Alstom Grid – Unidade RMG
Centro de Competência em Compensação
Reativa
Daniel Lacerda
Agosto 2011
GRID
Agenda
1 - EMPRESA: ALSTOM / Grid / PL ITR / Sub-PL PC / Unid. RMG
2 – Organização R&D
3 – Principais Projetos
4 – Problemas Encontrados
5 - Conclusões
6-Q&A
Apresentação ALstom - CRI Minas - Ago2011- P 2
Alstom Group – 3 Main Activities in 4 Sectors
Equipment & Services for Power Generation
Equipment & Services for Rail Transport
Alstom Transport
Alstom Power
Alstom Renewable Power
Equipment & Services for Power Transmission
Alstom Grid
Apresentação ALstom - CRI Minas - Ago2011- P 3
ALSTOM / Grid / PL ITR / Sub-PL PC / Unid. RMG
Alstom Grid – Product Lines (1/2)
AC SUBSTATIONS (up to 1200 kV)
Air/Gas-insulated switchgear
Offshore and onshore wind farms
Turnkey high voltage substations
Grid interconnection for all types
of generation
POWER ELECTRONICS ACTIVITIES
One of the leaders in HVDC Systems
Specialist in Flexible AC Transmission
Systems (FACTS): SVC, VSC, etc.
INSTRUMENT TRANSFORMERS
More than 200,000 equipments
Power Compensation Business
GAS-INSULATED SUBSTATIONS
& LINES (GIS & GIL)
2,000 substations GIS
Over 150 km single-phase GIL
SF6 reduction
POWER TRANSFORMERS
More than 130,000 MVA
1,000 transformers per year
World’s largest electric arc furnace
transformer
Apresentação ALstom - CRI Minas - Ago2011- P 4
ALSTOM / Grid / PL ITR / Sub-PL PC / Unid. RMG
Alstom Grid – Product Lines (2/2)
CIRCUIT BREAKERS
DISCONNECTORS
Over 80,000 equipments
8,000 solutions per year
Top three suppliers with Live Tank,
Dead Tank and compact modules
N°1 manufacturer
Over 140,000 units in more than
130 countries
SERVICES
From network design to asset evolution
From project to long-term partnerships
From emergency to predictive
maintenance
SUBSTATION AUTOMATION
SOLUTIONS
NETWORK MANAGEMENT
SOLUTIONS
MiCOM IED (Intelligent Electric Device)
Conventional and Digital Control Systems
(PACiS)
Worldwide leader in Energy
Management Systems (EMS)
Market Management Systems (MMS)
Distributed Management Systems (DMS)
Apresentação ALstom - CRI Minas - Ago2011- P 5
ALSTOM / Grid / PL ITR / Sub-PL PC / Unid. RMG
Instrument Transformers (ITR)
Sub-Product Lines
Instrument
Transformers (IT)
•
Current Transformers
(CT)
•
Inductive Voltage
Transformers (PT)
•
Capacitive Voltage
Transformers (CVT)
•
Combined Metering
Units
Power
Compensation (PC)
• Air-Core
• Line
Reactors
Traps
• Power
Capacitors
Bushings
Bushings for:
•
Transformers
•
Generators
• Capacitor
Banks
•
GIS
• Harmonic
Filters
•
Wall Bushings
• Active
Filters
Apresentação ALstom - CRI Minas - Ago2011- P 6
ALSTOM / Grid / PL ITR / Sub-PL PC / Unid. RMG
Digital
Instrument Transformers
AC/DC solutions
• Optical Current
Transformers
• Flexible Optical current
transformers
• Combined Metering
Unit
•
Power Compensation (PC)
Productive Sites
RMT (Tampere, Finland)
Air-Core Reactors
Power Capacitors
Capacitor Banks
Harmonic Filters
Active Filters
Protection Relays
RMM (Toluca, Mexico)
Power Capacitors
RMK (Hosur, India)
Line Traps
ITR Competency Center for
Air Core Reactors and Line Traps
RMG (Itajubá, Brazil)
Air-Core Reactors
Line Traps
2011:
Power Capacitors
Capacitor Banks
Harmonic Filters
Apresentação ALstom - CRI Minas - Ago2011- P 7
ALSTOM / Grid / PL ITR / Sub-PL PC / Unid. RMG
Unidade RMG - Produtos
RMG - Transformadores para Instrumentos de Alta
Tensão
Transformadores de Corrente, Potencial e Potencial Capacitivo,
isolamento tipo óleo, uso externo.
