candiota) Total Guaranteed energy (MW Average) 446 350 20 24 840 251,500 303,500 12,600 6,100 573,700 Location (State) Unit Energy generated (MWh) 1Q14 2Q14 111,708,680 449,521,640 0,00 0,00 561,230,32 3Q14 109,236,18 575,398,52 684,634,70 Beginning of Operation 122,418,140 542,829,850 665,247,990 End of Concession P. Médici (Candiota) RS Jan/74 Jul/15 Candiota III – Fase C RS Jan/11 Jul/41 S. Jerônimo (Candiota) RS Apr/53 Jul/15 Nutepa (Candiota) RS Feb/68 Jul/15 2. Electric energy purchased for resale System Eletrobras Others Total Unit 1Q14 MWh R$ million MWh R$ million MWh R$ million 2Q14 81,840,000 14,700 81,840,000 14,700 3Q14 359,640,000 64,690 359,640,000 64,690 298,080,000 47,773 298,080,000 47,773 3. Energy sold Buyer Eletrobras System Others Total Sale model A 1ºLEN A 2ºLEE A 4ºLEE B A B A B 1Q14 R$ million 120,937 28,820 10,422 160,179 - MWh 639.436,163 229.561,421 77.009,024 946.006,608 - 2Q14 R$ million 123,457 26,017 9,114 158,588 - MWh 639.478,838 202.989,578 66.306,220 908.774,64 3Q14 R$ million 126,386 27,932 9,698 164,017 MWh 644.736,000 213.081,329 68.637,344 926.454,673 A - Through auction B - Through free market agreements or bilateral contracts 150 Marketletter 4. CCEE settlement (Spot and MRE) Unit R$ million MWh MWaverage R$ million MWh MWaverage R$ million MWh MWaverage Sale Purchase Net 1Q14 2Q14 3Q14 -93,527 141,119,012 64,704 93,527 141,119,012 64,704 61,647 174,736,111 80,007 61,647 174,736,111 80,007 78,551 101,250,793 45,856 78,551 101,250,793 45,856 5. Fuel used to produce electricity Type Fuel oil Diesel Oil Coal TOTAL Unit T L T Amount 1Q14 3,740,689,980 10,000,00 614,885,798 R$ 5,284,521,44 21,977,00 20,918,695,52 26.225.193,96 Amount 9,899,120,00 20,000,00 657,705,740 2Q14 R$ 15,595,158,80 43,954,00 29,604,499,29 45.243.612,09 Amount 3Q14 9,026,120,00 12,600 617,906,80 R$ 12,781,888,53 27,691,02 22,048,010,86 34.857.590,41 6. Losses in generation - % P. Médici (Candiota) Candiota III – Fase C S. Jerônimo Nutepa 1Q14 2Q14 3Q14 25.82 12.08 100 100 28.47 11.47 100 100 25.65 11.43 100 100 7. Average price– R$/MWh 1Q14 2Q14 3Q14 150.23 153.30 156.54 8. Extension of transmission lines - Km - N/A 9. Transmission losses - % - N/A 10. Main investments of parent company – R$ million Project Generation Generation system Maintenance - MSGEE Environmental impact mitigation Phase A/B UPME revitalization Other Total 1Q14 1,546 2,394 846 56 4,842 2Q14 8,858 2,352 1,856 100 13,166 3Q14 2014 budget 2,872 3,210 591 2,465 9,138 74,000 50,237 113,370 4,000 241,607 11. New investments – N/A 151 Marketletter 12.Loans and financing – R$ million Local currency – LC Creditor Balance 03.31.14 Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Balance 06.30.14 539 155 102 84 25 56 39 10 14 10 43 30 202 9 43 13 44 14 21 36 11 27 26 41 20 15 5 8 44 5 - Balance 06.30.14 548 156 104 77 24 58 40 11 14 11 44 32 209 9 44 14 45 14 21 37 11 28 27 42 20 15 5 8 45 5 37 7 7 34 7 22 37 - 523,501 108,918 92,189 69,774 22,515 59,469 41,620 10,761 14,428 11,010 45,696 32,344 214,594 9,282 45,708 14,156 46,467 14,377 22,007 38,458 11,613 29,042 27,470 43,123 20,879 15,426 5,516 8,305 44,699 4,646 36,996 7,112 6,508 34,320 6,882 22,403 36,483 22,058 49,643 7,185 51,311 10,177 6,881 Due Date 12/20/2021 06/20/2016 12/20/2022 01/30/2017 05/30/2018 12/30/2024 12/30/2024 12/30/2024 12/30/2024 12/30/2024 12/30/2024 12/30/2024 12/30/2024 12/30/2024 12/30/2024 12/30/2024 12/30/2024 12/30/2024 12/30/2024 12/30/2024 12/30/2024 12/30/2024 12/30/2024 12/30/2024 12/30/2024 12/30/2024 12/30/2024 12/30/2024 03/30/2017 03/30/2017 04/30/2018 04/30/2016 02/29/2016 03/30/2017 05/30/2016 05/30/2018 06/30/2018 30/09/2022 12/30/2021 06/30/2022 12/30/2020 09/30/2022 06/30/2022 Index IPCA + Spread IPCA + Spread IPCA + Spread 5% py 5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Interest Rate+ 0.5% py Selic Interest Rate+ 0.5% py Selic Interest Rate+ 0.5% py Interest Rate+ 0.5% py Foreign currency – FC – N/A 13.Contracts 13.1.Loans and financing – R$ million Loans and financing By activity Generation By creditor Eletrobras 2014 2015 2016 2017 2018 2019 After 2019 Total 69,019 274,077 268,058 252,344 222,887 205,370 654,197 1,945,952 69,019 274,077 268,058 252,344 222,887 205,370 654,197 1,945,952 152 Marketletter 14.Number of employees (including requested employees from other Eletrobras companies/ excluding employees assigned to other Eletrobras companies) 14.1.By tenure Generation Composition of employees by tenure (Years) Up to 5 6 to 10 11 to 15 16 to 20 21 to 25 beyond 25 Total 1Q14 2Q14 3Q14 255 59 25 25 146 510 260 58 1 25 24 147 515 262 58 1 25 4 164 514 1Q14 2Q14 3Q14 50 52 7 2 2 10 123 50 52 7 2 2 9 122 52 53 7 3 1 13 129 Administration Composition of employees by tenure (Years) Up to 5 6 to 10 11 to 15 16 to 20 21 to 25 beyond 25 Total 14.2.By region State 1Q14 Rio Grande do Sul Number of employees 2Q14 637 637 1Q14 Number of employees 2Q14 3Q14 643 14.3.By departments Department Field Administrative 511 126 3Q14 515 122 514 129 15.Complementary work force Operational 1Q14 2Q14 559 558 3Q14 388 16.Turn-over - % 1Q14 2Q14 3.30 0.55 3Q14 0.55 153 Marketletter 2. Distribution Companies Net Operating Revenue Company (R$ million) Amazonas Energia Distribuição Alagoas Distribuição Piauí Distribuição Rondônia Distribuição Roraima Distribuição Acre Service Result Income/Loss for the Period (R$ million) (R$ million) EBITDA (R$ million) EBITDA Margin (%) 2014 2013 2014 2013 2014 2013 2014 2013 2014 2013 2,413 758 701 852 142 270 1,902 652 746 802 137 254 -56 -150 -25 35 -67 73 -240 -100 -82 -30 21 16 -939 -189 -88 3 -71 30 -624 -119 -137 -62 23 -23 21 -126 -2 60 -60 84 -127 -81 -60 -7 27 24 0.88 -16.66 -0.22 7.01 -42.37 30.97 -6.68 -12.41 -7.98 -0.86 20.01 9.63 Eletrobras System Distribution Company Extension of Distribution Lines Amazonas Energia Distribuição Acre Distribuição Alagoas Distribuição Piauí Distribuição Rondônia Distribuição Roraima Number of Clients assisted 44,492 19,297 40,794 87,308 57,698 3,503 860,545 239,653 1,008,015 1,133,744 575,364 101,559 Number of municipalities served Number of substations 62 22 102 224 52 01 54 15 41 83 57 03 Extension of Transmission Lines – Km Company Amazonas Generation and Transmission Companies Total Own SPEs (a) 673 61,412 62,085 (b) 3,458 3,458 Physical aggregation in 2014 Total (a+b) 1,178 1,178 673 64,870 65,543 Physical aggregation in 2014 Total (b) Company's participation in the enterprise Installed Capacity – MW Company Amazonas Energia Distribuição Rondônia Eletrobras Generation and Transmission companies Total Own SPEs (a) (b) 2,204 2,6 39,484 41,691 13 2,267 2,280 121 975 1,096 (a+b) 2,204 3 13 41,751 43,971 (b) Company's participation in the enterprise Energy sold – MWh* Amazonas Energia** Distribuição Acre Distribuição Alagoas Distribuição Piauí Distribuição Roraima Distribuição Rondônia Total 9M14 4,552,645 600,293 2,467,506 2,195,584 2,202,807 507,827 12,526,662 9M13 4,294,511 609,234 2,340,642 2,040,780 2,038,732 450,371 11,774,270 *Do not consider the “Own Consumption” amount. ** Do not consider the short term energy. 154 Marketletter Balance Sheet (R$ thousands) Financial Statements for Consolidation Purposes Asset Current Assets Availabilities Clients (Consumers and Resellers) Deferred fiscal asset (taxes and Contributions) Income Tax and Social Contributions Reimbursement rights - CCC (12,111 law) Linked Deposits Stored materials Others Current Assets Total . Non-current Assets Clients (Consumers and Resellers) Deferred fiscal asset (taxes and contributions) Reimbursement rights - CCC (12,111 law) Linked Deposits Financial asset – Annual allowed revenue (Transmission) Others Advance for equity participation INVESTMENT FIXED ASSETS INTANGIBLE ASSETS Non-current Assets total Assets total Consolidated 09.30.14 09.30.13 139,027 402,404 37,551 240,312 308,703 1,127,997 147,694 361,528 33,491 8,947,242 128,194 118,888 9,737,037 69,256 1,980,476 13,375,410 299,091 3,253,445 9,072 18,986,750 7,678 1,201,146 136,040 20,331,614 21,459,611 44,974 1,567,354 239,814 2,645,366 191,355 4,688,863 7,678 1,245,167 574,274 6,515,982 16,253,019 155 Marketletter Liabilities and Stockholders’ Equity Consolidated 09.30.14 09.30.13 Current Liability Suppliers Loans and Financing Taxes and Social Contribution Income Tax and Social Contribution Reimbursement Obligations- CCC (12,111 Law) Costumers advance Fuel Consumption Account - CCC Shareholders remuneration (dividends to pay) Estimated Obligations Provisions for contingencies Post-Employment Benefits (Complementary Pension Fund) Leasing Onerous Contracts Sector charges Incentive to Early Retirement Others Current Liability Total 7,965,935 910,205 32,623 1,659 70,690 1,332 192,579 134,396 9,309,419 4,479,547 433,433 42,241 6,981,540 55,117 1,098 176,056 509 24,377 168,920 12,362,838 Non-Current Liability Suppliers Loans and Financing Taxes and Social Contribution Income Tax and Social Contribution Reimbursement rights - CCC (12,111 Law ) Costumers advance Estimated obligations Provisions for contingencies Provision for Onerous Contracts Post-Employment Benefits (Complementary Pension Fund) Leasing Concessions to pay - UBP Sector charges (regulatory taxes) Other Comprehensive Income Advance for future capital increase Others Non-Current Liability Total 493,918 951,495 11,216,697 3,771 264,909 344,865 1,362 1,861,599 443,307 15,581,923 580,584 724,079 1,688,664 179,302 268,761 16,470 1,877,928 1,797 281,674 22,796 5,642,055 4,610,171 - 8,039,493 - 2,409 - 4,513,199 - 6,251,575 - 13,498 - - 3,431,731 - 1,751,874 21,459,611 16,253,019 Stockholders’ Equity Social Capital Capital Reserves Profit reserves Additional proposed dividend Acumulated profit/loss Other Comprehensive Income Non-Controlling shareholders participation Stockholders’ Equity Total Non-Current Liability and Stockholders’ Equity Total 156 Marketletter Statement of Income (R$ thousands) Consolidated 09.30.14 09.30.13 Operating Revenue Supply – Generation Short term electric energy Construction Plants Revenue Electric Energy Supply - Distribution Constructuion Revenue - Distribution Other Operating Revenues Deduction to Revenue Net Operating Revenue . Operating Costs Energy purchased for resale Charges on electric grid usage Construction Cost Fuel Operating Expenses Personnel, Material and Third-part related Service Remuneration and Reimbursement Depreciation and Amortization Donations and Contributions Provisions Others Operating Expenses . Operating Result before Financial Result . Financial Result Result before Income tax and Social Contribution . Current Income Tax and Social Contribution Deferred Income Tax and Social Contribution Net Profit of Period 826,118 1,135,812 51,879 448,606 229,903 202,499 -481,771 2,413,046 835,569 134,854 409,754 432,599 302,191 179,652 -392,615 1,902,004 -1,024,177 -40 -281,782 -111,078 -220,864 -711,945 -94,652 -466,303 -5,103 -77,343 -12,245 -491,019 -2,469,090 -460,420 -4,552 -112,570 -63,388 -473,309 -2,141,700 -56,044 -239,696 -883,185 -939,229 -384,160 -623,856 -939,229 -623,856 157 Marketletter Cash Flow (R$ thousands) Cash Flow 09.30.2014 09.30.2013 OPERATING ACTIVITIES Result before income tax and social contribution Depreciation and amortization Intangible Amortization – Distribution / Transmission Monetary and Exchange net variations Financing charges Equity Method Provision for uncovered liability Provision for credits of doubtful liquidation Provisions for contingencies Provision for staff realignment Provision for impairment of assets Provision for losses with onerous contracts Provision for Financial Asset loss Global reversal reserve charges Present value adjustment Minority Participation in Result Charges on shareholders funds Loss/Gain in asset disposal (sum to Others item) Financial asset revenue by IRR Derivative financial instruments