SAO PAULO, BRAZIL AND
SOUTH AMERICA
Brazil
Sao Paulo
State
Area (km²)¹
Brazil
Sao Paulo
RMSP
Population
(thousand inhab)²
% Population
8.514.877
183.987
248.210
39.827
21,65%
7.944
19.221
10,44%
¹ IBGE – Res 05 , October 2002
² Estimated Population – IBGE, 2007
-
METROPOLITAN REGIONS
São Paulo Metropolitan Region
Campinas Metropolitan Region
39 cities
19,2 million inhabitants*
19 cities
2,6 million
inhabitants *
Baixada Santista
Metropolitan Region
9 cities
1,6 million inhabitants *
*IBGE, Estimated population 2007.
Sao Paulo
State
AREA OF OPERATION

São Paulo State Metropolitan Regions:
 São Paulo
39 cities, 19.5 million inhabitants
 Campinas
19 cities, 2.6 million inhabitants
9 cities, 1.6 million inhabitants
 Baixada Santista

São Paulo State Metropolitan Transportation Authority
Metropolitan mass transit system, including rail rapid transit.

Companies linked to the São Paulo State Metropolitan Transportation
Authority (STM):
 São Paulo Subway – Metrô
(Companhia do Metropolitano de São Paulo - Metrô)
 São Paulo Metropolitan Train Company – CPTM
(Companhia Paulista de Trens Metropolitanos – CPTM)
 Metropolitan Urban Transport Company – EMTU
(Empresa Metropolitana de Transportes Urbanos de São Paulo)

7,3 million passengers per day
METROPOLITAN
TRANSPORTATION NETWORK
CPTM
METRÔ
EMTU
22 cities
São Paulo city
67 cities
(3 Metropolitan Regions)
2 million
3.4 million
2 million
passengers/day
passengers/day
passengers/day
33 km BRT Corridor
262 km network
61 km network
6 lines
4 lines
844 lines
89 stations
55 stations
10 terminals
5,380 Bus fleet
Francisco Morato
Today´s Network
7
Tucuruvi
Palmeiras
Barra Funda
12
Luz
V.Madalena
Itapevi
EL
Tatuapé
CorinthiansItaquera
Sé
Guaianazes
8
Paraíso
Alto do
Ipiranga
Lgo. Treze
Capão Redondo
Jabaquara
São Mateus
Santo André
Jurubatuba
Diadema
São Bernardo
Grajaú
9
Estudantes
Ferrazópolis
10
Rio Grande
da Serra
11
EXPANSION PLAN:
STM´s KEY DRIVERS

Improving the commuter rail system to 240 km with Metrô quality standard

Increasing the fleet: 107 new trainsets (47 Metrô / 60 CPTM)

