PENDING SOLUTION TO BE FURTHER DISCUSSED AT INSPECTION
Available
Room
Available
Room
13,91m
14,04m
11.04
11.04J
J
Satelite Waste
Removal
Satelite Waste
Removal
48,07m
48,02m
11.04 J
11.04J
Satelite Waste
Removal
Satelite Waste
Removal
47,75m
47,15m
Available
Room
9.03
Secure Storage
Ceremonies
Additional facilities
872,75m
603,00m
31.05
15,35m
9.02
9.01
Ceremonies Prop
Store
Ceremonies
Changing rooms
9.03
Ceremonies
Additional facilities
Legacy
Security Area
150,00m
W.C.
W.C.
Telecom
45,11m
Available
Room
9.03
Ceremonies
Additional facilities
445,00m
16,13m
603,00m
9.03
Ceremonies
Additional facilities
85.82m
173,85m
9.03
Ceremonies
Additional facilities
8.20
W.C.
Ceremonies
Office
161,89m
W.C.
Telecom
45,12m
11,53m
9.03
Ceremonies
Additional facilities
150,00m
3.13
3.13
3.07
3.07
Photograpers'
Positions
Photograpers'
Positions
Service Tunnel
8.23
Stadium
Grounds Keeper
Facilities
Service Tunnel
50.07
Security Extra
Facilities
3.11
3.11
3.11
Advertising Boar - Pitch
Perimeter
Advertising Boar - Pitch
Perimeter
Advertising Boar - Pitch
Perimeter
546,14m
3.07
3.07
11.02
Photograpers'
Positions
Photograpers'
Positions
F&B Storage
81m
577,36m
11.02
F&B Storage
81m
11.02
F&B Storage
82m
Available
Room
31.07
11.02
18,93m
Security Post
F&B Storage
28,76m
82m
Telecom
12,28
11.02
50.27
400,00m
3.07
3.07
Photograpers'
Positions
Photograpers'
Positions
81m
11.02
24.14
F&B Storage
Secundary
Technical
Area
81m
POP
Room
3.04
50.29
F&B Staff
Changing
Room
Fourth Official's
Bench
3.03
Substitutes' Bench
Team A
5.01
Stretcher - Bearer's
And Medical Team
Area
FRIO
EDOR
CORR
AR
DE
ENTO ADO
FLAM
INSU PISO ELEV
PELO
80 cm
CORR
EDOR
QUEN
TE
(1500x PDU
1500m
m)
3.13
24.02
CORR
EDOR
FRIO
Service Tunnel
PTA 2
INSU
FLAM
PELO
ENTO
PISO
DE
AR
ELEV
ADO
INSU
FLAM
PELO
ENTO
PISO
DE
ELEV AR
ADO
CORR
TE
CORR
EDOR
QUEN
TE
117,72m
TE
7.01
7.03
GC OFFICE
GC
Storage
44,13m
Loc General
Office
7.05
20,32m
23,27 m
51,75m
7.02
GC Meeting room
29,96m
Showers
12.01 / 12.03
67,07m
Stadium signage
and decor office /
Signage Storage
8.05
IT
Office
4.02
Team A
Dressing Room
Showers
FIFA LOC
Offices
66,22m
113,00m
Toilet
7.25
40,68m
7.15
4.02
26,85m
Advertising
board storage
15.07
Unilateral
Flash Interview
Premixed Zone
Unilateral
Flash Interview
50.21
DV-04B
15.08
DV-04B
DV-04B
542,93m
FIFA/LOC
Marketing Office
Toilet
26,80m
DV-04B
FIFA LOC
Offices
4.03
4.05
68,09m
4.04
Kit
68,07m
Room
37,83m
30.01
Stadium
Management
Facilities
34,43m
Team A Pick up
67,04m
Toilet
26,80m
16.04
Camera
Platform
4.10
Massage
Room
43,71m
53,03m
4.12
Coaches
and Technical
Room
68,07m
15.06
48,85m
TV Studio 2
16.04
Camera
Platform
34,19m
Door Closed
15.09
4.11
52,24m
Coach on Arrival Interview Positions
Coach on Arrival Interview Positions
8.22
344,26m
66,25m
FIFA LOC
Offices
15.09
Stadium
Management
Office
113,00m
4.09
Showers
7.30
Door Closed
26m
8.21
4.08
IT Stadium
Infrastructure
support
33,61m
Security Office
28,91m
16.01
Press Conference
Room
262 Seats
4.09
TV Studio 1
7.11/8.13
51,48m
Toilet
15.06
FIFA
General
Office
Massage
Room
House Mix
26,84m
30,64m
Coaches
and Technical
Room
16.02
Head Table
4.09
198,15m
50.14
Showers
43,01m
50.21
Door Closed 31,08m
Door Closed
44,08m
4.09
7.14
Mascot Dressing Room
43,51m
Team B
Dressing Room
43,56m
Mixed Zone
Ball Kids Holding
Room and Toilets
43,51m
43,34m
15.02
50.21
4.02
200,55m
37,81m
40,13m
4.01
15.02
DV-04B
Site
Manager
4.02
Referees
Dressing Room
Referees
Dressing Room
43,51m
8.03
7.13
4.16
4.15
Match Commissioner Office
14,85m
EDOR
QUEN
43,01m
8.18
STA 2
Players' Tunnel
CORR
FIFA LOC
Offices
24.14
3.02
42,36m
CORR
TE
QUEN
20,32m
30.07
Venue manager
50.21
COR
TE
8.01
FRIO
EDOR
CORR
EDOR
QUEN
CORR
EDOR
QUEN
STA 1
Doping Control
Collection
Parking
45,12m
EDOR
30.06
41,94m
Telecom
CORR