Nível de isolamento : até 765 KV
RBH
Reatores e Bobinas de Bloqueio
ACR :
LT
- Potência: até 100 MVAr por módulo
- Nível de isolamento : até 1300 kVp (Reatores em série)
: - Frequência: de 30 kHz a 500 kHz
- Indutância: tipicamente de 0.1 mH a 2.0 mH
BAT
High voltage switchgear
•Disjuntores
•Seccionadores Alta Tensão
•Pára-raios
Apresentação ALstom - CRI Minas - Ago2011- P 8
RMG Unit
Milestones
HAEFELY-ER
2006 RMG as Competence Center for Coils
1976 Line Traps
2004
1979 OSD Reactors
2008 Product Line of Power Compensation
1984 FED Reactors
2007 MCD Reactors
1999
2011 Power Capacitors
2010
1986
Apresentação ALstom - CRI Minas - Ago2011- P 9
ALSTOM / Grid / PL ITR / Sub-PL PC / Unid. RMG
Apresentação
Compensação Reativa
5140 m²
102
76 funcionários
funcionários
CAPACITORES DE POTÊNCIA
REATORES E BOBINAS DE BLOQUEIO
* Abril 2011
Apresentação ALstom - CRI Minas - Ago2011- P 10
Linha de Produtos
Capacitores
Reatores de Núcleo de Ar Características
Robustez
Baixo nível de ruído
Elevação de temperatura conservativa
Tratamento superficial especial
Possibilidade de instalação em áreas
compactas
Larga experiência no mercado doméstico
(Brasil) e mercado de exportação
Projeto certificado por diversos ensaios de
tipo (CEPEL, IREQ, KEMA e outros)
Apresentação ALstom - CRI Minas - Ago2011- P 11
Reatores de Núcleo de Ar
Open Style Design (OSD)
Fiber encapsulated design (FED)
Multi-wire cable design (MCD)
F
Apresentação ALstom - CRI Minas - Ago2011- P 12
Reatores de Núcleo de Ar
- Potência nominal:
- NBI:
Apresentação ALstom - CRI Minas - Ago2011- P 13
até 80 MVAr por módulo
até 1300 kVp (Reatores série)
Fornecedor completo de soluções em reatores
... programa completo de entrega e serviços ...
Reatores limitadores de corrente
Reatores de inrush
Reatores de aterramento de neutro
Reatores para fornos a arco
Reatores de alisamento (DC)
Reatores especiais para laboratórios
Reatores de filtros de harmônicas
Reatores sobressalentes
Reatores de compensação (shunt)
SVC
Apresentação ALstom - CRI Minas - Ago2011- P 14
Linha de Produtos
Bobinas de Bloqueio
Características
− Frequência: de 30 kHz a 500 kHz
− Indutância: tipicamente de 0.1 mH a 2.0
mH
− Construção leve
− Dispositivo de sintonia de altíssima
confiabilidade
− Possibilidade de instalação de dispositivos
de sintonia Alstom em bobinas de bloqueio
de outros fabricantes
− Larga experiência no mercado doméstico
(Brasil) e mercado de exportação
− Projeto certificado por diversos ensaios de
tipo (CEPEL, IREQ, KEMA e outros)
Apresentação ALstom - CRI Minas - Ago2011- P 15
Linha de Produtos
Capacitores
Capacitores de Potência
Tensão de 1 a 24 kV
Potências de 50 a 1000 kvar / 50 Hz (max
1200 kvar / 60 Hz)
Fusíveis internos ou sem fusíveis
Aplicações:
Bancos de Capacitores Shunt
Filtros de Harmônicos para Sistemas
Industriais e HVDC
SVC (Sistemas de Comp. Estática)
Compensação Série
Apresentação ALstom - CRI Minas - Ago2011- P 16
Linha de Produtos
Capacitores
Bancos de Capacitores Shunt
Controle de tensão para sistemas de
transmissão
Correção de fator de potência para
indústrias
Tensão até 145 kV
Potências de 500 kvar até 300 Mvar
Normalmente requer um reator de
amortecimento em série para limitar
transitórios de manobra
Apresentação ALstom - CRI Minas - Ago2011- P 17
Linha de Produtos
Capacitores
Filtros de Harmônicos
Correção de fator de potência para
indústrias
Controle do nível de distorção harmônica
do sistema
Tensão até 145 kV
Potências de até centenas de Mvar
Requer um reator em série para sintonia
com o banco de capacitores numa
determinada freqüência.