Others Variation in operating assets / liabilities Net cash from operating activities -866,539 77,343 -1,097 360,319 -18,239 -23,391 27,221 281,093 -163,290 -623,856 112,570 -949 346,636 80,142 -42,928 132,220 500,244 504,079 Financing charges – payment Payment of charges of global reversal reserve Financial charges receivable Remuneration from equity participation Financial asset revenue by AAR Financial Asset on receiving indemnities Payment of income tax and social contribution Complementary pension fund payment Lawsuits payment Legal deposits Net cash from Operational activities -97,771 -28,878 -289,939 -67,199 -49,752 387,128 797,457 -145,992 651,465 253,198 -124,845 128,353 -7,255 -10,252 -289,648 -307,155 -29,040 -6,912 -722,502 -10 -758,464 54,371 -242,983 84,656 139,027 54,371 390,677 147,694 -242,983 FINANCING ACTIVITIES Loans and financing obtained Loans and financing payable - principal Payment of Shareholders remuneration Loans and financing amortization - principal Capital increase - receivable Others Net cash from financing activities INVESTMENT ACTIVITIES Fixed Asset acquisition Intangible acquisition Acquisition of Concession Asset Advance for future capital increase Acquisition of equity participation investment Others Net Cash from investment activities Increase (Decrease) in Cash and Cash Equivalents Cash and cash equivalents at beginning of the period – 12/31/13 Cash and cash equivalents at end of the period – 03/31/14 158 Marketletter Analysis of the result 3Q14 x 2Q14 The Company presented a net loss in 3Q14, 15.6% higher than that registered in the previous quarter, from R$ (251.7) million in 2Q14 for R$ (290.8) million in 3Q14, primarily due to the factors described below. Operating Revenue In generation: The electric energy supply in generation increased by 6.4%, from R$ 270.2 million in 2Q14 to R$ 287.5 million in 3Q14 due to the increase in the volume of energy traded. The short-term electricity decreased by 45.5%, from R$ 563.5 million in 2Q14 to R$ 307.4 million in 3Q14, mainly due to reduced energy traded in settlement (PLD). In distribution: The supply of electric energy in distribution increased by 13.1%, from R$ 148.9 million in 2Q14 to R$ 168.4 million in 3Q14, primarily due to increased volume of energy traded. Operating Expenses The expenses with personnel, material and services presented an increase of 6.9%, from R$ (147.9) million in 2Q14 to R$ (158.2) million in 3Q14, primarily due to increased personnel expenses and third-part related services. The electricity purchased for resale decreased by 67.5% from R$ (542.6) million in 2Q14 to R$ (176.1) million in 3Q14, due mainly due to the reduction of financial exposure to short-term market and the lowest value of the PLD. The expenses with fuel increased by 50.2%, from R$ (21.1) million in 2Q14 for R$ (31.8) million in 3Q14, primarily due to higher thermal generation. The operational provisions had increased 255%, from a reversal of R$ 41.1 million in 2Q14 to a provision of R$ (65) million in 3Q14, mainly due to non-payment of electricity purchased for resale from independent producers. Financial Result The debt charges had increased by 16.0%, from R$ (38.2) million in 2Q14 to R$ (44.3) million in 3Q14, mainly due to loan agreement with Eletrobras in 3Q14. The charges from leasing decreased by 25.7%, from R$ (68.4) million in 2Q14 to R$ (50.8) million in 3Q14, mainly due to the IGP-M. The others financial income decreased by 31.3%, from R$ 31.6 million in 2Q14 to R$ 21.7 million in 3Q14, mainly due to the reduction of fines over electric energy sales. The other financial expenses increased 36.8%, from R$ (209.2) million in 2Q14 to R$ (286.1) million in 3Q14, mainly due to the fine related to delays along Cigás. 159 Marketletter Market Data 1.Generation Assets and Energy generated Own assets Unit Parintins Itacoatiara Manacapuru Barreirinha Coari Maués HuMaytá Urucará Benjamin Constant Tefé Manicoré Autazes Codajás Eirunepé Nova O. do Norte Atalaia do Norte Barcelos Lábrea São P. de Olivença Santo Antônio do Içá Carauari Fonte Boa Boca do Acre São G. da Cachoeira Itapiranga Anori Silves Augusto Montenegro Nhamundá Tabatinga Novo Aripuanã Borba Santa I.do Rio Negro Jutaí Novo Airão Ipixuna Envira Cucuí Japurá Maraã Juruá Tapauá Canutama Pauini Careiro Amaturá Estirão do Equador Palmeiras Ipiranga Vila Bittencourt Iauaretê São S. do Uatumã Tonantins Alvarães Beruri Caapiranga Uarini Urucurituba Fuel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 Intalled Capacity (MW) 33.16 34.83 28.93 3.71 20.85 12.43 15.37 4.67 7.32 18.2 7.67 6.07 7 10.62 6.52 1.19 4.87 9.54 3.79 3.22 7.18 6.23 8.22 8.42 3.06 4.16 2.5 0.6 4.58 15.43 5.69 3.6 2.42 6.18 5.27 3.04 3.38 0.57 0.18 3.69 2.49 3.71 2.23 2.62 2.5 1.8 0.72 0.72 0.42 0.57 1 2.64 3.46 2.72 2.97 2.06 1.94 2.84 Guaranteed Energy (MW average) 10.083 6.328 10.868 0.729 7.572 3.822 4.661 1.484 2.549 6.783 2.489 1.753 1.653 1.996 1.996 0.05 1.367 2.611 0.986 1.04 2.036 1.662 2.538 3.021 0.985 1.073 0.498 0.055 0.961 5.336 1.584 1.851 0.676 1.182 1.206 0.597 0.856 0.073 0.044 0.628 0.462 1.155 0.613 0.698 0.859 0.446 45.207 0.053 0.054 0.068 0.178 0.638 0.944 0.641 0.756 0.493 0.615 0.787 Energy Generated (MWh) 1Q14 25,635 22,865 0 2,935 19,607 9,597 12,494 3,272 6,834 17,844 6,139 5,907 2,886 4,876 4,942 0 3,511 7,470 2,510 2,776 5,380 3,781 6,647 7,992 2,361 1,215 1,712 175 2,562 12,973 3,972 4,874 1,726 2,794 3,441 1,499 2,380 200 137 1,805 1,335 2,914 1,519 1,878 1,783 1,189 108 92 118 138 197 1,526 1,799 1,950 2,171 2,637 1,885 2,755 2Q14 26,634 24,636 0 3,043 21,982 10,180 12,460 3,399 7,180 18,513 6,989 5,734 4,580 5,456 5,242 0 3,644 7,740 2,650 2,959 5,699 3,684 7,024 8,261 2,434 2,892 1,773 181 2,783 14,030 4,052 5,244 1,798 2,839 3,735 1,690 2,432 243 141 2,100 1,546 3,493 1,621 2,022 1,942 1,323 142 99 134 132 239 1,536 2,041 2,138 2,510 2,001 2,073 2,835 3Q14 30,285 29,572 0 3,483 23,591 11,304 14,435 3,915 7,157 20,513 7,489 6,137 4,952 5,456 5,862 0 3,994 8,084 2,732 3,156 5,818 4,044 7,302 7,941 2,768 3,375 1,867 182 3,360 14,497 4,645 5,671 1,861 3,259 4,037 1,774 2,462 219 161 2,258 1,594 3,969 1,766 2,111 1,977 1,407 138 107 114 132 254 1,714 2,059 2,165 2,660 2,191 2,091 3,035 160 Marketletter Unit Pedras Anamã Itamarati Castanho Rio Preto da Eva Limoeiro Boa Vista do Ramos Manaquiri Caviana Campinas Caiambé Murituba Apuí Mocambo Belém do Solimões Itapeaçú Caborí Cametá Sacambú Novo Remanso Tuiué Jacaré Novo Céu Zé Açú Vila Amazônia Terra Nova Axinim Vila Urucurituba Arara Feijoal Lindoia Moura Santana Sucunduri Carvoeiro Itapuru Betânia Vila de Matupí Auxiliadora Tamaniquá Santa Rita Well Parauá Belo Monte Vila de Alterosa Camaruã UHE Balbina UTE Aparecida UTE Mauá UTE Electron UT CO Cidade Nova UT AS São José UT FO Flores UTE Distrito UTE Iranduba Total Fuel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel Biodiesel BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 BS1800 Água OCTE, GN Bloco 1 - OC1A / Bloco 3 Gás Natural (Alternativo OCTE) / Bloco4 – OPGE / Bloco 5 – Biodiesel / Bloco 6 – Biodiesel / Bloco 7 - Biodiesel OCTE Diesel/Biodiesel Diesel/Biodiesel Diesel/Biodiesel Biodiesel (B S1800) Diesel/Biodiesel Intalled Capacity (MW) Guaranteed Energy (MW average) 0.57 1.73 2.56 12.72 11.21 1.79 2.31 3.01 0.58 0.43 0.88 0.3 7.19 0.89 0.84 0.85 0.78 0.612 0.448 4.06 0.71 0.34 1 0.102 0.54 0.405 4.195 3.389 0.335 0.738 1.118 0.122 0.06 0.121 0.033 1.381 0.188 0.213 0.153 0.095 0.136 0.064 1.331 0.096 0.164 0.404 2.08 0.341 0.66 0.38 0.332 0.778 1 0.52 0.31 0.16 0.33 0.31 0.43 1.85 0.468 0.468 0.62 0.568 0.246 0.33 0.107 0.059 0.052 0.062 0.304 0.065 0.051 0.048 0.016 0.02 0.111 0.619 0.079 0.079 0.183 0.096 0.044 0.067 277.5 282.5 Energy Generated (MWh) 1Q14 2Q14 3Q14 132.3 150.0 291 785 1,270 12,166 9,633 1,005 2,571 3,290 329 176 386 73 3,521 0 438 0 755 0 225 4,455 276 569 1,740 0 1,285 0 307 148 142 210 888 158 116 128 44 67 264 1,907 239 65 512 224 114 225 101 283,428 295,750 321 1,826 1,371 13,163 10,126 1,009 2,714 3,707 344 198 399 78 4,097 0 448 0 828 0 236 4,849 341 589 1,740 0 1,227 0 333 150 159 265 1,035 166 139 159 48 83 235 1,993 247 65 510 245 117 260 103 251,959 301,358 332 1,935 1,427 13,536 10,807 1,062 2,828 3,969 348 219 388 77 4,341 0 438 0 910 0 252 4,839 308 769 1,740 0 1,455 0 302 150 159 236 1,070 197 152 189 51 91 270 2,295 275 63 469 242 124 253 116 437,394 302,117 738.1 311.0 398,686 369,361 407,293 121.1 29.6 73.4 124.7 51.3 66.6 2,204.22 18.0 19.4 47.5 78.3 38.3 47.1 1,012.0 809 13,839 40,054 78,129 36,129 40,323 1,493,966 4,339 20,285 45,019 104,490 45,778 62,150 1,528,095 18,288 17,521 34,389 84,677 31,119 47,607 1,729,862 161 Marketletter Unit Parintins Itacoatiara Manacapuru Barreirinha Coari Maués HuMaytá Urucará Benjamin Constant Tefé Manicoré Autazes Codajás Eirunepé Nova Olinda do Norte Atalaia do Norte Barcelos Lábrea São Paulo de Olivença Santo Antônio do Içá Carauari Fonte Boa Boca do Acre São Gabriel da Cachoeira Itapiranga Anori Silves Augusto Montenegro Nhamundá Tabatinga Novo Aripuanã Borba Santa Isabel do Rio Negro Jutaí Novo Airão Ipixuna Envira Cucuí Japurá Maraã Juruá Tapauá Canutama Pauini Careiro Amaturá Estirão do Equador Palmeiras Ipiranga Vila Bittencourt Iauaretê São Sebastião do Uatumã Tonantins Alvarães Beruri Caapiranga Uarini Urucurituba Pedras Anamã Itamarati Castanho Rio Preto da Eva Limoeiro Boa Vista do Ramos Location (State) Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Beginning of Operation Dec/65 Sep/66 Jan/67 Jun/67 Sep/67 Dec/67 Jul/68 Jun/68 Aug/68 Aug/68 May/69 Jun/69 Sep/69 Sep/69 Oct/69 Mar/70 Jul/70 Aug/70 Jan/71 Jan/71 Jan/71 Jan/71 Feb/71 Mar/71 Oct/71 Oct/71 Oct/71 Oct/71 Nov/71 Nov/71 Jun/72 May/72 Oct/72 May/72 Jul/73 Jul/73 Aug/73 Oct/73 Oct/73 Oct/73 Oct/73 Dec/73 Dec/73 Sep/74 Sep/74 Nov/74 Dec/74 Dec/74 Jan/75 Dec/75 Apr/75 Apr/75 Apr/75 May/75 Dec/75 Jan/75 Feb/76 Jan/75 Aug/76 Jan/76 Feb/76 Dec/79 Jun/04 Nov/82 Mar/86 End of Operation Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined 162 Marketletter Location (State) Unit Manaquiri Caviana Campinas Caiambé Murituba Apuí Mocambo Belém do Solimões Itapeaçú Caborí Cametá Sacambú Novo Remanso Tuiué Jacaré Novo Céu Zé Açú Vila Amazônia Axinim Vila Urucurituba Arara Feijoal Lindoia Moura Santana Sucunduri Carvoeiro Itapuru Betânia Vila de Matupí Auxiliadora Santa Rita Well Parauá Belo Monte Vila de Alterosa UHE Balbina UTE Aparecida UTE Mauá UTE Electron UT CO Cidade Nova UT AS São José UT FO Flores UTE Distrito UTE Iranduba Beginning of Operation Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Amazonas Jun/84 Jul/86 Jul/86 Aug/76 Aug/86 Sep/86 Mar/87 Mar/87 Mar/87 Sep/92 Sep/92 Dec/92 Aug/98 Sep/98 Aug/98 Aug/98 Sep/98 Sep/98 Oct/98 May/99 Apr/00 Feb/00 Jul/00 Apr/04 Jul/05 Oct/06 Mar/06 Oct/10 Jul/06 Aug/06 Oct/06 Nov/06 Sep/03 Oct/06 Oct/06 Jan/89 Feb/84 Apr/73 Jun/05 Aug/08 Feb/08 Aug/08 Oct/10 Nov/10 End of Operation Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined Mar/27 Undefined Undefined Undefined Undefined Undefined Undefined Undefined Undefined 2. Electric energy purchased for resale System Eletrobras (Guajará) Others (PIE'S-Independent Producer.