24.14
Ambulance
Parking
3.12
Advertising
Boards - Blind Side
TE
PTA 1
117,64m
Players' Outdoor
Warm-up Area
QUEN
24.02
3.05
5.01
Stretcher - Bearer's
And Medical Team
Area
EDOR
EDOR
CORR
PDU
m)
1500m
(1500x
AR
DE
ENTO ADO
FLAM
INSU PISO ELEV
PELO
3.12
7.22
Advertising
Service Tunnel Boards - Blind Side LED Advertising
Board Operator
3.13
TE
QUEN
R FRIO
80 cm
80 cm
177,17m
3.03
Substitutes' Bench
Team B
REDO
100,00m
45,98m
F&B Storage
371,61m
Outsourced
Staff Dinning
Hall
Available
Room
11.03
Merchandising
Storage
28,89m
7.27
30.01
Hospitality
Offices
Team B Pick up
50.21
34,43m
FIFA LOC
Offices
30.05
33,87m
Parking
37,50m
30.03
30.03
Team A
Equip. Van
Team B
Equip. Van
78,92 m
Available
Room
39,65m
Lift Shared
Logistics / Hospitality
NUMBER
3.02
3.03
3.04
3.05
3.07
3.11
3.12
3.13
4.01
4.02
4.02
4.03
4.04
4.05
4.08
4.09
4.09
4.10
4.11
4.12
4.15
4.16
5.01
5.02
6.00
7.01
7.02
7.03
7.05
7.11
7.13
7.14
7.15
7.22
7.25
7.27
7.30
8.01
8.03
8.05
8.18
8.20
8.21
8.22
8.23
9.01
9.02
9.03
11.02
11.03
11.04 J
SPACE NAME
Player's Tunnel
Substitutes' Bench Tem A and B
Fourth Official's Bench
Player's Outdoor Warm - up area
Photographer's Positions
LED Advertising Board Pith Perimeter
Advertising Boards - Blind Side
Service Tunnel
Team A Dressing Room
AREA
-
6
5
4
3
2
1
0
No.
25.02.2013
05.10.2012
27.07.2012
29.06.2012
11.05.2012
11.04.2012
31.01.2012
Date:
Issued to LOC
Issued to LOC
Issued to LOC
Issued to BOQ
Issued to LOC
Issued to LOC
Issued to LOC
Description:
Revisions
Showers
Toilet
Massage Room
Kit Manager's Room
Coaches and Techical Room
Team B, dressing room
Showers
Toilet
Massage Room
Kit Manager's Room
Coaches and Technical Room
Referees Dressing Room
Referees Dressing Room
Stretcher- Bearer's and Medical
Players' Medical Room
Doping Control
General coordinator's (GC) office
General coordinator's (GC)Meeting Room
GC storage room
Local Organising Committee
Brazil
-
Match Commissioner Office
Security Office
Ball Kids Holding and Toilets
Mascot Dressing Room
Marketing Office
LED Advertising Boards Operator
Advertising Boards Storage
Hospitality Office
IT Stadium Infrastructure Support
Venue Manager
Site Manager
Stadium ENB
BRS
IT Office
LOC General Office
Ceremonies Office
Stadium Management Office
Stadium Facilities Management Offices
Stadium Grounds Keeper Facilities
Ceremonies Changing Rooms
Ceremonies Prop Store
BRASILIA
Ceremonies Additional Facilities
F&B Storage
Merchandising Storage
Satelite Waste Removal
12.01/12.03 Stadium Signage and Decor Office
13.02B
13.02C
15.01
15.02
15.06
15.07
15.08
15.09
16.01
16.02
16.04
24.02
24.14
30.01
30.03
30.03
30.05
30.06
30.07
31.05
31.07
50.07
50.14
50.19
50.21
50.27
50.29
-
Scullery
Central Kitchen
Multilateral Flash Interview
Unilateral Flash Interview
TV Studio
Pre Mixed Zone
Mixed Zone
Coach on Arrivel Interview Positions
Press Conference Room
Head table
Camera platform
Primary technical area (PTA) 1
Secondary technical areas (STA)
Team A and B Bus Parking
Team A Equip. Van
Team B Equip. Van
Referee's Parking
Ambulance Parking
Doping Control Collection Parking
Security Storage
Security Post
Security Extra Facilities
FIFA General Office
Switch Cabines
FIFA LOC Offices
Outsourced Staff Dinning Hall
F&B Staff Changing Room
POP Room
E
N
S
W
Notes:
-
1)
VIP handicapped parking spaces will be considered
inside VVIP parking (operational issue between protocol,
security and transportation);
2)
GC and fifa authorities parking spaces will be
considered inside vvip parking;
3)
A shuttle service will be provided for all constituent
groups being served by remote parking solutions;
4)
Fits rooms (FIFA it service rooms, coloured in light
green) are still to have their location confirmed due to
architectural base drawings revision and update.
