SAO PAULO, BRAZIL AND SOUTH AMERICA Brazil Sao Paulo State Area (km²)¹ Brazil Sao Paulo RMSP Population (thousand inhab)² % Population 8.514.877 183.987 248.210 39.827 21,65% 7.944 19.221 10,44% ¹ IBGE – Res 05 , October 2002 ² Estimated Population – IBGE, 2007 - METROPOLITAN REGIONS São Paulo Metropolitan Region Campinas Metropolitan Region 39 cities 19,2 million inhabitants* 19 cities 2,6 million inhabitants * Baixada Santista Metropolitan Region 9 cities 1,6 million inhabitants * *IBGE, Estimated population 2007. Sao Paulo State AREA OF OPERATION São Paulo State Metropolitan Regions: São Paulo 39 cities, 19.5 million inhabitants Campinas 19 cities, 2.6 million inhabitants 9 cities, 1.6 million inhabitants Baixada Santista São Paulo State Metropolitan Transportation Authority Metropolitan mass transit system, including rail rapid transit. Companies linked to the São Paulo State Metropolitan Transportation Authority (STM): São Paulo Subway – Metrô (Companhia do Metropolitano de São Paulo - Metrô) São Paulo Metropolitan Train Company – CPTM (Companhia Paulista de Trens Metropolitanos – CPTM) Metropolitan Urban Transport Company – EMTU (Empresa Metropolitana de Transportes Urbanos de São Paulo) 7,3 million passengers per day METROPOLITAN TRANSPORTATION NETWORK CPTM METRÔ EMTU 22 cities São Paulo city 67 cities (3 Metropolitan Regions) 2 million 3.4 million 2 million passengers/day passengers/day passengers/day 33 km BRT Corridor 262 km network 61 km network 6 lines 4 lines 844 lines 89 stations 55 stations 10 terminals 5,380 Bus fleet Francisco Morato Today´s Network 7 Tucuruvi Palmeiras Barra Funda 12 Luz V.Madalena Itapevi EL Tatuapé CorinthiansItaquera Sé Guaianazes 8 Paraíso Alto do Ipiranga Lgo. Treze Capão Redondo Jabaquara São Mateus Santo André Jurubatuba Diadema São Bernardo Grajaú 9 Estudantes Ferrazópolis 10 Rio Grande da Serra 11 EXPANSION PLAN: STM´s KEY DRIVERS Improving the commuter rail system to 240 km with Metrô quality standard Increasing the fleet: 107 new trainsets (47 Metrô / 60 CPTM) Refurbishing the existing train fleet Rationalizing the Metropolitan Bus System Developing new bus corridors – BRT Adopting modern transport system: Tramway INVESTMENT PROGRAM R$ 20 billion largest infrastructure investment program underway in Brazil Francisco Morato NETWORK 7 EXPANSION PLAN EA Aeroporto Taboão Zezinho Magalhães (Cecap) 6 C.C. Ruth Brasilândia 13 Cardoso Tucuruvi Freguesia Palmeiras Barra Funda Luz Brás Itapevi 8 V.Madalena Paulista Vila Prudente Oratório Paraíso Tamanduateí Alto do Ipiranga Morumbi Brooklin – Campo Belo Adolfo Jabaquara Pinheiro Capão Redondo São Mateus São Caetano Santo André Ea Mauá Jurubatuba Autódromo 9 Suzano EL Corinthians-Itaquera Guaianazes Ferraz Pinheiros Butantã Vila Sônia 12 Ticoatira Diadema São Bernardo Grajaú Ferrazópolis 10 Rio Grande da Serra 11 EL LINE 2 – GREEN + 100 thousand Passengers per day in 2010 Daily Ridership Today: 380 thousand 2010: 800 thousand (extension) Extension – design phase 2,3 km Section in Operation Vila Prudente Oratório / Pq. São Lucas Tamanduateí Sacomã: Transfer with Tiradentes Express and EMTU Sacomã Under Construction 3,9 km LINE 4 – YELLOW 1st Phase: 2010 Luz Transfer with CPTM Lines 705 thousand Passengers per day in 2010 (1st phase) República HigienópolisMackenzie Paulista Fradique Coutinho Oscar Freire Pinheiros Faria Lima Butantã São Paulo – Morumbi Vila Sônia Line under Construction 12,8 km Transfer with Emerald Line Transfer with Blue, Red and Green Lines 1st Phase 2nd Phase LINE 5 – LILAC Chácara Klabin Daily Ridership Today: 106 thousand 2010: 286 thousand Servidor Moema Santa Cruz Vila Clementino Ibirapuera Água Espraiada Brooklin – Campo Belo Line in Operation Borba Gato Vila das Belezas Giovani Gronchi Alto da Boa Vista Design Phase 5,7 km Campo Limpo Adolfo Pinheiro Capão Redondo Santo Amaro Largo Treze 1st Phase 2nd Phase Integration with Blue and Green Lines LINE 6 – ORANGE (Project) Brasilândia C.C. Ruth Cardoso Morro Grande 651 thousand passengers transported per day in 2014 Jardim Primavera Hospital Vila Penteado João Paulo I Freguesia do Ó Design Phase 19 km Santa Marina Água Branca Turiaçu PUC Pacaembu Integration