- Self producer) Total Unit MWh R$ million MWh R$ million MWh R$ million 1Q14* 1,490 3,1 673,823 21,7 675,313 24,8 2Q14* 3Q14 1.471 690.572 24,3 692,043 24,3 1.566 -1,5 687.838 26,7 689,404 25,2 *Do not include the energy traded on short term market 163 Marketletter 3 .Energy sold 1Q14 Distribution to 2Q14 3Q14 R$ million MWh R$ million 124,0 80,1 460.793 443.444 127,0 78,3 479.342 427.642 173,5 104,4 531.763 463.765 76,9 301.043 81,4 320.395 107,2 344.854 3,0 29,0 4,8 8,5 264,9 591,20 19.924 132.084 32.905 51.237 567.433 2,008,863.00 3,0 32,2 6,5 8,1 563,5 900,00 19.643 149.118 43.908 49.312 644.979 2,134,339.00 3,8 43,8 8,1 10,3 307,4 758,50 20.172 167.182 44.603 49.516 438.137 2,059,992.00 Residential Industrial Commercial, Service and Other Activities Rural Public Utilities Public Ilumination Public Service CCEE Others Total MWh R$ million MWh 4. Number of Consumer Units Serviced 1Q14 2Q14 3Q14 837,609 848,613 860,545 5. Network Expansion - number of new connections 1Q14 2Q14 3Q14 14,765 6,968 3,876 1Q14 2Q14 3Q14 54 54 54 6. Substations 7. Fuel used to produce electricity Type Unit Diesel oil Litre Amount 1Q14 R$ Million 100,773,392 960.5 Amount 2Q14 3Q14 R$ Million R$ Million Amount 1,074.3 92,334,839.90 152,682,088 1,026.1 8. Losses - % 1Q14 Technical 2.44 2Q14 Commercial Commercial Technical 35.42 1.5 37.08 Extension (km) Tension (kV) Technical 1.00 3Q14 Commercial 39.20 9. Extension of transmission lines From-To Balbina–Cristiano Rocha Manaus–Cristiano Rocha Ramal de Transmissão–Presidente Figueiredo Balbina – Manaus I Balbina – Balbina – Circuito 1 Balbina – Balbina – Circuito 2 Balbina – Balbina – Circuito 3 Balbina – Balbina – Circuito 4 Balbina – Balbina – Circuito 5 158.513 22.704 0.124 180.344 0.590 0.635 0.635 0.680 0.680 230 230 230 230 230 230 230 230 230 Beginning of Operation End of Concession Nov/06 Nov/06 Sep/08 May/89 Feb/89 Apr/89 Apr/89 Sep/89 Jul/89 Mar/27 Mar/27 Mar/27 Mar/27 Mar/27 Mar/27 Mar/27 Mar/27 Mar/27 164 Marketletter Subtransmition Line Extension (Km) Tension (kV) Beginning of Operation End of Concession Manaus I – São José Manaus I – Mauá Manaus I – Distrito I – Circuito 1 Manaus I – Distrito I – Circuito 2 Manaus I – V8 – Circuito 1 Manaus I – V8 – Circuito 2 Manaus I – Cachoeirinha Manaus I – Seringal Mirim – Circuito 1 Manaus I – Seringal Mirim – Circuito 2 Manaus I– Flores – Circuito 1 Manaus I – Flores – Circuito 2 Manaus I – Flores – Circuito 3 Manaus I – Cidade Nova Manaus I – Santo Antônio Flores – Redenção Redenção – Ponta Negra Flores – Ponta Negra Aparecida – Ponta Negra Aparecida – Seringal Mirim Aparecida – Cachoeirinha Aparecida – El Paso Mauá – Distrito I – Circuito 1 Mauá – Distrito I – Circuito 2 Mauá – Distrito II – Circuito 1 Mauá – Distrito II – Circuito 2 Mauá – Marapatá Marapatá – Cachoeirinha Mauá – Cidade Nova Mauá – Mauá Geração – Circuito 1 Mauá – Mauá Geração – Circuito 2 Mauá – El Paso Mauá Geração – São José Mauá Geração – Consumidores Especiais Eletro – Cachoeirinha Distrito I – Consumidores Especiais Distrito II – Cachoeirinha – Circuito 1 Distrito II – Cachoeirinha – Circuito 2 Seringal Mirim – Cachoeirinha Santo Antônio – Sivam Ponta Do Ismael – Iranduba Flores – Ambev Iranduba – Manacapuru Total 7.285 11.815 4.685 4.682 1.160 1.160 6.112 6.649 7.277 4.460 4.565 4.810 7.463 9.516 1.469 4.515 5.959 8.610 3.796 3.994 0.153 7.481 6.728 4.122 4.107 6.489 2.894 26.016 0.533 0.226 0.200 8.924 9.362 0.357 7.723 7.421 7.830 3.980 5.326 18.043 0.161 70.000 308.058 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 Feb/01 Oct/91 Oct/91 Nov/06 Oct/91 Oct/91 Jul/92 Sep/97 Oct/97 Feb/89 Nov/01 Dec/07 Jan/96 Apr/05 Nov/08 Nov/08 Dec/07 Jul/83 Feb/97 Apr/05 Nov/99 Apr/77 Apr/99 Nov/97 Apr/04 Nov/11 Nov/11 Aug/06 Feb/04 Feb/04 Mar/04 Mar/04 Jul/04 Jan/81 Mar/96 Nov/97 Sep/11 Feb/97 Mar/95 Jun/06 Mar/03 Aug/12 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 Jul/15 9.1. Extension of distribution lines – 09.30.14 1Q14 44,420 2Q14 44,462 3Q14 45,492 10. DEC - Duration of interruptions - in hours 1Q14 2Q14 3Q14 13.28 14.61 16.37 11. FEC – Frequency of interruptions – Number of outages 1Q14 2Q14 3Q14 8.72 10.31 10.39 165 Marketletter 12. TMA – Average response time – in minutes 1Q14 2Q14 3Q14 296.01 257.95 282.28 13. Average price– R$/MWh 1Q14 2Q14 3Q14 277.64 278.10 278.32 14. Main investments – R$ million Project 1Q14 Distribution Extension of Urban distribution “Light for All” Program Maintenance of the distribution system Maintenance of the urban network Others (infrastructure) Generation Total 68,64 22,96 24,94 9,67 11,07 2,89 0.79 72,32 2Q14 3Q14 Budget 2014 73,71 28,67 29,18 6,85 9,01 1,88 0.46 76,05 62,86 20,10 25,92 8,90 7,92 6,43 0.43 69,72 733,36 319,11 173,44 150,17 90,64 24,47 16,26 774,09 15. New Investments 15.1. Generation 15.1.1. Own assets Unit Location (State) Total of Investment (R$ million) Amount invested (R$ million) TEU Mauá 3 Amazonas 1,114.33 527.4 Installed Capacity (MW) Open Comb. cycle cycle 379.76 589.61 Assured Energy (MW average) Open Comb. cycle cycle 375.0 570.4 Beginning of Operation Open Comb. cycle cycle Sep/15 May/16 Beginning of Construction Sep/12 16. Loans and financing – R$ million Creditor Eletrobras Balance 03.31.14 1,455.7 Balance 06.30.14 1,435.7 Balance 09.30.14 1,861.7 Due Date Index 01/2024 RGR 166 Marketletter 17. Contract obligations – 09.30.14 2014 Loans and financing R$ million Energy Purchase Contracts R$ million MWh 2015 910,2 2014 584,173 2,680,881.17 72,2 2015 614,514 2,671,800.00 2016 206,7 2016 642,989 2,679,120.00 2017 213,8 2017 694,668 2,671,800.00 2018 146,6 2018 721,386 2,671,800.00 After 2018 312,2 After 2018 5,357,085 13,592,305.00 18. Default – more than 90 days – 09.30.14 Class R$ State utilities Industrial Residential Commercial Rural Public Utilities Public Ilumination Public Service Others Total 19.Number of employees 19,203,369.19 25,937,817.52 13,462,467.69 2,195,755.20 16,462,608.52 989,482.09 18,736,418.85 2,357.15 96,990,276.21 (including requested employees from other Eletrobras companies/ excluding employees assigned to other Eletrobras companies) 19.1.By tenure Generation and transmission Composition of employees by tenure (Years) Up to 5 6 to 10 11 to 15 16 to 20 21 to 25 beyond 25 Total 1Q14 76 298 80 124 114 208 900 2Q14 47 257 71 186 116 229 906 3Q14 21 283 56 197 119 231 907 Distribution Composition of employees by tenure (Years) Up to 5 6 to 10 11 to 15 16 to 20 21 to 25 beyond 25 Total 1Q14 73 229 55 81 72 185 695 2Q14 3Q14 45 229 23 87 107 202 693 26 246 13 94 103 209 691 167 Marketletter Administration Tenure (years) Up to 5 6 to 10 11 to 15 16 to 20 21 to 25 Beyond 25 Total 1Q14 2Q14 3Q14 56 204 41 52 64 132 549 110 239 6 36 37 105 533 60 279 3 34 40 108 524 1Q14 Number of employees 2Q14 3Q14 2,144 2,132 2,122 1Q14 Number of employees 2Q14 3Q14 19.2. By region State Amazonas 19.3. By departments Department Field Administrative 1,595 549 1,599 533 1,598 524 20.Complementary work force Operational 1Q14 2Q14 3Q14 1,740 1,740 1,740 21.Turn-over - % 1Q14 2Q14 3Q14 0.37 0.61 0.19 168 Marketletter Balance Sheet (R$ thousands) Financial Statements for Consolidation Purposes Asset 09.30.14 09.30.13 24,587 69,662 8,373 544 5,880 462 1,782 27,610 138,900 87,767 42,425 10,380 101,911 515 3,133 26,681 272,812 INVESTMENT FIXED ASSET INTANGIBLE 19,533 2,929 245,616 5,516 302,627 86 576,307 6,458 38,874 13,516 3,568 17,869 332,534 367,487 7,114 54,543 Non-Current Asset Total Total Asset 621,639 760,539 429,144 701,956 Current Assets Availabilities Clients (Consumers and Resellers) Deferred Fiscal Assets (taxes and Contributions) Income Tax and Social contributions Reimbursement rights – CCC (12,111 law) Linked Deposits Stored material Others Current Total Non-current Assets Clients (Consumers and Resellers) Deferred Fiscal Assets (Taxes and Contributions) Reimbursement rights – CCC (12,111 law) Linked Deposits Financial Asset – Annual allowed Revenue (Transmission) Others Advance to equity participation 169 Marketletter Liabilities and Stockholders Equity 09.30.14 09.30.13 Current Liability Suppliers Loans and financings Bonds Taxes and social contributions Income tax and Social Contribution Reimbursement Obligations – CCC (12,111 law) Advance to clients Remuneration to shareholders (dividends to pay) Estimated obligations Provisions for Contingencies Post-employment benefit (Complementary Pension Fund) Leasing Onerous Contracts Sectorial Charges (regulatory taxes) Incentive to personnel retiremnt Others Current Liability Total 54,133 66,080 18,630 7,155 552 31,760 10,941 189,251 260,868 34,798 13,460 5,400 1,389 31,059 12,984 14,325 374,283 Non-current Liability Suppliers Loans and financings Taxes and social contributions Income tax and Social Contribution Derivatives Reimbursement Obligations – CCC (12,111 law) Advance to clients Estimated obligations Provisions for Contingencies Post-employment benefit (Complementary Pension Fund) Sectorial Charges (regulatory taxes) Advance for future capital increase Incentive to personnel retiremnt Others Non-current Liability Total 213,217 154,100 6,872 122,422 10,576 314 12,787 113 520,401 109,368 60,538 2,451 3,784 230,631 956 107 407,835 475,789 - 424,902 - 245,158 4,277 - 329,597 - 50,887 760,539 - 80,162 701,956 Stockholders Equity Social capital Capital reserves Profit Reserves Additional Proposed Dividend Accured losses/profit Other comprehensive Income Non-controlling shareholders participation Stockholders Equity Total Liabilities and Stockholders’ Equity Total 170 Marketletter Statement of Income (R$ thousands) Operating Revenue Electric Energy Supply - Distribution Construction Revenue - Distribution Other Operating Revenue Deductions to Revenue Net Operating Revenue Operating Costs Electric Energy purchased for resale Construction Cost Operating Expenses Personnel, Material and third-part related Service Charges on electric network usage Depreciation and Amortization Donations and Contributions Provisions Others Operating Costs and Expenses Operating Result before Financial Result Financial Result Result before Income tax and Social Contribution Current Income tax and Social Contribution Deferred Income tax and Social Contribution Net Result of the period 09.30.14 09.30.13 336,830 34,816 2,414 -103,843 270,217 293,357 41,744 11,919 -93,129 253,891 -96,014 -34,816 -102,999 -41,744 -63,276 -1,865 -10,370 17,420 -7,974 -196,895 73,322 -43,514 29,808 29,808 -67,075 -1,745 -8,339 -28,130 12,243 -237,789 16,102 -38,523 -22,421 -114 -302 -22,837 171 Marketletter Cash Flow (R$ thousands) Cash Flow OPERATING ACTIVITIES Result before income tax and social contribution Depreciation and amortization Intangible Amortization – Distribution / Transmission Monetary and Exchange net variations Financing charges Equity Method Provision for uncovered liability Provision for credits of doubtful liquidation Provisions for contingencies Provision for staff realignment Provision for impairment of assets Provision for losses with onerous contracts Provision for Financial Asset loss Global reversal reserve charges Present value adjustment Minority Participation in Result Charges on shareholders funds Loss/Gain in asset disposal (sum to Others item) Financial asset revenue by IRR Derivative financial instruments Others Variation in operating assets / liabilities Net cash from operating activities Financing charges – payment Payment of charges of global reversal reserve Financial charges receivable Remuneration from equity participation Financial asset revenue by AAR Financial Asset on receiving indemnities Payment of income tax and social contribution Complementary pension fund payment Lawsuits payment Legal deposits Net cash from Operational activities FINANCING ACTIVITIES Loans and financing obtained Loans and financing payable - principal Payment of Shareholders remuneration Refinancing of taxes and contributions payment - principal Capital increase - receivable Others Net cash from financing activities INVESTMENT ACTIVITIES Fixed Asset acquisition Intangible Asset acquisition Concession Asset Acquisition Advance for future capital increase Acquisition of equity participation investment Others Net Cash from investment activities Increase (Decrease) in Cash and Cash Equivalents Cash and cash equivalents at beginning of the period – 12/31/13 Cash and cash equivalents at end of the period – 03/31/14 09.30.2014 09.30.2013 21,489 10,370 32,125 13,554 -8,073 2,577 -3,556 5,924 -78,624 -4,214 -33,367 8,339 31,180 