Project No.
XXXXXX
Draw Date:
TVP
Scale:
25.07.2011
1 / 500
Sheet Title:
FCC
LEVEL S3
be delivered by each hc to loc in order to meet FIFA its
requirements.
-
Draw by:
out proposal to the HCS in order to make the solution
compatible with legacy mode plan.
(Former Level -3)
File Name:
PLATAFORMAS_MEDIA CONFERENCE
6
5
4
3
2
1
0
No.
25.02.2013
05.10.2012
27.07.2012
29.06.2012
11.05.2012
11.04.2012
27.01.2012
Date:
22H
Issued to LOC
Issued to LOC
Issued to LOC
Issued to BOQ
Issued to LOC
Issued to LOC
Issued to LOC
Description:
Revisions
Annoucer Platforms` Position
shown only for reference. Final
location still to be defined.
Camera Platforms` Position
shown only for reference. Final
location still to be defined.
Local Organising Committee
Brazil
Stadium ENB
BRS
BRASILIA
E
N
TRIBUNE - SEAT CAPACITY
Written Press with Desk
Written Press without Desk
Photographers
Observers
Commentary Position Desk
300
300
50
50
30
Notes:
1)
VIP handicapped parking spaces will be considered
inside VVIP parking (operational issue between protocol,
security and transportation);
2)
GC and fifa authorities parking spaces will be
considered inside vvip parking;
3)
A shuttle service will be provided for all constituent
groups being served by remote parking solutions;
4)
Fits rooms (FIFA it service rooms, coloured in light
green) are still to have their location confirmed due to
architectural base drawings revision and update.
S
W
Project No.
Draw by:
XXXXXX
Draw Date:
TVP
Scale:
25.07.2011
1 / 500
Sheet Title:
FCC
LEVEL L5
(Former L3)
File Name:
PLATAFORMAS_MEDIA TRIBUNE
LEGENDA DE ACABAMENTOS
LEGENDA
A
50.20
PISOS
PE-01
Piso nivelado de terra
compacta coberta de brita
PE-02
Piso intertravado a definir
PE-03
Piso de borracha
antiderrapante
Telefonia
Ar Condicionado
2.5
2.5
2.5
PE-04
A
PI-02
24h
Fornecimento de
eletricidade ininterrupto
TV
Circuito de TV
Carpete a definir
antiderrapante
Cerca Fixa
PI-03
3
+0,00
50.20
Passagem coberta de pedestres VIP
*
Acabamento sobre piso
Cerca Fixa Alta
com placa de madeira laminada
(100 x 100mm)
PI-01*
definir
+0,10
DV-01
DV-02
DV-03
DM-01
Tendas 3x3: cobertura
2.5
2.5
2.5
FE-03
50.20
A
+0,00
painel de vidro
porta
Painel modular de chapa
VE-01 Parede tipo dry wall com
0 22.06.2012
No.
Data:
VE-02
sobre alvenaria existente
VE-03
50.20 - PLANTA - PASSAGEM COBERTA VIP
(TEMP2)
VE-04
ESCALA 1:50
FORRO
FR-01 Estrutura Modular de
Travamento
FR-02 Forro Modular em PVC ou
FR-03 Forro em Tecido a definir
FR-04
Local Organising Committee
Brazil
existente, cor branca, quando
FR-05
Tendas 3x3 m: cobertura
Tipologia a cargo do integrador/sede
DIVERSOS
FE-01
4.69
FE-02
FE-03
3.01
Largura ideal 3 m
(A ser confirmado in loco)
PI-01
Rede de Dados e Voz
T.I.
