Resilient Cities 2011 Bonn, Germany 2nd World Congress on Cities and Adaptation to Climate Change Urban Management and Inclusiveness : Belo Horizonte’s case study Belo Horizonte on the map MINAS GERAIS BRAZIL Territorial extension: 331 km2 Population: 2,4 million inhab. Metropolitan area pop.: 4,5 million inhab. 4th biggest Brazilian city (population) Economically active population: 51% Main activity: services The strategic plan of short and medium term: 2009-2012 (Goals and Results) HEALTHY CITY CITY WITH ALL WELL LOOKED AFTER SLUMS EDUCATION SHARED CITY CITY WITH MOBILITY SAFE CITY SUSTAINABLE CITY CITY FOR ALL PROSPERITY CULTURE MODERNITY METROPOLITAN INTEGRATION MUNICIPAL HOUSING POLICY (PMH) URBEL’s universo atuation BH Area ___________________________ 331 sq km Population _________________________ 2.412.937 * Number of Squatter Settlements_____________ 208 ** Population in Squatter Settlements____ 471.344 Hab. ** (19,5% of total population of town) Homes in Squatter Settlements ___________129.702 ** Slums __________________________________174 ** Apartment complexes (before 1993) ___________ 24 ** Other settlements __________________________10 ** Areas of social interest__________________16,8 sq km (5% of total area of town ) ** Buldings of high or very high risk:__________ 3.789 *** * SOURCE: IBGE / 2007 ** SOURCE: SIT / DVPL / DPL / 2007 - URBEL *** SOURCE DIAGNÓSTICO RISCO - 2009 - URBEL VILA VIVA PROGRAM Specific Global Plan (PGE) Data collection urbanisticenvironmental legal socio-economic and organizational Integrated diagnosis Intervention propositions Community mobilization Priorization of interventions PGE - directs the government assistance for external resources VILA VIVA PROGRAM Princípios da Reabilitação Estrutural Integration of urban and social policies Intersectoral and shared management Desenvolvimento extension of the proposed improvements urbano sustentável sustainability of actions política de inclusão social e generation geração depolicies renda Social inclusion and income integration of informal settlements to the rest of the city VILA VIVA - Aglomerado da Serra Caracterization of the area Experimental area - 2nd biggest group of slums in the Metropolitan Area Pioneering deployment of PGE (6 slums): Santana do Cafezal, Marçola, N. Srª. Aparecida, N. Srª. da Conceição, N. Srª. de Fátima e Novo São Lucas. area: 1,5 km² (approx.) population: 60,000 inhab (approx.) START: 2005 FINISH: 2010 average income per family: 1 to 2 Brazilian minimum monthly wage VILA VIVA - Aglomerado da Serra Urban Diagnosis Rugged topography High population and construction density Low accessibility VILA VIVA - Aglomerado da Serra Urban Diagnosis Areas of high geological risk Irregular occupation of slopes = landslides squatter settlements VILA VIVA - Aglomerado da Serra Environmental Diagnosis Waste accumulation and deforestation + Contamination of water curses and drainage lines environmental degradation 4Lack of basic sanitation 4Insufficient / irregular drainage systems VILA VIVA - Aglomerado da Serra Social Diagnosis Difficulty of access to property 4Irregular or clandestine urbanization. Social vulnerability 4Unemployment, violence and drugs. Weakness of health care 4Difficult access of preventive medicine. 4Few areas for specialized health care. Weakness of education 4Few places available in schools VILA VIVA - Aglomerado da Serra Lines of action Environmental requalification 4Evacuation of dreinage lines 4Protection of springs and preservation of natural courses Interface with DRENURBS PROGRAM (municipal urban dreinage program) 4Riparian vegetation recovery Planting of native trees 3ª Água Park 5 Parks: 1ª, 2ª e 3ª Água, Pocinho and Cardoso VILA VIVA - Aglomerado da Serra Linhas de ação Sanitation system deployment 4 Sanitation 4 universalization of collection and sewage treatment; 4 interception along the thalwegs; 4 Dreinage 4 priorization of natural water flows; 4 cleaning of thalwegs; 4 retention basins against floods; 4 Water Supply 4 extension of supply nets; 4 homes with individual nets. 4 Urban Cleaning 4 expansion of solid waste collection. VILA VIVA - Aglomerado da Serra Linhas de ação Eradication of risk areas Revegetation of slopes Treatment of slopes Dams to prevent flood VILA VIVA - Aglomerado da Serra Linhas de ação Restructuring of housing system and land regularization Planta tipo do apartamento de 2 quartos Private property Public property Prescription - Donation State property: Government agreement - Donation Municipal property: Direct qualification (buying and selling) VILA VIVA - Aglomerado da Serra Linhas de ação Social-organizational development Environmental and Sanitary Education Program: participatory management for the use and preservation of urban facilites (schools, transportation) and green areas Social monitoring in the process of removal and resettlement: pre e post-moving BH-CIDADANIA PROGRAM - 2 centers VILA VIVA - Aglomerado da Serra Linhas de ação Social-organizational development Professional training program 4 Identification of potencial demands of the community 4 Programs to generate employment and income - local labor force Produção dos uniformes dos operários da obra Fábrica de tijolos de concreto para as unidades habitacionais VILA VIVA / PGE Funding resources and interventions in progress PLACE FUNDING Aglomerado da Serra INVESTMENT (MILLION R$) OBJECT Urbanization, construction and procurement of UH (housing unit), compensation, expropriation, social work, equipment and management PMI – BNDES 188,4 Vila Califórnia Saneamento para Todos – CEF 19,4 Vila São José PPI – CEF 115,0 Urbanization, construction and procurement of UH, indemnities, social work, expropriation, land tenure and management. Pedreira Prado Lopes PPI – CEF 49,0 Urbanization, construction and procurement of UH, indemnities, Urbanization, construction and procurement of UH, compensation, expropriation, social work, land regularization. locial work, expropriation, land tenure, management. Aglomerado Morro das Pedras BNDES / OGU 2006 / Pró-Moradia – CEF 119,7 OGU 2006 / Pró-Moradia – CEF 91,7 Urbanization, construction and procurement of UH, indemnities, social work, expropriation, land tenure and management. . Saneamento para Todos – CEF 15,3 Urbanization section of Avenida Belem (Bethlehem Avenue) and side streets, treatment of valley bottom, construction and procurement of UH, indemnities, social work. . Santa Terezinha Pró-Moradia – CEF 15,7 Urbanization stretch of Santa Teresa Street and cross streets, treatment of valley bottom, construction and procurement of UH, indemnities, social work. Várzea da Palma Pró-Moradia – CEF 200,8 São Tomás / Aeroporto Pró-Moradia – CEF 96,7 Vila Cemig / Alto das Antenas Pró-Moradia – CEF 47,5 Taquaril Vila Belém TOTAL Urbanization, construction and procurement of UH, indemnities, social work expropriation, land tenure and management 959,2 Urbanization, construction and procurement of UH, compensation, expropriation, social work and land tenure. construção ~ US$ 500 MILLION or ~ 300 MILLION EUROS VILA VIVA