Refurbishing the existing train fleet

Rationalizing the Metropolitan Bus System

Developing new bus corridors – BRT

Adopting modern transport system: Tramway
INVESTMENT PROGRAM
R$ 20 billion
largest infrastructure investment program
underway in Brazil
Francisco Morato
NETWORK
7
EXPANSION PLAN
EA
Aeroporto
Taboão
Zezinho Magalhães (Cecap)
6 C.C. Ruth
Brasilândia
13
Cardoso
Tucuruvi
Freguesia
Palmeiras
Barra Funda
Luz
Brás
Itapevi
8
V.Madalena
Paulista
Vila
Prudente Oratório
Paraíso
Tamanduateí
Alto do
Ipiranga
Morumbi
Brooklin –
Campo Belo
Adolfo
Jabaquara
Pinheiro
Capão Redondo
São Mateus
São
Caetano
Santo André
Ea
Mauá
Jurubatuba
Autódromo
9
Suzano
EL
Corinthians-Itaquera Guaianazes Ferraz
Pinheiros
Butantã
Vila Sônia
12
Ticoatira
Diadema
São Bernardo
Grajaú
Ferrazópolis
10
Rio Grande
da Serra
11
EL
LINE 2 – GREEN
+ 100 thousand
Passengers per day
in 2010
Daily Ridership
Today: 380 thousand
2010: 800 thousand
(extension)
Extension –
design
phase
2,3 km
Section
in Operation
Vila
Prudente
Oratório /
Pq. São Lucas
Tamanduateí
Sacomã:
Transfer with Tiradentes
Express and EMTU
Sacomã
Under
Construction
3,9 km
LINE 4 – YELLOW
1st Phase: 2010
Luz
Transfer with
CPTM Lines
705 thousand Passengers
per day in 2010 (1st phase)
República
HigienópolisMackenzie
Paulista
Fradique
Coutinho
Oscar Freire
Pinheiros
Faria Lima
Butantã
São Paulo – Morumbi
Vila Sônia
Line under
Construction
12,8 km
Transfer with
Emerald Line
Transfer with
Blue, Red and Green
Lines
1st Phase
2nd Phase
LINE 5 – LILAC
Chácara
Klabin
Daily Ridership
Today: 106 thousand
2010: 286 thousand
Servidor
Moema
Santa
Cruz
Vila
Clementino
Ibirapuera
Água Espraiada
Brooklin – Campo Belo
Line in
Operation
Borba Gato
Vila das
Belezas
Giovani
Gronchi
Alto da Boa Vista
Design Phase
5,7 km
Campo Limpo
Adolfo Pinheiro
Capão
Redondo
Santo Amaro
Largo Treze
1st Phase
2nd Phase
Integration
with Blue and
Green Lines
LINE 6 – ORANGE (Project)
Brasilândia
C.C. Ruth Cardoso
Morro Grande
651 thousand
passengers transported
per day in 2014
Jardim Primavera
Hospital
Vila Penteado
João Paulo I
Freguesia do Ó
Design Phase
19 km
Santa Marina
Água Branca
Turiaçu
PUC
Pacaembu
Integration with
Blue, Yellow, Ruby and
Diamond Lines
Angélica
HigienópolisMackenzie
Bela
Vista
13 de Maio
São Joaquim
CONGONHAS AIRPORT TRAMWAY
Phase 1
3,7 km
Morumbi
(CPTM)
18 thousand Passengers
Saúde
transported
(Phase 1)
Água Espraiada
Congonhas
São Judas
Phase 2
6,1 km
58 thousand Passengers
transported
(Phase 1 e 2)
Jabaquara
Phase 3
4,3 km
85 thousandConceição
Passengers
transported
(3 Phases)
SURFACE RAIL RAPID SYSTEM UPGRADE
160KM
Metrô standard:
Reliability
Safety (Signaling)
Speed (up to 5 min.
headway reduction,
more than doubling
service offer)
Station quality
Train quality
LINE 10 - TURQUOISE
AND ABC EXPRESS
Luz
Brás
Moóca
Ipiranga
Line in Operation
Tamanduateí
Disign Phase
25,2 km
Daily Ridership
Today: 270 thousand
2010: 670 thousand
São Caetano
Utinga
Pref. Saladino
Santo André
Capuava
Mauá
Guapituba
Ribeirão PIres
Rio Gde da Serra
LINE 11 – CORAL - EAST EXPRESS
AND LIGHT METRÔ - FERRAZ / MOGI
Passengers transported
Luz – Guaianazes (today): 250 thousand/ day
Luz – Ferraz: 395 thousand/day
East Express
in operation