Apresentação ALstom - CRI Minas - Ago2011- P 18
Agenda
1 - EMPRESA: ALSTOM / Grid / PL ITR / Sub-PL PC / Unid. RMG
2 – Organização R&D
3 – Principais Projetos
4 – Problemas Encontrados
5 - Conclusões
6-Q&A
Apresentação ALstom - CRI Minas - Ago2011- P 19
Who is Who in Power Compensation (RMG Unit)
Apresentação ALstom - CRI Minas - Ago2011- P 20
Who is Who in Power Compensation (RMG Unit)
Renato Sarlas
Unit Director
Sales/Commercial
Engineering
Tendering
Application
Production
R&D
Marcos Soares
Sales Manager
Ricardo Campos
Supervisor
Marcelo Moraes
Supervisor
Daniel Lacerda
R&D Manager
Diego Pires
Tendering Engineer
Andre Lanza
Tendering Engineer
Mauro Yanase
Tendering Engineer
Solutions in Power Compensation
Technical Support for Customers
Technical Specification
Engineering Studies
Special Designs
Technical Training
Cesar Sene
Design Technician
Rodrigo Aprigio
R&D Engineer
Dirceu Sarto
Design Technician
Gustavo Pereira
R&D Technician
Rodrigo Quaresma
Design Technician
Jonas Roberty
Draftsman
Apresentação ALstom - CRI Minas - Ago2011- P 21
Who is Who in Power Compensation (Depto. DRD)
R&D and Engineering
DANIEL LACERDA
R&D
Engineering
Application
DANIEL LACERDA
MARCELO MORAES
RICARDO CAMPOS
OPERATIONS
New Products
Technology Transfer
Redesign to Cost
Research Projects
(modelisation, calculs., process, etc.)
Apresentação ALstom - CRI Minas - Ago2011- P 22
Customer orders
- Calculation
- Manufacturing sheets
- Configuration of BOM
Drawings
- Orders
- Quotations
- Manufacturing / components
- Packaging
BOM Management
- Master list
- Cost calculations / updates
Engineering KPI’s
Engineering databases
Type test reports database
Instruction manuals
Brochures
Archive
Tendering
(technical support, optimization, etc.)
Power Comp. Solutions
(spec. calc., seismic, solutions, etc.)
Customer Intimacy
(Support / Homologation / Customization)
Customer Feedback
(tech. marketing / competition / gaps )
Classificação dos projetos
Famílias de projeto
− Projetos ITR
• Transferência de tecnologia
• Desenvolvimento de novos produtos / linha de fabricação
− Projetos da unidade (FRM)
•
•
•
•
•
Re-design to cost
Cost Breakdown Analysis
Desenvolvimento de produtos / soluções especiais (nicho)
Melhorias de processo
Projetos curtos
− Estudos Técnicos
•
•
•
•
Pesquisa básica
Desenv./aperfeiçoamento de modelos de cálculos
Ferramentas de cálculo
Estudos de viabilidade
Apresentação ALstom - CRI Minas - Ago2011- P 23
Processos Regulares
− Relatório mensal de R&D (desenv. projetos, savings, etc.)