9,537 15,388 -1,881 -3 70,583 99,776 -6,192 -10,406 -9,537 -416 89,823 74,175 -17,590 56,585 20,556 -28,564 -8,008 -932 -1,519 -37,231 -8 -39,690 -1,134 -3,996 -40,961 -46,091 6,489 35,724 18,098 24,587 6,489 52,043 87,767 35,724 172 Marketletter Analysis of the result 3Q14 x 2Q14 The Company presented in the 3Q14 net income 12.1% higher than that recorded in the previous quarter, from R$ 6.2 million in the 2Q14 for R$ 7.0 million in the 3Q14, primarily due to the factors described below. Operating Revenue The supply of electricity increased by 0.6%, from R$ 115.4 million in the 2Q14 for R$ 116 million in the 3Q14, not generating significant impacts on the company's results. Operating Expenses Personnel expenses, materials and third party services decreased by 27.6%, from R$ (27.8) million in the 2Q14 for R$ (20.2) million in the 3Q14, mainly due to salary adjustments arising from the collective bargaining in 2014. Electricity purchased for resale increased by 14.2%, from R$ (23.6) million in the 2Q14 for R$ (27) million in the 3Q14, due primarily to an increase in PLD. Operational provisions decreased by 109.3%, from a provision of R$ (2.2) million in the 2Q14 for a reversal of R$ 0.2 million in the 3Q14, primarily due to the reversal of the provision related to ICMS. Other operating expenses decreased by 73.8%, from R$ (5.2) million in the 2Q14 for R$ (9.1) million in the 3Q14, main ly due to the realization of ICMS installment contract. Financial Results Net monetary decreased by 177.5%, from an expense of R$ (5.2) million in the 2Q14 to an expense of R$ (14.3) million in the 3Q14, mainly due to the update of outstanding bills from the supplier of diesel. Other financial expenses decreased by 90%, from R$ (8.2) million in the 2Q14 for R$ (0.8) million in the 3Q14, mainly due to the return of funds, resulting from violation of indicators in the period, for the company's clients. 173 Marketletter Market Data 1. Generation Assets and Energy generated – N/A 2. Electric energy purchased for resale System Unit MWh R$ million MWh R$ million MWh R$ million MWh R$ million Eletrobras (SIN) Eletrobras Eletronorte Others Total 1Q14 2Q14 53,182 2,473 124,665 18,994 84,534 15,047 262,381 36,515 55,043 2,830 129,028 21,766 87,493 17,218 271,564 47,780 3Q14 SIN – National Interconected System 3. Energy sold 1Q14 R$ million Distribution to Residential Industrial Commercial, servicess and others activities Rural State Utilities Public Ilumination Public Service Own Consumption Others Total MWh 2Q14 R$ million MWh 3Q14 R$ million MWh 56,98 4,54 99,884 11,360 53,04 4,59 97,433 11,009 57,90 4,33 98,764 9,468 27,24 48,847 25,86 46,584 28,37 50,020 3,67 12,71 3,19 2,38 0,12 0,62 111,45 9,975 26,908 8,692 8,273 302 1,601 215,842 3,36 13,62 4,01 2,30 0,17 0,53 107,48 10,592 27,810 11,599 7,943 290 1,586 214,846 4,23 15,77 3,58 2,43 0,18 0,61 117,4 10,371 29,776 10,919 9,014 294 1,885 170,491 4. Number of Consumer Units Serviced 1Q14 2Q14 3Q14 234,677 237,728 239,647 5. Network Expansion - number of new connections 1Q14 2Q14 3Q14 2,965 2,885 1,893 1Q14 2Q14 3Q14 15 15 15 6. Substation 174 Marketletter 7. Fuel for production of electric energy Type Unit Diesel Total: Litre 1Q14 Amount R$ million Amount 12,836,029 12.836.029 40,01 40,01 13,334,861 13,334,861 2Q14 R$ million 41,32 41,32 3Q14 Amount R$ million 13,929,975 13,929,975 42,58 42,58 8. Losses - % 1Q14 Technical Commercial Technical 9.85 13.65 9.85 2Q14 Commercial 13.05 3Q14 Technical Commercial 9.85 13.54 9. Extension of distribution lines – 09.30.14 1Q14 2Q14 3Q14 19.017 19.248 19.297 1Q14 2Q14 3Q14 24.61 13.82 11.44 10. DEC - Duration of interruptions - in hours 11. FEC – Frequency of interruptions – Number of outages 1Q14 2Q14 3Q14 11.26 9.33 9.63 12. TMA – Average response time – in minutes 1Q14 2Q14 3Q14 649.51 441.06 365.46 13. Average price– R$/MWh 1Q14 2Q14 3Q14 516.35 500.27 532.40 175 Marketletter 14. Main investments – R$ thousand Project 1Q14 Distribution Rural Distribution Network Expansion Light for All Urban Distribution Network Expansion Distribution System Maintenance Energy in Isolated Systems Modernization and Adequacy of Commercial and Distribution System Others Asset Maintenance Total 2Q14 3Q14 10,532 7,460 15,181 2014 budget 149,321 1,288 1,105 2,096 46,058 3,932 3,515 - 3,376 901 - 3,233 3,229 - 51,809 21,308 - 1,797 2,078 6,623 30,145 2,002 2,002 12,534 894 894 8,354 487 488 15,668 8,941 8,941 158,262 15. New Investments – N/A 16. Loans and financing – R$ thousand Creditor Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Eletrobras Total Balance 03.31.14 Balance 06.30.14 675,293.51 15,257,000.00 15,778,049.00 1,189,122.20 490,000.00 35,551,615.70 11,733,463.40 8,662,861.80 9,321,670.93 12,675,829.62 11,500,000.00 12,055,255.32 7,666,666.62 3,710,020.70 10,703,878.08 3,782,090.53 1,708,887.78 373,264.48 2,036,802.71 3,382,140.66 53,844.91 168,307,757.95 675,293.51 15,257,000.00 2,358,149.00 15,778,049.00 1,168,620.09 490,000.00 34,184,245.87 10,951,232.50 8,408,071.75 9,047,504.14 11,830,774.30 11,250,000.00 12,235,567.01 7,499,999.95 3,400,852.30 9,730,798.26 3,438,264.16 1,025,332.66 1,745,830.87 3,163,938.03 16,153.48 163,655,676.88 Balance 09.30.14 675,293.51 52,000,000.00 15,257,000.00 15,778,049.00 1,168,620.09 508,887.02 34,184,245.87 10,951,232.50 8,408,071.75 9,047,504.14 11,196,982.81 11,250,000.00 13,050,097.10 7,499,999.95 3,168,976.00 9,000,988.38 3,180,394.36 512,666.32 1,527,601.99 3,000,286.08 211,366,897.39 Due Index 2015 2019 2018 2019 2018 2019 2018 2019 2017 2017 2019 2018 2019 2018 2018 2017 2017 2014 2014 2016 2018 2014 R$ R$ R$ R$ R$ R$ R$ R$ R$ R$ RGR R$ IPCA R$ RGR RGR R$ R$ R$ R$ R$ R$ 17. Contract obligations – 09.30.14 Loans and financing R$ million Energy Purchase Contracts R$ million MWh 2014 2015 2016 2017 N/A N/A N/A N/A 2014 2015 2016 2017 167,120 1,086,257 107,149 1,034,694 152,888 1,477,242 175,171 1,691,386 2018 N/A 2018 183,919 1,692,950 After 2018 N/A After 2018 2,758,780 25,394,248 176 Marketletter 18. Default – more than 90 days – 09.30.14 Class R$ million State utilities Industrial Residential Commercial Rural Poder Público Iluminação Pública Serviço Público Others Total 19. Number of employees 3,6 24,4 11,0 4,6 11,9 6,51 0.67 62,68 (including requested employees from other Eletrobras companies/ excluding employees assigned to other Eletrobras companies) 19.1 By tenure Distribution Composition of employees by tenure (Years) Up to 5 6 to 10 11 to 15 16 to20 21 to 25 beyond 25 Total 1Q14 2Q14 75 39 17 43 174 75 39 17 43 174 3Q14 74 39 17 43 173 Administration Composition of employees by tenure (Years) Up to 5 6 to 10 11 to 15 16 to20 21 to 25 beyond 25 Total 1Q14 2Q14 3Q14 46 23 9 22 100 46 23 9 22 100 45 22 9 21 97 19.2.By region State Acre Number of employees 1Q14 2Q14 3Q14 274 274 270 177 Marketletter 19.3.By departments Number of employees Department Field Administrative 1Q14 2Q14 3Q14 101 173 101 173 97 173 2Q14 3Q14 20. Complementary work force 1Q14 Operational 49 49 272 21. Turn-over - % 1Q14 2Q14 3Q14 2.18 2.18 0.36 178 Marketletter Balance Sheet (R$ thousands) Financial Statements for Consolidation Purposes Assets Current Assets Availabilities Clients (Consumers and Resellers) Marketable Securities Fiscal Asset Deferred (taxes and Contributions) Reimbursement Right – CCC (12,111 law) Linked Deposits Stored Materials Other Current Assets Total Non-Current Assets Clients (Consumers and Resellers) Fiscal Asset Deferred (taxes and Contributions) Reimbursement Right – CCC (12,111 law) Linked Deposits Financial Asset Other Advance for equity participation INVESTMENT FIXED ASSET INTANGIBLE Non-Current Assets Total Assets Total 09.30.14 09.30.13 14,478 235,088 26,233 13,570 28,236 5,152 99,622 422,379 23,392 229,216 9,444 5,836 49,067 316,955 187,339 5,053 51,985 648,559 564 893,500 168 22,298 20,381 936,347 1,358,726 145,915 5,808 40,903 644,307 3,957 840,890 168 23,832 4,863 869,753 1,186,708 179 Marketletter Liabilities and Stockholders’ Equity 09.30.14 09.30.13 Current Liabilities Suppliers Loans and financing Taxes and social contributions Income tax and Social Contribution Derivatives Reimbursement obligations – CCC (12,111 law) Advance from clients Remuneration to Shareholders (dividends to pay) Estimated obligations Provisions for Contingencies Post-employment benefits (Complementary Pension Fund) Leasing Onerous Contracts Concessions to pay - UBP Sectorial charges (regulatory taxes) Incentive to personnel retirement Others Current Total 290,186 443,284 66,931 584 17,529 13,830 432 95,391 928,167 89,463 144,066 36,754 17,440 13,426 340 50,449 76,453 428,391 Non-Current Liabilities Suppliers Loans and financing - Principal Taxes and social contributions Income tax and Social Contribution Derivatives Reimbursement obligations – CCC (12,111 law) Advance of clients Estimated Obligations Provisions for Contingencies Provisions for onerous contracts Post-employment benefits (Complementary Pension Fund) Sector charges (regulatory taxes) Advance for future capital Increase Incentive to personnel retirement Others Non-Current Total 1,702 331,874 5,947 86,366 158,829 8,084 48,296 641,098 376,859 10,162 95,350 153,176 44,405 4,057 24,986 708,995 726,447 - 772,495 - 164,491 - 689,524 - 492,987 - 147,215 - - 210,539 1,358,726 49,322 1,186,708 Stockholders’ Equity Social Capital Capital Reserve Profit Reserve Additional Proposed Dividend Accured losses/profit Other comprhensive results Non-controlling shareholders participation Stockholders’ Equity Total Total Liabilities and Stockholders’ Equity 180 Marketletter Statement of Income (R$ thousands) 09.30.14 09.30.13 Operating Revenue Electric Energy Supply - Distribution Construction Revenue - Distribution Other Operating Revenue Deductions to Revenue Net Operating Revenue 906,829 57,464 54,928 -261,344 757,877 769,632 76,812 53,241 -247,276 652,409 Operational Costs and Expenses Electric Energy purchased for resale Construction Cost Charges on electric network usage -546,061 -57,464 -43,551 -348,208 -76,812 -2,345 Operating Expenses Personnel, Material and third-part related service Depreciation and Amortization Donations and Contributions Provisions Others Operating Costs and Expenses -163,294 -24,062 -91 -7,070 -66,588 -908,181 -205,525 -19,370 -114 -17,615 -82,752 -752,741 Result before Financial Result -150,304 -100,332 Financial Result Result before Income tax and Social Contribution -38,835 - 189,139 -18,504 -118,836 Current Income tax and social Contribution Deferred Income tax and Social Contribution Net Result of the Period - 189,139 - 118,836 181 Marketletter Cash Flow (thousands reais) Cash Flow 09.30.2014 09.30.2013 OPERATING ACTIVITIES Result before income tax and social contribution Depreciation and amortization Intangible Amortization – Distribution / Transmission Monetary and Exchange net variations Financing charges Equity Method Provision for uncovered liability Provision for credits of doubtful liquidation Provisions for contingencies Provision for staff realignment Provision for impairment of assets Provision for losses with onerous contracts Provision for Financial Asset loss Global reversal reserve charges Present value adjustment Minority Participation in Result Charges on shareholders funds Loss/Gain in asset disposal (sum to Others item) Financial asset revenue by IRR Derivative financial instruments Others Variation in operating assets / liabilities Net cash from operating activities -189,139 24,062 -10,430 47,771 -15,101 2,893 -163 23,382 55,603 -61,122 -118,836 19,370 5,659 27,309 -29,740 1,761 -243 -26,651 7,751 -113,620 Financing charges – payment Payment of charges of global reversal reserve Financial charges receivable Remuneration from equity participation Financial asset revenue by AAR Financial Asset on receiving indemnities Payment of income