FE-04
FE-03
DEG
NOTAS
50.20
Passagem coberta VIP
0.00
PERM1
Carpete sobre piso elevado
de madeira
PI-01*
TEMP2
Data:
22.06.2012
TEMP3
NOTAS:
50.20 - CORTE AA - PASSAGEM COBERTA VIP
1-Estrutura Permanente
1) ESCALA INDICATIVA.
CONFIRMADAS IN LOCO.
2) DESENVOLVIMENTO DO PROJETO EXECUTIVO E
(TEMP2) -
ESCALA 1:50
0
0,5
1
2
ESCALA = METROS
INTEGRADOR/SEDE;
3)
COMPETENTES LOCAIS A CARGO DO INTEGRADOR/SEDE;
4)
5)
PELA CIDADE-SEDE;
TEMP4
Escala:
de Permanente
1 / 50
50.20
001
PASSAGEM COBERTA VIP PLANTA E CORTE
VIP COVERED PATHWAY FLOOR PLAN & SECTION
Nome:
GEN_ESP_50.20_V7_R1
FIFA Colour Codes
Annotation Legend
Field of Play
People Flow
Competitions
Vehicle Flow
FIFA / LOC Offices
Entrance
Ceremonies
Hospitality
Outer Perimeter
Private Suite
Inner Perimeter
Bossa Nova Studio
Temporary Fence
FE-01
Business Lounge
Hospitality Kitchen
Temporary Fence
FE-02
Hospitality BOH
Media
Temporary Fence
FE-03
TV / Broadcast
Temporary Fence
FE-04
IT & T
Temporary Dry Wall
Security
VIP / VVIP Protocol
Temporary Partition
Wall
Ticketing
Accreditation
Checkpoint
Accreditation
Drop-Off Car
Commercial Display
Drop-Off Bus
Concessions
Spectators
S
Shuttle to Stadium
Medical
H
Helipad
G1
Gate
Volunteers
VIP Flow Covered Pathway
Logistics
VVIP Lounge
Skyboxes
VIP Lounge
4.21
4.21
E
Flow Legend
Bossa Nova Lounge
EMERGENCY
Parking
Competitions
7.15
2.10
Parking
Technical Areas
Concourse GA
Satellite
Kitchen
Satellite
Kitchen
3.37
VIP
Access
Concourse GA
Concourse GA
Mobility Impaired
FIFA / LOC Offices
PERFIL ATUAL DO TERRENO
VVIP Access
Public Transport
Ceremonies
Hospitality
Opening Ceremonies
Aditional Facilities
Mixed Zone
Mag and Bag
Media
Turnstiles
TV / Broadcast
VIP Protocol
CROSS SECTION - WEST SIDE
123
Capacity
25.02.2013
05.10.2012
27.07.2012
22.06.2012
11.05.2012
11.04.2012
31.01.2012
Date:
Issued to LOC
Issued to LOC
Issued to LOC
Issued to BOQ
Issued to LOC
Issued to LOC
Issued to LOC
Description:
VVIP Protocol
ESC: 1 / 500
Spectators
Medical
Logistics
Marketing
Flooring Legend
Interlocked Concrete
Plastic
Reinforced Plastic
Rubber over
Platforms
SLAB -(Roof)
1142,04
1137,34
VIP Flow Covered Pathway
Available
1133,10
6
5
4
3
2
1
0
No.
Satellite Kitchen
1129,44
Revisions
3.37
C:\Users\thiago.pelakauskas\Desktop\TEF\fcc2013_oe_4ct_l.jpg
3.02
Satellite Kitchen
1125,00
1128,70
7.15
2.10
4.21
Local Organising Committee
Brazil
4.21
3.02
Available
VIP Access
1120,55
Stadium ENB
BRS
PERFIL ATUAL DO TERRENO
BRASILIA
VVIP Access
E
N
S
W
Project No.
DETAIL CROSS SECTION - WEST SIDE
Draw by:
XXXXXX
ESC: 1 / 100
Draw Date:
25.07.2011
Notes:
TVP
Scale:
as indicated
Sheet Title:
CROSS SECTION
WEST SIDE
File Name:
FCC_FLH_BRS_450_CS_R6_V6
56,84
Stadium ENB
BRASILIA
E
N
S
W
Project No.
XXXXXX
Draw Date:
13.03.2013
Draw by:
PNUD
Scale:
1 / 500
Sheet Title:
FCC
MASTERPLAN
File Name:
PASSARELA VIP
Download

Sem nome