− Reuniões de validação / aprovação de projetos da unidade
− Atualização / avaliação de KPI’s
− ROM (Relatório de Oportunidades de Melhorias)
− FMEA (Failure Mode and Effects Analysis)
− Performance Indicators – CR(G)
− RATT (Relatório de Análise de Tecnologias e Tendências)
Apresentação ALstom - CRI Minas - Ago2011- P 24
Agenda
1 - EMPRESA: ALSTOM / Grid / PL ITR / Sub-PL PC / Unid. RMG
2 – Organização R&D
3 – Principais Projetos
4 – Problemas Encontrados
5 - Conclusões
6-Q&A
Apresentação ALstom - CRI Minas - Ago2011- P 25
Principais projetos realizados
1 – Desenvolvimento da Tecnologia MCD (CABLE)
• Desenvolvimento de produto novo para a empresa
• Business Plan (2.5 MBRL)
• 1999-2006-2008
2 – Programa de Cálculo de Ruído Audível (ACR NOISE)
• Modelo de cálculo (pesquisa básica) / software
• Parceria com Universidade (600 KBRL)
• 1999-2006-2008
3 – Reator Seco de Supressão de Arco (ATT)
• Desenvolvimento de novo produto para o mundo
• Demanda de cliente (< 100 KBRL)
• 2009
4 – TT Capacitores de Potência (BPC)
• Transferência de tecnologia
• Business Plan (6.5 MBRL)
• 2008-2010-2011
Apresentação ALstom - CRI Minas - Ago2011- P 26
1 – Desenvolvimento da Tecnologia MCD (CABLE)
Business Plan (2.5 MBRL)
1999-2006-2008
-
Processo industrial totalmente
novo
Junção de equipamentos de
diferentes indústrias
Software de projeto / modelos
de cálculo
Protótipos / validação
Obras civis (rearranjo do lay-out
da fábrica)
F
Resp.:
Equipe:
Apresentação ALstom - CRI Minas - Ago2011- P 27
Gerente R&D
- Eng. R&D
- Desenhista
2 – Programa de Cálculo de Ruído Audível (ACR NOISE)
Parceria com Universidade (600 KBRL)
1999-2006-2008
-
Ensaios de vibração
Modelo de cálculo teórico
Desenvolvimento de software
Validação em câmara semi-anecóica
Validação em massa
Resp.:
Equipe:
Engenheiro de Cálculos
- Universidade (1 + 1 + 1 + 1)
- Gerente R&D
Apresentação ALstom - CRI Minas - Ago2011- P 28
3 – Reator Seco de Supressão de Arco (ATT)
Demanda de cliente (< 100 KBRL)
2009
-
Solicitação de cliente
Mudança de conceito construtivo do produto
Diferentes tentativas fracassadas
Sucesso com solução simples
Produto “blockbuster”
Novo produto no mercado
Resp.:
Equipe:
Gerente de R&D
-
Apresentação ALstom - CRI Minas - Ago2011- P 29
4 – TT Capacitores de Potência (BPC)
Business Plan (6.5 MBRL)
2008-2010-2011
-
Complemento da linha de produtos da unidade em
compensação reativa
Transferência de tecnologia da fábrica da Finlândia
Plano de negócios completo
Resp.:
Equipe:
Engenheiro de R&D
- Especialista em produção
- Gerente de R&D
- Técnico Eletrotécnica
- Operários (2)
+ representantes de diversos departamentos
Apresentação ALstom - CRI Minas - Ago2011- P 30
Agenda
1 - EMPRESA: ALSTOM / Grid / PL ITR / Sub-PL PC / Unid. RMG
2 – Organização R&D
3 – Principais Projetos
4 – Problemas Encontrados (experiência Alstom)
5 - Conclusões
6-Q&A
Apresentação ALstom - CRI Minas - Ago2011- P 31
Business Plan
-
A parte mais difícil de calcular, prever (e depois cumprir) é o volume de vendas esperado e
respectiva margem de lucro. Informações de mercado são escassas e incertas.