tax and social contribution Complementary pension fund payment Lawsuits payment Legal deposits Net cash from Operational activities -34,637 7,410 -88,349 -26,245 4,809 -135,056 FINANCING ACTIVITIES Loans and financing obtained Loans and financing payable - principal Payment of Shareholders remuneration Refinancing of taxes and contributions payment - principal Capital increase - receivable Others Net cash from financing activities 216,430 -77,387 -2,313 136,730 146,762 -46,288 2,327 21,918 124,719 INVESTMENT ACTIVITIES Fixed Asset acquisition Intangible acquisition Intangible acquisition - Concession Advance for future capital increase Acquisition of equity participation investment Others Net Cash from investment activities -1,590 -8,637 -48,825 -497 -59,549 -908 -4,777 -72,035 65,443 -12,277 -11,168 -22,614 25,646 14,478 -11,168 46,006 23,392 -22,614 Increase (Decrease) in Cash and Cash Equivalents Cash and cash equivalents at beginning of the period – 12/31/13 Cash and cash equivalents at end of the period – 03/31/14 182 Marketletter Analysis of the result 3Q14 x 2Q14 The Company had a net profit in the 3Q14 105.8% higher than that recorded in the previous quarter, from a loss of R$ (131.4) million in the 2Q14 for a profit of R$ 7.7 million in the 3Q14, primarily due to the factors described below. Operating Revenue The supply of electricity for final consumers increased by 6.9%, from R$ 298.8 million in the 2Q14 to R$ 319.3 million in the 3Q14, mainly due to the tariff increase in August 2014, according to Resolution No. 1782 ANEEL. Operating Expenses Electricity purchased for resale increased by 15.6%, from R$ (15.7) million in the 2Q14 to R$ (18.2) million in the 3Q14, due mainly to increased PLD due to the higher thermal dispatch. Operational provisions had increased 139.6%, from a reversal of R$ 13.3 million in the 2Q14 to a provision of R$ (5.3) million in the 3Q14, mainly due to the recording of a provision relating to energy supply electric for Codevasf. Financial Results The debt charges decreased by 23.1%, from R$ (19.2) million in the 2Q14 to R$ (14.8) million in the 3Q14, mainly due to the renegotiation of contracts of ordinary resources in the period. The late additions had increased 120%, from R$ 4.9 million in the 2Q14 to R$ 10.8 million in the 3Q14, mainly due to rising e nergy bills installments in the period. Net other financial expenses decreased by 87.3%, from R$ (13.6) million in the 2Q14 to R$ (1.7) million in the 3Q14 , mainly due to the update of the law suit regarding the sale of energy to CODEVASF. 183 Marketletter Market Data 1. Generation Assets and Energy generated – N/A 2. Electric energy purchased for resale System Unit MWh R$ million MWh R$ million MWh R$ million Eletrobras Others Total 1Q14 2Q14 3Q14 646,010 37,4 575,101 138,1 1,221,111 175,5 706,706 48,3 471,137 189,9 1,177,843 238,2 684,132 25,2 456,088 107,2 1,140,220 132,4 3. Energy sold Distribution to Residential Industrial Commercial, services and others activities Rural Public Utilities Public Ilumination Public Service Own Consumption Others Total 1Q14 R$ million 2Q14 MWh R$ million 3Q14 R$ million MWh MWh 132,1 31,3 336,993 138,542 125,3 32,3 327,070 144,391 124,9 47,7 309,316 150,366 72,7 186,942 70,3 183,182 72,3 170,974 12,6 12,5 10,5 11,5 283,2 78,047 37,446 49,818 45,918 949 874,655 5,6 13,1 10,6 10,6 267,8 25,983 37,930 50,794 44,544 1,074 814,968 4,6 12,6 11,8 7,4 16,767 35,372 50,745 46,366 781 281,3 780,647 4. Number of Consumer Units Serviced Total 1Q14 2Q14 3Q14 991,742 998,667 1,008,010 5. Network Expansion - number of new connections 1Q14 2Q14 3Q14 10,288 7,043 9,225 2Q14 3Q14 6. Substations 1Q14 40 40 41 7. Fuel used to produce electricity- N/A 8. Losses - % Technical 10.34 1Q14 Commercial 15.13 Technical 10.34 2Q14 Commercial 14.84 Technical 10.34 3Q14 Commercial 14.83 184 Marketletter 9. Extension of distribution lines – 09.30.14 1Q14 2Q14 3Q14 40,785 40,789 40,794 1Q14 2Q14 3Q14 10.29 10.70 7.12 10. DEC- Duration of interruptions - in hours 11. FEC – Frequency of interruptions – Number of outages 1Q14 2Q14 3Q14 6.17 5.53 4.57 1Q14 2Q14 3Q14 296 388 250 12. TMA – Average response time – in minutes 13. Average price– R$/MWh 1Q14 2Q14 3Q14 250.68 257.92 280.65 14. Main Investments – R$ million Projectt 3Q14 2014 budget 16,0 17,1 16,2 249,4 Rural Distribution Network Expansion - Light for All 1,2 0.2 0.1 41,7 Expansion of Distribution System 4,4 4,2 Maintenance of Distribution System Modernization and Adequacy of Commercial and Distribution System – loss reduction Others Maintenance and Adequacy of Goods Maintenance and Adequacy of movable property, vehicles, and equipment Maintenance and Adequacy of computer, information assets and teleprocessing Total 5,0 4,1 2,5 42,2 5,4 8,6 10,5 101,5 1,1 0.0 0.7 0.1 0.5 0.1 45,9 6,0 0.0 0,1 - 4,1 Distribution 1Q14 2Q14 3,1 64,0 1,1 0.5 0.4 35,8 17,1 17,8 16,7 295,3 15. New Investments – R$ Million - N/A 185 Marketletter 16. Loans and Financing – R$ million Creditor Balance 03.31.14 Eletrobras Faceal CEF Banco do Brasil Lloyds Bank Balance 06.30.14 Balance 09.30.14 Due Date Index 731 11 05 05 01 764 9 5 5 1 Diverses 07.30.2015 12.31.2014 12.31.2014 04.10.2024 Interest Rate INPC CDI/OVER CDI/OVER DOLLAR 654 13 5 5 1 17. Contract obligations – 09.30.14 Loans and financing R$ million Energy Purchase Contracts R$ million MWh 2014 2015 2016 2017 2018 After 2018 452 126 67 52 36 47 2017 2018 After 2018 641 5,701,053 641 5,701,053 2014 508 4,457,727 2015 526 5,131,680 2016 553 5,405,868 580 5,422,416 18. Default – more than 90 days – 09.30.14 Class R$ thousand Residential Industrial Commercial, Service and other activities Rural Public Utility Public Ilumination Public Service Others Total 19. Number of employees 18,156 7,617 7,378 5,373 3,037 2,978 16,116 60,655 (including requested employees from other Eletrobras companies/ excluding employees assigned to other Eletrobras companies) 19.1. By tenure Distribution Composition of employees by tenure (Years) Up to 5 6 to 10 11 to 15 16 to20 21 to 25 beyond 25 Total 1Q14 391 175 100 227 893 2Q14 3Q14 389 174 . . 100 227 890 331 216 92 231 870 2Q14 3Q14 52 47 12 50 161 63 48 10 52 173 Administration Composition of employees by tenure (Years) Up to 5 6 to 10 11 to 15 16 to20 21 to 25 beyond 25 Total 1Q14 52 47 12 50 161 186 Marketletter 19.2.By region State 1Q14 Alagoas Number of employees 2Q14 1,054 3Q14 1,051 1,043 19.3.By departments Departments Field Administrative 1Q14 Number of employees 2Q14 890 168 3Q14 890 161 870 173 20.Complementary work force Operational 1Q14 2Q14 3Q14 1,014 1,178 1,178 21.Turn-over - % 1Q14 2Q14 3Q14 0.19 0.14 0.14 187 Marketletter Balance Sheet (R$ thousands) Financial Statements for Consolidation Purposes Assets 09.30.14 09.30.13 Current Assets Availabilities Clients (Consumers and Resellers) Fiscal Asset Deferred (taxes and Contributions) Income tax and Social Contribution Reimbursement Rights – CCC (12,111 law) Linked Deposits Stored Material Others Current Asset Total 8,229 262,803 8,186 14,678 46,493 10,586 53,122 404,097 11,628 215,460 19,909 11,480 48,630 307,107 214,228 4,594 12,709 623,186 1,477 856,194 146 19,695 30,668 151,690 6,865 11,986 789,662 1,268 961,471 146 27,166 8,577 906,703 1,310,800 997,360 1,304,467 Non-Current Assets Clients (Consumers and Resellers) Fiscal Asset Deferred (taxes and Contributions) Reimbursement Rights – CCC (12,111 Law) Linked Deposits Financial Asset – Annual allowed revenue (transmission) Others Advance for equity participation Investments Fixed Asset Intangible Non-Current Assets Total Total Assets 188 Marketletter Liabilities and Stockholders Equity 09.30.14 09.30.13 Current Liabilities Suppliers Loans and Financing Taxes and Social Contribution Income tax and Social Contribution Reimbursement Obligations – CCC (12,111 law) Clients Advance Remuneration to Shareholders (dividends to pay) Estimated Obligations Provisions for Contingencies Post-Employment Benefit (Complementary Pension Fund) Onerous Contract Sectorial Charges (regulatory taxes) Incentive to personnel retirement Others Current Liabilities Total 156,291 417,512 94,206 2,535 28,932 28,219 20,375 34,352 782,422 72,836 155,799 75,289 32,895 16,474 28,997 50,073 41,875 474,238 Non-Current Liabilities Suppliers Loans and Financing Taxes and Social Contribution Income tax and Social Contribution Reimbursement Obligations – CCC (12,111 law) Advance of clients Estimated Obligations Provision for contingencies Provision for uncovered liabilities on invested companies Post-Employment Benefit (Complementary Pension Fund) Leasing Sectorial Charges Advance for future capital increase Incentive to personnel retirement Others Non-Current Liabilities Total 530,592 84,174 92,011 75,829 34,701 16,416 2,604 836,327 498,373 39,644 72,134 64,279 20,474 136,459 2,972 773 835,108 Stockholders Equity Social Capital Capital Reserves Profit Reserves Additional proposed Dividend Acccumulated Profit/Losses Other comprehensive income Non-controlling shareholders participation Stockholders Equity Total 1,256,331 -1,529,951 -34,329 - 307,949 1,135,090 -1,136,410 -3,559 - 4,879 Total Liabilities and Stockholders Equity 1,310,800 1,304,467 189 Marketletter Statement of Income (R$ thousands) 09.30.14 09.30.13 802,622 78,356 101,666 -281,345 701,299 805,528 120,892 108,911 -289,165 746,166 -39,291 -78,356 -7,825 -120,892 -187,523 -372,939 -23,130 26,607 -51,326 -725,958 -223,789 -338,210 -22,027 -74,535 -40,467 -827,745 Operating Result before Financial Result -24,659 -81,579 Financial Result Result before Income tax and Social Contribution -61,278 -85,937 -55,660 -137,239 Current Income tax and social Contribution Deferred Income tax and Social Contribution Net Result of the Period -2,535 -88,472 -137,239 Operating Revenue Electric Energy Supply - Distribution Construction Revenue - Distribution Other Operating Revenue Deductions to Revenue Net Operating Revenue Operational Costs Personnel, Material and third-part related service Construction Cost Operating Expenses Personnel, Material and third-part related service Electric Energy purchased for resale Depreciation and Amortization Donations and Contributions Provisions Others Operating Costs and Expenses 190 Marketletter Cash Flow (reais thousands) Cash Flow 09.30.2014 09.30.2013 OPERATING ACTIVITIES Result before income tax and social contribution Depreciation and amortization Intangible Amortization – Distribution / Transmission Monetary and Exchange net variations Financing charges Equity Method Provision for uncovered liability Provision for credits of doubtful liquidation Provisions for contingencies Provision for staff realignment Provision for impairment of assets Provision for losses with onerous contracts Provision for Financial Asset loss Global reversal reserve charges Present value adjustment Minority Participation in Result Charges on shareholders funds Loss/Gain in asset disposal (sum to Others item) Financial asset revenue by IRR Derivative financial instruments Others Variation in operating assets / liabilities Net cash from operating activities -85,937 23,130 1,383 58,601 -61,848 35,241 24,436 -7,508 -12,502 -137,239 22,027 942 31,336 1,501 19,331 55,416 42,176 -40,324 -4,834 Financing charges – payment Payment of charges of global reversal reserve Financial charges receivable Remuneration from equity participation Financial asset revenue by AAR Financial Asset on receiving indemnities Payment of income tax and social contribution Complementary pension fund payment Lawsuits payment Legal deposits Net cash from Operational activities -2,535 -15,158 -30,195 -10,218 -15,052 FINANCING ACTIVITIES Loans and financing obtained Loans and financing payable - principal Payment of Shareholders remuneration Refinancing of taxes and contributions payment - principal Capital