with Blue, Yellow, Ruby and Diamond Lines Angélica HigienópolisMackenzie Bela Vista 13 de Maio São Joaquim CONGONHAS AIRPORT TRAMWAY Phase 1 3,7 km Morumbi (CPTM) 18 thousand Passengers Saúde transported (Phase 1) Água Espraiada Congonhas São Judas Phase 2 6,1 km 58 thousand Passengers transported (Phase 1 e 2) Jabaquara Phase 3 4,3 km 85 thousandConceição Passengers transported (3 Phases) SURFACE RAIL RAPID SYSTEM UPGRADE 160KM Metrô standard: Reliability Safety (Signaling) Speed (up to 5 min. headway reduction, more than doubling service offer) Station quality Train quality LINE 10 - TURQUOISE AND ABC EXPRESS Luz Brás Moóca Ipiranga Line in Operation Tamanduateí Disign Phase 25,2 km Daily Ridership Today: 270 thousand 2010: 670 thousand São Caetano Utinga Pref. Saladino Santo André Capuava Mauá Guapituba Ribeirão PIres Rio Gde da Serra LINE 11 – CORAL - EAST EXPRESS AND LIGHT METRÔ - FERRAZ / MOGI Passengers transported Luz – Guaianazes (today): 250 thousand/ day Luz – Ferraz: 395 thousand/day East Express in operation Extension to Ferraz de Vasconcelos Tramway Ferraz – Mogi IN STUDY GUARULHOS AIRPORT EXPRESS TPS 1 e 2 CECAP: Transfer with Guarulhos – São Paulo BRT corridor TPS 3 CECAP Airport Express: 20 thousand passengers transported per day Design Phase 28,1 km USP LESTE ENGº GOULART PENHA COM. ERMELINO Sapphire Line (existing) Design Phase 20,2 km LUZ BRÁS TATUAPÉ Jade Line: 106 thousand passengers transported per day INTEGRATED METROPOLITAN TRANSPORT SYSTEM – BAIXADA SANTISTA 165 thousand passengers per day E.T. PÇA DA REPÚBLICA (1st phase - SIM) TERMINAL VALONGO B TERMINAL BARREIROS TERMINAL PORTO A Linha A – Tramway Linha B – BRT Corridor Bus regular lines EMTU (integrated) E.T. PONTA DA PRAIA TERMINAL FERRY BOAT GUARULHOS – SÃO PAULO BRT CORRIDOR 140 thousand passengers transported per day Term. Taboão Município de Guarulhos Município de São Paulo Term Intermodal Design Phase 22,5 km Term. CECAP Term. Vila Galvão Term. Emílio Ribas Term. Antonio de Souza Est. Tucuruvi METRÔ Transfer with Blue Line (subway) Transfer with Jade Line (CPTM trains) NORTHWEST CORRIDOR – CAMPINAS Terminal Americana Design Phase 110 thousand passengers per day Terminal Nova Odessa Terminal Sumaré Under Construction 32,7 km Terminal Hortolândia Est. Tranf. Anhanguera Est. Embarque Monte Mor Terminal Campo Grande (municipal) Terminal Campinas Northwest Corridor (under construction) Northwest Corridor (design phase) Additional Conection 60 NEW TRAINSETS BY 2010 CPTM 12 new trainsets in operation Emerald Line 47 NEW TRAINSETS BY 2010 Metrô 1st NEW TRAIN In operation MAR/09 PPP LINE 8 – DIAMOND: REFURBISHING AND NEW TRAINS • Refurbishing of 12 trains: • Air conditioning • Increasing Motorization • 24 New Trains • Public-Private Partnership: 3 TRAINS REFURBISHED BY 2010 • 20 years of contract • Preventive and Corrective Maintenance REFURBISHING OF CPTM TRAINSETS BEFORE AFTER REFURBISHING OF CPTM TRAINSETS 27 TRAINSETS REFURBISHED IN OPERATION REFURBISHING OF METRÔ TRAINS REFURBISHING OF TRAINS LINES 1 and 3 98 TOTAL HEADWAY REDUCTION LINE CURRENT HEADWAY 2010 HEADWAY Line 1 – Blue 109 sec 95 sec Line 2 – Green 150 sec 128 sec Line 3 – Red 101 sec 80 sec - 131 sec Line 5 – Lilac 307 sec 208 sec Line 7 – Ruby 10 min 4 min Line 8 – Diamond 9 min 5 min Line 9 – Emerald 7 min 4 min Line 10 – Turquoise 10 min 6 min - 8 min Line 11 – Coral 11 min 8 min East Express (Line 11 – Coral) 7 min 5 min Line 12 – Sapphire 11 min 4 min Line 13 – Jade - 10 min Airport Express (Line 14 – Onyx) - 15 min Line 4 – Yellow ABC Express (Line 10 – Turquoise) TRAVEL TIME GAIN Routes Current Time (minutes/day) Time Gain (minutes/day) Butantã Luz 120 90 Capão Redondo Sé 198 54 Grajaú Campo Belo 200 114 Grajaú Clínicas 244 142 Grajaú Sé 244 128 Itaquera Pinheiros 118 40 Lapa Pinheiros 76 34 Tucuruví Pinheiros 100 44 USP Leste Pinheiros 128 62 Vila Prudente Jabaquara 100 44 Vila Prudente Pinheiros 166 114 Vila Prudente Sé 80 40 Diadema Vila Prudente 200 118 Francisco Morato Paulista 192 62 Guarulhos Tucuruvi 167 89 Itapevi Paulista 166 46 Itaquaquecetuba Sé 160 30 Perus Pinheiros 106 32 Poá Luz 122 30 Santo André Barra Funda 92 30 Taboão da Serra Luz 164 44