-
Os demais itens de P&L podem ser muito bem cumpridos se analisados e previstos com o
nível de detalhamento apropriado.
-
O segundo grande risco é de se atingir uma situação de inviabilidade técnica do plano. O
estudo de viabilidade deve ser consistente (inclusive com protótipos) para novos produtos.
-
A avaliação do custo do projeto depende muito do estudo de viabilidade, se detalhado e
cotado suficientemente os principais elementos de custo.
-
Muitas vezes o movimento estratégico dos concorrentes e as mudanças de mercado
durante a implementação do plano são ignoradas no plano.
-
O monitoramento dos itens acima durante a implementação, visando eventuais ajustes de
rota, muitas vezes não é realizado ou não é sistemático.
-
A aprovação dos “Business Plan” em todas as esferas demora muitos meses (às vezes
anos). O prazo final costuma ser mantido ou minimamente postergado.
Apresentação ALstom - CRI Minas - Ago2011- P 32
Planejamento e gestão
-
Os projetos de inovação da Alstom não justificam a utilização de softwares robustos
como MSProject.
-
Os cronogramas raramente incluem alguma flexibilidade para eventos inesperados.
-
Prazo de entrega de fornecedores (principalmente maquinário) tem alto risco de falha.
Recomendável monitoramento constante dos principais fornecedores.
-
Pequenas melhorias / projetos curtos podem apresentar resultados significativos,
porém muitas vezes apresentam risco técnico. Deve-se encontrar o correto equilíbrio
entre simplicidade e validação.
-
Custos e prazos de lançamento comercial e homologação não devem ser esquecidos.
-
Apenas com dedicação exclusiva o projeto pode ser bem gerido. As metas de
faturamento se sobrepõem a qualquer projeto de R&D.
Apresentação ALstom - CRI Minas - Ago2011- P 33
Resultado
-
Toda validação possível deve ser realizada.
-
A validação de projetos/melhorias/alterações deve ser realizada em conjunto com
diversos departamentos.
-
A industrialização completa (princ. pequenos projetos) deve considerar todos os
detalhes:
- Propriedade intelectual
- Revisão de normas de projeto, fabricação e processo
- Documentos internos (princ. fabricação)
- Manuais e catálogos
- Ensaios de tipo (homologação)
- Ferramentas de cálculo, comerciais, etc.
- Treinamento (todos os envolvidos)
- Controle de entrada e saída de linha (carteira, estoques, etc.)
- Impacto da mudança em termos de estoque, entrega, processo, robustez,
ambiental e segurança, entre outros
- SWOT e (mais difícil) execução das ações de mitigação
Apresentação ALstom - CRI Minas - Ago2011- P 34
Agenda
1 - EMPRESA: ALSTOM / Grid / PL ITR / Sub-PL PC / Unid. RMG
2 – Organização R&D
3 – Principais Projetos
4 – Problemas Encontrados
5 - Conclusões
6-Q&A
Apresentação ALstom - CRI Minas - Ago2011- P 35
Conclusões gerais
-
A estrutura de R&D da ITR está baseada em Centros de Competência pulverizados nas
unidades, respeitando as diferentes origens tecnológicas.
-
A expertise diversificada não é satisfatoriamente aproveitada devido à dificuldade de
comunicação entre as unidades. Direção futura ?
-
A estruturação do Centro de Competência da unidade de Compensação Reativa da
RMG, principalmente com relação aos processos regulares previstos, está incompatível
com o tamanho do negócio e seus objetivos.
-
O principal fator de insucesso na gestão dos projetos está relacionada com a falta de
dedicação exclusiva da equipe de R&D. Metas de faturamento são sempre prioridade
máxima.
Apresentação ALstom - CRI Minas - Ago2011- P 36
RMG Unit
Address
Phone
Website
Av. Nossa Senhora da Piedade, 1021
Bairro Nações – Itajubá/MG – CEP 37504-358
+55 35 3629-7000
www.alstom.com
Alstom Grid
Cost-Efficient Power Quality
GRID
Download

Apresentação Alstom