increase - receivable Others Net cash from financing activities 253,581 -160,037 785 94,329 118,758 -84,265 62,043 96,536 INVESTMENT ACTIVITIES Fixed Asset acquisition Intangible acquisition Intangible acquisition - Concession Advance for future capital increase Acquisition of equity participation investment Others Net Cash from investment activities -1,162 -630 -76,563 -78,355 -6,496 -3,085 -94,198 -103,779 -14,221 -22,295 22,450 8,229 -14,221 33,923 11,628 -22,295 Increase (Decrease) in Cash and Cash Equivalents Cash and cash equivalents at beginning of the period – 12/31/13 Cash and cash equivalents at end of the period – 03/31/14 191 Marketletter Analysis of the result 3Q14 x 2Q14 The Company had a net loss in the 3Q14 118.7% higher than that recorded in the previous quarter, from a loss of R$ (23.6) million in the 2Q14 to a loss of R$ (51.5) million in the 3Q14, because primarily to the factors described below. Operating Revenue Distribution: The supply of electricity increased by 16.4%, from R$ 258.5 million in the 2Q14 to R$ 301.1 million in the 3Q14, due mainly due to the average tariff adjustment in the 3T14 of 25.81% as ANEEL Resolution 1,781/2014. Operating Expenses Personnel expenses, materials and third party services decreased by 23.0%, from R$ (76.6) million in the 2Q14 for R$ (59.0) million in the 3Q14, mainly due to salary adjustments arising from the collective bargaining in the 2Q14. Electricity purchased for resale increased by 14.5%, from R$ (112.2) million in the 2Q14 for R$ (128.5) million in the 3Q14, due primarily to the termination of the contracts of the 1st auction of existing energy and high value of the PLD. Charges for use of the grid increased by 191.6%, from R$ (7.2) million in the 2Q14 for R$ (21.1) million in the 3Q14, mainly due to the increased charges of the service system (ESS) and TUSD. Operational provisions decreased by 224.3%, from a reversal of R$ 11.3 million in the 2Q14 to a provision of R$ (14) million in the 3Q14, mainly due to the variation caused by reversals in installment payments in contracts classes public authorities, public lighting and public service in the 2Q14, and the recognition of provisions for contingencies in the 3Q14. Other operating expenses increased by 175.2%, from R$ 10.2 million in the 2Q14 to R$ 28.1 million in the 3Q14, mainly due to losses in deactivations of goods. Financial Results Net monetary variations increased by 101.8%, from R$ (6.1) million in the 2Q14 for R$ (12.4) million in the 3Q14, due mainly to updates of overdue taxes and loans. 192 Marketletter Market Data 1. Generation Assets and Energy generated – N/A 2. Electric energy purchased for resale System Eletrobras Others Total Unit 1Q14 MWh R$ million MWh R$ million MWh R$ million 2Q14 412,200,341 20 552,647,16 108,7 964,847,50 128,70 3Q14 397,207,427 21,1 621,949,77 116,3 1,019,157,20 137,4 401,587,943 28,9 749,074,75 87,7 1,150,662,69 116,6 3. Energy sold 1Q14 Distribution to R$ million Residential Industrial Commercial Rural Public Utilities Public Ilumination Public Service Own Consumption Others Total 2Q14 MWh 144,230 15,530 60,569 8,237 18,226 11,773 10,644 0.343 269,552 R$ million 338,016 48,940 153,187 29,065 49,632 47,217 36,798 905 703,760 147,134 16,648 63,525 7,992 19,951 11,563 10,913 0.360 278,09 3Q14 MWh R$ million 335,684 52412 157,112 27,697 53,393 44,961 36,918 904 709,081 MWh 165,946 20,324 72,764 12,743 22,062 12,491 12,588 0.397 319,32 368,009 59,348 170,645 43,966 56,101 46,842 39,641 962 785,514 4. Number of Consumer Units Serviced 1Q14 2Q14 3Q14 1,113,081 1,121,174 1,133,744 5. Network Expansion - number of new connections 1Q14 2Q14 3Q14 11,338 10,047 13,792 6. Substations 1Q14 2Q14 3Q14 81 81 83 7. Fuel used to produce electricity- N/A 8. Losses - % 1Q14 Technical 13.01 Commercial 12.76 Technical 12.49 2Q14 Commercial 17.26 3Q14 Technical 13.51 Commercial 17.07 193 Marketletter 9. Extension of distribution lines – 09.30.14 1Q14 2Q14 3Q14 86,273 86,306 87,308 1Q14 2Q14 3Q14 12.11 6.13 7.82 10. DEC- Duration of interruptions - in hours 11. FEC – Frequency of interruptions – Number of outages 1Q14 2Q14 3Q14 6.37 4.83 4.17 1Q14 2Q14 3Q14 386 401 294 12. TMA – Average response time – in minutes 13. Average price– R$/MWh 1Q14 2Q14 3Q14 338.46 346.44 360.87 14. Main investments – R$ million Project 1Q14 Distribution Rural Distribution Network Expansion - Light for All Program Urban Distribution Network Expansion Distribution System Maintenance Renovation and Adequacy of Commercial and Distribution System Others Maintenance of Assets Total 10,200387 6,493145 9,458328 9,315001 0.609081 36,075942 2Q14 3Q14 10,971035 5,140940 8,836751 6,110758 0.196565 31,256049 11,546254 2,880573 9,354697 7,667537 1,842654 33,291715 2014 budget 112,125000 125,931076 76,575832 78,414911 34,540903 8,034908 435,622630 15. New Investments – N/A 16. Loans and financing – R$ million Creditor BB Eletrobras Morgan Caixa Balance 03.31.14 Balance 06.30.14 Balance 09.30.14 Due Index 2014 IGPM + Interest rate 8.46% py FINEL/RGR – 5% py RO – 11.4% py Dollar – Interest rate 6% py Interest rate 7% py 0.399 0.103 811,142 863,708 911,466 2027 7,758 7,320 8,166 28,472 2024 2026 194 Marketletter 17. Contract obligations – 09.30.14 2014 2015 2016 2017 106,272 350,329 141,588 102,027 50,474 Energy Purchase Contracts 2014 2015 2016 2017 2018 After 2018 R$ milhões MWh 468,517,334 4,351,327.99 454,298,74 3,955,770 478,566,49 4,073,356 402,330,76 3,583,525,32 402,330.75 3,583,525.32 10,460,599.74 93,171,658.38 Loans and financing R$ million 2018 After 2018 197,414 18. Default – more than 90 days – 09.30.14 Class R$ Million State utilities Industrial Residential Commercial, Service and Others Rural Public Entities Public Ilumination Public Service Others Total 103,604 18,570 35,171 22,536 7,550 4,441 1,157 0.246 14,018 207,293 19. Number of employees (including requested employees from other Eletrobras companies/ excluding employees assigned to other Eletrobras companies) 19.1. By tenure Distribution Composition of employees by tenure (Years) Up to 5 6 to 10 11 to 15 16 to 20 21 to 25 beyond 25 Total 1Q14 2Q14 3Q14 406 01 01 07 548 963 405 01 01 06 546 959 399 01 01 06 546 953 1Q14 2Q14 3Q14 62 01 07 139 209 59 01 06 139 205 62 02 06 139 209 Administration Composition of employees by tenure (Years) Up to 5 6 to 10 11 to 15 16 to 20 21 to 25 beyond 25 Total 19.2.By region State Piauí 1Q14 1,172 Number of employees 2Q14 1,164 3Q14 1,162 195 Marketletter 19.3.By departments Department Field Administrative Number of employees 2Q14 1Q14 601 571 598 566 3Q14 598 564 20.Complementary work force Operational 1Q14 2Q14 3Q14 1,267 1,356 1,538 21.Turn-over - % 1Q14 2Q14 3Q14 0.38 0.47 0.43 196 Marketletter Balance Sheet (R$ thousands) Financial Statements for Consolidation Purposes Assets 09.30.14 09.30.13 35,010 181,356 11,043 14,183 230 7,799 38,972 288,593 22,593 158,459 12,580 80,720 565 7,228 34,622 316,767 Investments Fixed Asset Intangible 26,740 9,352 2,375,661 66,626 735,172 3,958 3,217,509 1,806 29,772 66,987 31,840 10,957 1,168,070 64,692 789,430 5,823 2,070,812 1,809 28,084 88,614 Non-Current Assets Total Total Assets 3,316,074 3,604,667 2,189,319 2,506,086 Current Assets Availabilities Clients (Consumers and Resellers) Fiscal Asset Deferred (taxes and Contributions) Income Tax and Social Contribution Reimbursement Rights – CCC (12,111 law) Linked Deposits Stored Material Others Current Asset Total Non-Current Assets Clients (Consumers and Resellers) Fiscal Asset Deferred (taxes and Contributions) Reimbursement Rights – CCC (12,111 Law) Linked Deposits Financial Asset – Annual allowed revenue (transmission) Others Advance for equity participation 197 Marketletter Liabilities and Stockholders Equity 09.30.14 09.30.13 Current Liabilities Suppliers Loans and Financing Taxes and Social Contribution Income tax and Social Contribution Reimbursement Obligations – CCC (12,111 law) Clients Advance Remuneration to Shareholders (dividends to pay) Estimated Obligations Provisions for Contingencies Post-Employment Benefit (Complementary Pension Fund) Leasing Onerous Contracts Sectorial Charges (regulatory taxes) Incentive to personnel retirement Others Current Liabilities Total 1,412,865 293,876 35,081 30,117 757 6,279 18,981 1,797,956 302,841 83,339 33,200 10,471 20,288 483 4,505 21,026 24,561 500,714 Non-Current Liabilities Suppliers Loans and Financing Taxes and Social Contribution Income tax and Social Contribution Reimbursement Obligations – CCC (12,111 law) Advance of clients Provision for contingencies Provision for onerous contracts Post-Employment Benefit (Complementary Pension Fund) Sectorial Charges (regulatory charges) Advance for future capital increase Others Non-Current Liabilities Total 337,759 3,521 148,412 126,441 37,703 252 1,338,269 1,992,357 336,473 3,408 127,695 112,218 30,971 113,152 1,321,562 2,045,479 Stockholders Equity Social Capital Capital Reserves Profit Reserves Additional proposed Dividend Acccumulated Profit/Losses Other comprehensive income Non-controllingshareholders participation Stockholders Equity Total 1,325,124 - 1,510,770 -185,646 1,212,157 - 1,252,264 -40,107 Total Liabilities and Stockholders Equity 3,604,667 2,506,086 198 Marketletter Statement of Income (R$ thousands) 09.30.14 09.30.13 Operating Revenue Electric Energy Supply - Distribution Construction Revenue - Distribution Other Operating Revenue Deductions to Revenue Net Operating Revenue 948,646 128,745 47,348 -272,890 851,849 860,063 158,070 16,004 -231,942 802,195 Operational Costs Electric Energy purchased for resale Construction Cost -373,605 -128,745 -461,064 -158,070 -190,336 -10,004 -25,173 -328 -10,123 -79,026 -817,340 -168,988 -24,810 -22,638 -233 160,771 -156,711 -831,743 Operating Result before Financial Result 34,509 -29,548 Financial Result Result before Income tax and Social Contribution -27,762 6,747 -32,088 -61,636 -3,739 3,008 -61,636 Operational Expenses Personnel, Material and third-part related service Charges on electric network usage Depreciation and Amortization Donations and Contributions Provisions Others Operational Costs and Expenses Current Income tax and social Contribution Deferred Income tax and Social Contribution Net Result of the Period 199 Marketletter Cash Flow (thousands reais) Cash Flow 09.30.2014 09.30.2013 OPERATING ACTIVITIES Result before income tax and social contribution Depreciation and amortization Intangible Amortization – Distribution / Transmission Monetary and Exchange net variations Financing charges Equity Method Provision for uncovered liability Provision for credits of doubtful liquidation Provisions for contingencies Provision for staff realignment Provision for impairment of assets Provision for losses with onerous contracts Provision for Financial Asset loss Global reversal reserve charges Present value adjustment Minority Participation in Result Charges on shareholders funds Loss/Gain in asset disposal (sum to Others item) Financial asset revenue by IRR Derivative financial instruments Others Variation in operating assets / liabilities Net cash from operating activities 6,747 25,173 4,286 41,455 14,466 -4,343 29,328 -95,434 21,678 -59,139 22,638 15,599 22,721 -44,338 -497 -131,200 75,149 -43,951 -143,018 Financing charges – payment Payment of charges of global reversal reserve Financial charges receivable Remuneration from equity participation Financial asset revenue by AAR Financial Asset on receiving indemnities Payment of income tax and social contribution Complementary pension fund payment Lawsuits payment Legal deposits Net cash from Operational activities -25,759 -449 -4,530 -24,185 86,938 -80,265 171,833 -41,351 130,482 160,634 -13,790 86,000 232,844 -646 -6,710 -124,480 -131,836 -3,326 -12,937 -146,055 -43,000 -205,318 -5,884 -52,739 40,894 35,010 -5,884 