Extension to
Ferraz de
Vasconcelos
Tramway
Ferraz – Mogi
IN STUDY
GUARULHOS AIRPORT EXPRESS
TPS 1 e 2
CECAP:
Transfer with
Guarulhos – São Paulo
BRT corridor
TPS 3
CECAP
Airport Express:
20 thousand passengers
transported per day
Design Phase
28,1 km
USP LESTE
ENGº GOULART
PENHA
COM.
ERMELINO
Sapphire Line
(existing)
Design Phase
20,2 km
LUZ
BRÁS
TATUAPÉ
Jade Line:
106 thousand passengers
transported per day
INTEGRATED METROPOLITAN TRANSPORT
SYSTEM – BAIXADA SANTISTA
165 thousand passengers
per day
E.T. PÇA DA
REPÚBLICA
(1st phase - SIM)
TERMINAL
VALONGO
B
TERMINAL
BARREIROS
TERMINAL
PORTO
A
Linha A – Tramway
Linha B – BRT Corridor
Bus regular lines EMTU (integrated)
E.T. PONTA
DA PRAIA
TERMINAL
FERRY BOAT
GUARULHOS – SÃO PAULO
BRT CORRIDOR
140 thousand passengers
transported per day
Term.
Taboão
Município de
Guarulhos
Município de
São Paulo
Term Intermodal
Design Phase
22,5 km
Term.
CECAP
Term.
Vila Galvão
Term. Emílio Ribas
Term. Antonio
de Souza
Est. Tucuruvi
METRÔ
Transfer with Blue
Line (subway)
Transfer with Jade
Line (CPTM trains)
NORTHWEST CORRIDOR – CAMPINAS
Terminal
Americana
Design
Phase
110 thousand passengers
per day
Terminal
Nova Odessa
Terminal
Sumaré
Under
Construction
32,7 km
Terminal
Hortolândia
Est. Tranf.
Anhanguera
Est. Embarque
Monte Mor
Terminal
Campo Grande
(municipal)
Terminal
Campinas
Northwest Corridor (under construction)
Northwest Corridor (design phase)
Additional Conection
60 NEW TRAINSETS BY 2010
CPTM
12 new trainsets
in operation
Emerald Line
47 NEW TRAINSETS BY 2010
Metrô
1st NEW TRAIN
In operation
MAR/09
PPP LINE 8 – DIAMOND:
REFURBISHING AND NEW TRAINS
• Refurbishing of 12 trains:
• Air conditioning
• Increasing Motorization
• 24 New Trains
• Public-Private
Partnership:
3 TRAINS
REFURBISHED
BY 2010
• 20 years of contract
• Preventive and Corrective
Maintenance
REFURBISHING OF
CPTM TRAINSETS
BEFORE
AFTER
REFURBISHING OF
CPTM TRAINSETS
27 TRAINSETS
REFURBISHED
IN OPERATION
REFURBISHING OF
METRÔ TRAINS
REFURBISHING OF TRAINS
LINES 1 and 3
98 TOTAL
HEADWAY REDUCTION
LINE
CURRENT HEADWAY
2010 HEADWAY
Line 1 – Blue
109 sec
95 sec
Line 2 – Green
150 sec
128 sec
Line 3 – Red
101 sec
80 sec
-
131 sec
Line 5 – Lilac
307 sec
208 sec
Line 7 – Ruby
10 min
4 min
Line 8 – Diamond
9 min
5 min
Line 9 – Emerald
7 min
4 min
Line 10 – Turquoise
10 min
6 min
-
8 min
Line 11 – Coral
11 min
8 min
East Express (Line 11 – Coral)
7 min
5 min
Line 12 – Sapphire
11 min
4 min
Line 13 – Jade
-
10 min
Airport Express (Line 14 – Onyx)
-
15 min
Line 4 – Yellow
ABC Express (Line 10 – Turquoise)
TRAVEL TIME GAIN
Routes
Current Time
(minutes/day)
Time Gain
(minutes/day)
Butantã
Luz
120
90
Capão Redondo
Sé
198
54
Grajaú
Campo Belo
200
114
Grajaú
Clínicas
244
142
Grajaú
Sé
244
128
Itaquera
Pinheiros
118
40
Lapa
Pinheiros
76
34
Tucuruví
Pinheiros
100
44
USP Leste
Pinheiros
128
62
Vila Prudente
Jabaquara
100
44
Vila Prudente
Pinheiros
166
114
Vila Prudente
Sé
80
40
Diadema
Vila Prudente
200
118
Francisco Morato
Paulista
192
62
Guarulhos
Tucuruvi
167
89
Itapevi
Paulista
166
46
Itaquaquecetuba
Sé
160
30
Perus
Pinheiros
106
32
Poá
Luz
122
30
Santo André
Barra Funda
92
30
Taboão da Serra
Luz
164
44
Download

São Paulo State Metropolitan Regions