75,332 22,593 -52,739 FINANCING ACTIVITIES Loans and financing obtained Loans and financing payable - principal Payment of Shareholders remuneration Refinancing of taxes and contributions payment - principal Capital increase - receivable Others Net cash from financing activities INVESTMENT ACTIVITIES Fixed Asset acquisition Intangible acquisition Intangible acquisition - Concession Advance for future capital increase Acquisition of equity participation investment Others Net Cash from investment activities Increase (Decrease) in Cash and Cash Equivalents Cash and cash equivalents at beginning of the period – 12/31/13 Cash and cash equivalents at end of the period – 03/31/14 200 Marketletter Analysis of the result 3Q14 x 2Q14 The Company had a net loss in the 3Q14 150.9% higher than that recorded in the previous quarter, from a profit of R$ 69.0 million in the 2Q14 to a loss of R$ (35.1) million in the 3Q14, mainly due to factors described below. Operating Revenue The supply of electricity increased by 6%, from R$ 312.7 million in the 2Q14, to R$ 331.7 million in the 3Q14, primarily due to an increase in billed consumption and growing number of consumers. Operating Expenses Expenses for personnel, material and third party services decreased by 1.0%, from R$ (67.0) million in the 2Q14 for R$ (66.3) million in the 3Q14, mainly due to salary adjustments arising from the collective bargaining in the 2Q14. Electricity purchased for resale decreased by 263.8%, from R$ (50.2) million in the 2Q14 for R$ (182.8) million, in the 3Q14, primarily due to increased PLD and increased volume of purchased energy. Financial Results Net monetary variations decreased by 121.9% from a loss of R$ (6.7) million in the 2Q14 to a gain of R$ 1.5 million in the 3Q14, mainly due to the update of legal deposits. Other financial income decreased by 81.1%, from R$ 10.4 million in the 2Q14 for R$ 2.0 million in the 3Q14, mainly due to the adjustment of financial exposure with CCEE. Other financial expenses increased by 147.7%, from R$ (3.6) million in the 2Q14 for R$ (9.0) million in the 3Q14, primarily due to the recognition of interest on contracts with Petrobras. 201 Marketletter Market Data 1. Generation Assets and Energy generated Own assets Plant Installed Capacity (MW) Guaranteed energy (MW average) 1Q14 2Q14 3Q14 2.6 2.0 5,075.3 2,536.19 - SHU – Rio Vermelho Plant Energy generated (MWh) Location (State) Beginning of Operation End of Operation RO Nov/86 10/12 SHU – Rio Vermelho 2. Electric energy purchased for resale System Unit Eletrobras (SIN) MWh R$ million MWh R$ million MWh R$ million Others Total 1Q14 2Q14 3Q14 556.127 85.1 361.846 55.4 917,973 140,5 591.913 29.5 385.089 19.1 977,002 48,6 761.389 160,8 284.023 59,3 1,045,412 220,1 SIN – National Interconnected System 3. Energy sold Distribution to Residential Industrial Commercial, services and others activities Rural Public Utilities Public Ilumination Public Service Own Consumption Others Total 1Q14 R$ million MWh 135,6 45,2 70,0 22,1 19,6 9,1 3,7 0.4 -1,4 304,3 275,766 122,602 147,073 68,029 44,629 33,436 11,760 900 704,195 2Q14 R$ million MWh 136,1 46,5 72,0 22,4 22,1 8,6 3,7 0.5 19,8 331,7 278,240 135,010 152,843 69,498 51,728 31,895 12,130 1,074 732,418 3Q14 R$ million MWh 144,1 47,1 77,0 23,8 24,0 8,7 3,8 0.5 12,3 341,3 295,371 133,343 163,919 74,409 56,570 32,237 12,319 988 769,156 4. Number of Consumer Units Serviced 1Q14 2Q14 3Q14 567,620 569,757 575,364 5. Network Expansion - number of new connections 1Q14 2Q14 3Q14 5,117 6,078 6,920 1Q14 2Q14 3Q14 6. Substations 57 57 57 202 Marketletter 7. Fuel used to produce electricity Type Diesel oil Unit Litre 1Q14 2Q14 3Q14 Amount R$ Million Amount R$ Million Amount R$ Million 126,011,500 310,99 133,118,500 319,90 116,708,000 296,48 8. Losses - % 1Q14 2Q14 3Q14 Technical Commercial Technical Commercial Technical Commercial 11.15 11.27 11.15 12.04 11.15 12.75 9. Extension of distribution lines – 09.30.14 1Q14 2Q14 3Q14 57,616 57,652 57,698 10. DEC- Duration of interruptions - in hours 1Q14 2Q14 3Q14 6.80 3.97 3.71 11. FEC – Frequency of interruptions – Number of outages 1Q14 2Q14 3Q14 6.23 4.25 3.08 12. TMA – Average response time – in minutes 1Q14 2Q14 3Q14 279.0 263.1 257.23 13. Average price – R$/MWh 1Q14 2Q14 3Q14 352.49 336.94 350.83 203 Marketletter 14. Main investments – R$ million Project Distribution Rural Expansion of distribution - Light for All Project Expansion of Urban distribution Maintenance of the distribution system Isolated system - energy Renovation – Distribution and Comercialization System Others Maintenance and Adjustment of property / IT assets Total 1Q14 2Q14 3Q14 2014 budget 0.43 24,58 17,78 2,69 1,13 26,23 8,09 4,48 0.02 26,99 9,66 5,21 100,00 268,02 38,73 89,77 0.55 46,03 2,72 42,65 1,11 42,99 11,02 507,54 15. New Investments – N/A 16. Loans and financing – R$ million Creditor Balance 03.31.14 Balance 06.30.14 Balance 09.30.14 Due Index Eletrobras 512,1 554,7 630,8 2025 IPCA/FINEL/RGR – 5% py 17. Contract obligations 09.30.14 Loans and financing R$ million Energy Purchase Contracts R$ million MWh 2014 2015 2016 2017 2018 After 2018 7,4 327,9 90,4 88,9 40,6 75,6 2014 162,461 1,143,048 2015 702,267 4,661,341 2016 780,914 4,889,967 2017 842,551 4,977,287 2018 After 2018 1,060,572 5,910,592 6,294,644 29,531,820 18. Default – more than 90 days - 09.30.14 Class Residential Industrial Commercial, services and other activities Rural Public Utility Public Ilumination Public Utility Services Others Total R$ million 18,0 17,6 8,5 6,0 7,1 7,8 24,5 89,5 204 Marketletter 19.Number of employees (including requested employees from other Eletrobras companies/ excluding employees assigned to other Eletrobras companies) 19.1.By tenure Distribution Composition of employees by tenure (Years) 1Q14 Up to 5 6 to 10 11 to 15 16 to 20 21 to 25 beyond 25 Total 2Q14 3Q14 136 162 41 36 200 575 142 146 39 35 185 547 2Q14 3Q14 22 58 2 4 26 81 193 25 60 2 6 8 113 214 138 159 1 39 36 201 574 Administration Composition of employees by tenure (Years) 1Q14 Up to 5 6 to 10 11 to 15 16 to 20 21 to 25 beyond 25 Total 22 63 2 6 8 98 199 19.2.By region State 1Q14 Rondônia Number of employees 2Q14 773 3Q14 768 761 19.3.By departments Department Number of employees 2Q14 1Q14 Field Administrative 574 199 575 193 3Q14 547 214 20.Complementary work force Operational 1Q14 2Q14 3Q14 1,140 1,140 1,195 21.Turn-over - % 1Q14 2Q14 0.38 0.26 3Q14 0.52 205 Marketletter Balance Sheet (R$ thousands) Financial Statements for Consolidation Purposes Assets 09.30.14 09.30.13 7,078 45,555 5,805 1,707 18,422 78,567 7,708 69,353 5,236 3,965 1,666 5,702 93,630 Investments Fixed Asset Intangible 3,720 10,908 124,918 17,107 168,398 2,604 327,655 11,289 5,899 6,495 16,060 143,850 1,842 168,247 11,577 6,666 Non-Current Assets Total Total Assets 344,843 423,410 186,490 280,120 Current Assets Availabilities Clients (Consumers and Resellers) Fiscal Asset Deferred (taxes and Contributions) Income tax and Social Contribution Reimbursement Rights – CCC (12,111 Law) Linked Deposits Stored Material Others Current Asset Total Non-Current Assets Clients (Consumers and Resellers) Fiscal Asset Deferred (taxes and Contributions) Reimbursement Rights – CCC (12,111 Law) Linked Deposits Financial Asset – Annual allowed revenue (transmission) Others Advance for equity participation 206 Marketletter Liabilities and Stockholders’ Equity 09.30.14 09.30.13 Current Liabilities Suppliers Loans and Financing Taxes and Social Contribution Income tax and Social Contribution Reimbursement Obligations – CCC (12,111 law) Advance from clients Remuneration to Shareholders (dividends to pay) Estimated Obligations Provisions for Contingencies Post-Employment Benefit (Complementary Pension Fund) Onerous Contracts Concessions to pay - UBP Sectorial Charges (regulatory taxes) Incentive to personnel retirement Others Current Liabilities Total 268,343 29,642 3,771 11,565 41,439 354,760 103,238 4,176 4,920 9,874 3,041 9,151 134,400 Non-Current Liabilities Suppliers Loans and Financing Taxes and Social Contribution Income tax and Social Contribution Reimbursement Obligations – CCC (12,111 law) Advance from clients Estimated Obligations Provision for contingencies Provision for onerous contract Post-Employment Benefit (Complementary Pension Fund) Sectorial Charges (regulatory charges) Advance for future capital increase Others Non-Current Liabilities Total 11,289 57,209 27,343 1,846 33,368 131,055 16,872 18,238 22,563 4,445 83,683 145,801 684,204 - 745,233 - 1,376 - 62,405 684,204 - 680,197 - 4,088 -81 423,410 280,120 Stockholders Equity Social Capital Capital Reserves Profit Reserves Additional proposed Dividend Acccumulated Profit/Losses Other comprehensive income Non-controlling shareholders participation Stockholders’ Equity Total Total Liabilities and Stockholders’ Equity 207 Marketletter Statement of Income (R$ thousands) 09.30.14 09.30.13 Operating Revenue Supply Electric Energy Supply - Distribution Construction Revenue - Distribution Other Operating Revenue Deductions to Revenue Net Operating Revenue 166,829 8,703 7,075 -40,309 142,298 21,623 143,040 9,332 1,866 -39,158 136,703 Operational Costs Electric Energy purchased for resale Charges on electric network usage Construction Cost Fuel -72,247 -8,703 -14,826 - 90,867 -9,332 -9,265 -62,099 - 7,028 -18,692 -26,023 -209,618 -75,316 -6,597 57,487 17,939 -115,951 -67,320 20,752 - 3,376 - 70,696 2,729 23,481 -70,696 23,481 Operational Expenses Personnel, Material and third-part related service Depreciation and Amortization Donations and Contributions Provisions Others Operating Expenses Operating Result before Financial Result Financial Result Result before Income tax and Social Contribution Current Income tax and social Contribution Deferred Income tax and Social Contribution Net Result of the Period 208 Marketletter Cash Flow (thousands of reais) Cash Flow 09.30.2014 09.30.2013 -46,494 7,028 875 2,149 19,547 4,628 -4,692 12,366 -4,593 35,158 6,597 -13,328 1,433 -56,641 1,864 -3,646 39,808 11,245 Financing charges – payment Payment of charges of global reversal reserve Financial charges receivable Remuneration from equity participation Financial asset revenue by AAR Financial Asset on receiving indemnities Payment of income tax and social contribution Complementary pension fund payment Lawsuits payment Legal deposits Net cash from Operational activities -1,991 -6,584 -1,433 9,812 FINANCING ACTIVITIES Loans and financing obtained Loans and financing payable - principal Payment of Shareholders remuneration Refinancing of taxes and contributions payment - principal Capital increase - receivable Others Net cash from financing activities 18,981 -3,446 15,535 3,720 -1,857 1,863 INVESTMENT ACTIVITIES Fixed Asset acquisition Intangible acquisition Concession Asset Acquisition Advance for future capital increase Acquisition of equity participation investment Others Net Cash from investment activities -8,121 -911 -343 -9,375 -956 -995 -16,757 -18,708 -424 -7,033 7,502 7,078 -424 14,741 7,708 -7,033 OPERATING ACTIVITIES Result before income tax and social contribution Depreciation and amortization Intangible Amortization – Distribution / Transmission Monetary and Exchange net variations Financing charges Equity Method Provision for uncovered liability Provision for credits of doubtful liquidation Provisions for contingencies Provision for staff realignment Provision for impairment of assets Provision for losses with onerous contracts Provision for Financial Asset loss Global reversal reserve charges Present value adjustment Minority Participation in Result Charges on shareholders funds Loss/Gain in asset disposal (sum to Others item) Financial asset revenue by IRR Derivative financial instruments Others Variation in operating assets / liabilities Net cash from operating activities Increase (Decrease) in Cash and Cash Equivalents Cash and cash equivalents at beginning of the period – 12/31/13 Cash and cash equivalents at end of the period – 03/31/14 209 Marketletter Analysis of the result 3T14 x 2T14 The Company had a net profit in the 3Q14 27.2% lower than reported in the previous quarter, from R$ 39.9 million in the 2Q14 to R$ 29.1 million in the 3Q14, primarily due to the factors described below. Operating Revenue Distribution: The supply of electricity decreased by 2.2%, but had no significant impact on the outcome. Operating Expenses Personnel expenses, materials and third party services decreased 21.9%, from R$ (24.8) million in the 2Q14 for R$ (19.3) million in the 3Q14, mainly due to salary adjustment in the 2Q14. Electricity purchased for resale increased by 8.1%, from R$ (23.3) million in the 2Q14 for R$ (25.1) million in the 3Q14, due to increased demand in the 3Q14. Operational provisions had increased by 14.9%, from R$ (7.7) million in the 2Q14 for R$ (8.9) million in the 3Q14, primarily due to the recognition of a provision of penalty from ANEEL in the 3Q14. Financial Results Net monetary decreased by 367%, from revenues of R$ 3.2 million in the 2Q14 to an expense of R$ 8.4 million in the 3Q14, mainly due to update of debt to the Eletronorte. 210 Marketletter Market Data 1. Generation Assets and Energy generated Plant Installed Capacity (MW) Floresta Distrito 40MW 20MW (IPPs contract) Energy generated (MWh) 1Q14 2Q14 3Q14 Beginning of Operation End of Concession 15,924 15,952 16,393 19,943 16,001 19,251 Apr/2010 Apr/2010 Apr/2015 Apr/2015 2. Electric energy purchased for resale System Unit MWh R$ million MWh R$ million Eletrobras Total 1Q14 2Q14 3Q14 199,305 40,5 199,305 40,5 202,663 40,5 202,663 40,5 213,744 43,0 213,744 43,0 3. Energy sold 1Q14 R$ million MWh Distribution to Residential Industrial Commercial, services and others activities Rural Public Utilities Public Ilumination Public Service Own Consumption Others Total 2Q14 R$ million MWh 3Q14 R$ million MWh 26,8 0.8 89,889 3,566 26,9 0.9 91,183 4,189 26,6 0.9 89,634 4,240 10,0 38,258 9,9 38,499 10,3 39,862 1,0 3,6 1,1 0.6 0.1 44 5,273 18,294 6,624 4,642 716 167,262 0.6 4,3 1,2 0,7 0.1 44,6 2,972 22,105 7,156 4,665 670 171,438 0.6 4,2 1,2 0.7 0.1 44,6 3,080 21,475 7,168 5,054 699 171,212 1. Number of Consumer Units Serviced 1Q14 98,936 2Q14 3Q14 100,546 101,559 5. Network Expansion - number of new connections 1Q14 2Q14 3Q14 3,602 1,820 2,000 1Q14 2Q14 3Q14 03 03 03 6 .Substations 7. Fuel used to produce electricity Type Unit Diesel oil Litre million Amount 11,4 1Q14 R$ million Amount 33,8 10,3 2Q14 R$ million 30,5 Amount 11,2 3Q14 R$ million 33,1 211 Marketletter 8. Losses - % Technical 1Q14 Commercial 7.04 Technical 4.67 2Q14 Commercial 7.04 3Q14 Technical 2.49 Commercial 7.04 5.98 9. Extension of distribution lines – 09.30.14 1Q14 2Q14 3Q14 3,469 3,487 3,503 10. Extension of transmission lines – 09.30.14 – N/A 11. DEC- Duration of interruptions - in hours 1Q14 2Q14 3Q14 2.28 2.08 3.16 12. FEC – Frequency of interruptions – Number of outages 1Q14 2Q14 3Q14 3.92 2.43 4.61 1Q14 2Q14 3Q14 76.06 84.67 85.72 13. TMA – Average response time – in minutes 14. Average price– R$/MWh 1Q14 2Q14 3Q14 263.957 260.831 260.965 15. Main investments – R$ million Project Distribution Expansion of Urban Distribution (Light for All Program) Expansion of Urban Distribution (regular) Maintenance of energy distribution system Modernization and adaptation of energy distribution and Energy trading system Others Maintenance and adjustment of property Maintenance and adjustment of goods Maintenance and adjustment of thechnological activity Total 1Q14 2Q14 3Q14 2,01 1,13 0.65 4,08 0.99 1,23 3,54 0.11 1,62 1,00 2014 budget 55,48 8,81 14,88 5,8 0.23 1,86 0.81 25,99 0.02 0.02 2,03 0.17 0.17 4,25 0.24 0.24 3,78 13,46 0.89 1,43 11,14 68,94 212 Marketletter 16. New investments – R$ million Project 1Q14 2Q14 3Q14 Budget 2014 - 1,5 0.9 6,34 Expansion of Urban Network Distribution 17. Loans and financing – R$ million Creditor Eletrobras Balance on 03.31.14 Balance on 06.30.14 23,48 Balance on 09.30.14 41,27 Date Due 38,78 Index Up to 2019 According to ECF (Diverses) 18. Contract obligations - 09.30.14 2014 Loans and financing R$ million 7,11 Energy Purchase Contracts R$ million MWh 2014 147,179 741,640 2015 2016 2017 2018 4,06 1,76 1,82 21,78 After 2018 2,25 2015 2016 2017 2018 After 2018 131,045 660,343 138,907 660,343 183,811 832,200 193,001 832,200 117,704 483,360 19. Default – more than 120 days –09.30.14 Class R$ million State utilities Industrial Residential Commercial Others Total 1,86 0.06 0.95 0.22 27,19 40,28 20.Number of employees (including requested employees from other Eletrobras companies/ excluding employees assigned to other Eletrobras companies) 20.1.By tenure Distribution Composition of employees by tenure (Years) Up to 5 6 to 10 11 to 15 16 to 20 21 to 25 beyond 25 Total 1Q14 2Q14 3Q14 18 60 25 33 136 13 43 23 1 13 40 133 31 39 24 56 150 Administration Composition of employees by tenure (Years) Up to 5 6 to 10 11 to 15 16 to 20 21 to 25 beyond 25 Total 1Q14 10 86 9 19 124 2Q14 3Q14 7 42 43 2 9 19 122 12 43 43 1 3 24 126 213 Marketletter 20.2.By region State 1Q14 Roraima Number of employees 2Q14 260 3Q14 255 276 20.3.By departments Department Field Administrative 1Q14 Number of employees 2Q14 3Q14 136 124 133 122 150 126 1Q14 2Q14 3Q14 269 267 267 21.Complementary work force Operational 22.Turn-over - % 1Q14 2Q14 3Q14 0.00 0.01 0.038 214 Marketletter Balance Sheet (R$ thousands) Financial Statements for Consolidation Purposes Assets 09.30.14 09.30.13 8,479 44,125 2,789 2,336 57,729 52,986 1,250 1,157 9 55,402 2,741 50 2,791 2,741 48 2,789 95,627 22 21 94,181 32 20 98,461 156,190 97,022 152,424 Current Assets Availabilities Clients (Consumers and Resellers) Loans and Financing - Principal Marketable Securities Dividends to receive (remuneration of equity participation) Fiscal Asset Deferred (taxes and Contributions) Income tax and Social Contribution Linked Deposits Stored Material Financial Asset Others Current Asset Total Non-Current Assets Clients (Consumers and Resellers) Loans and Financing - Principal Marketable Securities Fiscal Asset Deferred (taxes and Contributions) Income tax and Social Contribution Linked Deposits Others Advance for equity participation Investments Fixed Asset Intangible Non-Current Assets Total Total Assets 215 Marketletter Liabilities and Stockholders Equity 09.30.14 09.30.13 Current Liabilities Suppliers Loans and Financing Taxes and Social Contribution Income tax and Social Contribution Derivatives Remuneration to Shareholders (dividends to pay) Estimated Obligations Provisions for Contingencies Post-Employment Benefit (Complementary Pension Fund) Leasing Onerous Contracts Others Current Liabilities Total 701 31 323 118 1,173 549 27 16 592 Non-Current Liabilities Suppliers Loans and Financing Bonds Taxes and Social Contribution Income tax and Social Contribution Derivatives Estimated Obligations Provision for contingencies Provision for uncovered liabilities on invested companies Provision for onerous contract Post-Employment Benefit (Complementary Pension Fund) Sectorial Charges (regulatory charges) Advance for future capital increase Others Non-Current Liabilities Total 12,307 12,307 8,815 8,815 Stockholders Equity Social Capital Capital Reserves Profit Reserves Additional proposed Dividend Acccumulated Profit/Losses Other comprehensive income Non-controlling shareholders participation Stockholders Equity Total 118,054 3,159 -3,340 24,837 142,710 118,054 2,991 5,007 16,964 143,016 Total Liabilities and Stockholders Equity 156,190 152,423 216 Marketletter Statement of Income (R$ thousands) 09.30.14 09.30.13 10,360 10,360 2,355 2,355 -2,247 -14 -13,936 -1,378 -17,575 -2,191 -8 1,713 -1,931 -2,417 Operating Result before Financial Result -7,215 -62 Financial Result Result before Income tax and Social Contribution 4,198 -3,017 2,130 2,068 Current Income tax and social Contribution Deferred Income tax and Social Contribution Net Result of the Period -323 -3,340 2,068 Operating Revenue Equity Participation Revenue Operating Revenue Total Operational Costs and Expenses Personnel, Material and third-part related service Depreciation and Amortization Donations and Contributions Provisions Others Operating Costs and Expenses 217 Marketletter Cash Flow (thousands Reais) Cash Flow 09.30.2014 09.30.2013 -3,017 14 -999 13,936 -4,769 -2,007 3,158 5,000 10 -2,355 -1,713 -878 64 261 -323 3,096 1,902 1,966 FINANCING ACTIVITIES Loans and financing obtained Loans and financing payable - principal Payment of Shareholders remuneration Refinancing of taxes and contributions payment - principal Capital increase - receivable Others Net cash from financing activities -3,203 -3,203 -12,775 -12,775 INVESTMENT ACTIVITIES Fixed Asset acquisition Intangible acquisition Concession asset acquisition Advance for future capital increase Acquisition of equity participation investment Others Net Cash from investment activities -10 -1,519 -1,529 -10 -10 -1,636 -10,819 54,240 52,604 -1,636 63,804 52,986 -10,818 OPERATING ACTIVITIES Result before income tax and social contribution Depreciation and amortization Intangible Amortization – Distribution / Transmission Monetary and Exchange net variations Financing charges Equity Method Result Provision for uncovered liability Provision for credits of doubtful liquidation Provisions for contingencies Provision for losses with Investments Provision for impairment of assets Provision for losses with onerous contracts Provision for Financial Asset loss Global reversal reserve charges Present value adjustment Minority Participation in Result Charges on shareholders funds Loss/Gain in asset disposal (sum to Others item) Financial asset revenue by IRR Derivative financial instruments Others Variation in operating assets / liabilities Net cash from operating activities Financing charges – payment Payment of charges of global reversal reserve Financial charges receivable Remuneration from equity participation Financial asset revenue by AAR Financial Asset on receiving indemnities Payment of income tax and social contribution Complementary pension fund payment Lawsuits payment Legal deposits Net cash from Operational activities Increase (Decrease) in Cash and Cash Equivalents Cash and cash equivalents at beginning of the period – 12/31/13 Cash and cash equivalents at end of the period – 03/31/14 218 Marketletter Analisis of Result 3Q14 x 2Q14 The Company presented a profit in 2Q14 2,075% higher than that registered in the previous quarter, from a loss of R$ (0.3) million in 2Q14 to a profit of R$ 6.3 million in 3Q14, primarily due to the factors described below. Equity Participation Revenue The Result of Investments in Equity Participations presented an increase of 1,396%, from a loss of R$ 0.5 million in 2Q14 to a gain of R$ 6.8 million in 3Q14 due to the reversal of a provision related to EMAE. Operating Expenses The others operating expenses increased by 117% due to the loss record in the subscription of shares of CTEEP in 3Q14. 219 Marketletter Market Data 1. Investments – 09.30.14 Company Type CTEEP Eletropaulo EMAE Energias do Brasil CPFL Energia Amount PN PNB PN ON ON 2. Number of employees Participation (%) 1,060,225 2,095,644 523,911 1,485,678 1,703,600 0.65 1.25 1.42 0.31 0.18 (including requested employees from other Eletrobras companies/excluding employees assigned to other Eletrobras companies) 2.1.By tenure Composition of employees by tenure (Years) Up to 5 6 to 10 11 to15 16 to 20 21 to 25 Beyond 25 Total 1Q14 2Q14 2 2 4 2 2 4 1Q14 Number of employees 2Q14 3Q14 2 2 4 2.1.By region State RJ 4 3Q14 4 4 3. Complementary work force 1Q14 2Q14 3Q14 6 6 6 4. Turn-Over - % 1Q14 - 2Q14 - 3Q14 - 220