ROTA Rede Óptica de Testes Avançados Paulo André – [email protected] © 2005, it - instituto de telecomunicações. Todos os direitos reservados. Motivation Implement a fully reconfigurable, flexible and bi-directional optical test-bed. Experimental characterization of transmission impairments at very high bit rates (exceeding 10 Gbit/s). Suitable to test optical nodes elements (dispersion compensator, OADMs, etc). Test over SMF (G.652), NZDSF (G.655) or mix links. Provide advanced formation to post graduation students 3º Workshop Telesal 2 5 e 6 de Junho de 2008 GIGA – 2.5 Gbit/s Universities IME PUC-Rio PUC-Campinas UERJ UFF UFRJ Mackenzie UNICAMP USP R&D Centers CBPF CPqD CPTEC INCOR CTA FIOCRUZ IMPA INPE LNCC LNLS 3º Workshop Telesal 3 5 e 6 de Junho de 2008 ACREO – 2.5 Gbit/s – 40 Gbit/s 3º Workshop Telesal 4 5 e 6 de Junho de 2008 VIOLA 3º Workshop Telesal 5 5 e 6 de Junho de 2008 GEANT 3º Workshop Telesal 6 5 e 6 de Junho de 2008 Existing Channel 10G Aveiro Coimbra Existing dark Fibers pairs Vermoim G652 Entroncamento Cetil G655 Lisboa Private Research Network Dispersion Compensation Amplifier Transponder TestBed for real optical networks: Remotely reconfigurable for different fibres (G652 e G655), Loop-backs and circulating-loops 3º Workshop Telesal 7 5 e 6 de Junho de 2008 UNIVERSITY ROTA Estação Braga U. Minho Rede Local Porto Estação Camanhã UNIVERSITY Supported by the FCCN network Estação Aveiro U. Aveiro Rede Local Coimbra Estação Coimbra B Estação Vermoil Estação Entroncamento Estação Setil Rede Local Lisboa Estação Oriente 3º Workshop Telesal 8 5 e 6 de Junho de 2008 Aveiro Instituto de Telecomunicações Coimbra Nokia Siemens Network Vermoil Estação Ferroviária Setil Entroncamento Oriente 3º Workshop Telesal 9 5 e 6 de Junho de 2008 Interconnection with the optical network laboratory (provided by Nokia Siemens Networks) FAROL platform 3º Workshop Telesal 10 5 e 6 de Junho de 2008 Deployed between the Instituto de Telecomunicações (Aveiro) and the Nokia Siemens Network (Lisboa), over the FCCN dark fibers, placed near the railway between Lisbon and Porto. 4 fibers, 2 ITU-T G.652 (Standard SMF) + 2 ITU-T G.655 (NZ-DSF). 2 Terminal nodes Aveiro and Oriente and 2 intermediate nodes, Coimbra and Entroncamento. 115.2 Km 58.1 Km Aveiro Coimbra 105.7 Km Entroncamento Oriente ITU-T G.655 IT ITU-T G.652 3º Workshop Telesal 11 5 e 6 de Junho de 2008 NSN Node schematic X IT Fibra Siemens Cabo X 4 SW1x2; 4 SW 1x4; 1 SW2x2 Add/Drop; 4 EDFA; DCM. 3º Workshop Telesal 12 5 e 6 de Junho de 2008 IT Fibra Siemens Cabo X 2 SW1x2; 2 SW1x4; 1 SW2x2 Add/Drop; 4 EDFA; DCM. 3º Workshop Telesal 13 5 e 6 de Junho de 2008 VPI Simulation (SMF-post compensation) Power meter Swept Atten. 2D RxBER C–E A-C SMF 58.1 km Back to Back DCF SMF 116.2 km DCF SMF 105.7 km DCF SMF 58.1 km DCF TX E-L SMF 105.7 km L-E E-C SMF 116.2 km DCF C-A Power meter Swept Atten. 2D RxBER 3º Workshop Telesal 14 5 e 6 de Junho de 2008 BER vs Received Power Results 1.00E-01 1.00E-03 1.00E-05 1.00E-07 B E R 1.00E-09 1.00E-11 1.00E-13 1.00E-15 1.00E-17 1.00E-19 -26 -24 -22 -20 -18 -16 Received Power (dBm) Post-Compensation NZDSF Pre-Compensation SMF Pre-Compensation NZDSF Post-Compensation SMF Aveiro -> Lisboa -> Aveiro 10 Gbit/s 3º Workshop Telesal 15 5 e 6 de Junho de 2008 -14 40 Gbit/s 1.00E-01 1.00E-03 1.00E-05 1.00E-07 B E R 1.00E-09 1.00E-11 1.00E-13 1.00E-15 1.00E-17 -29 -27 -25 -23 -21 -19 -17 -15 -13 -11 Received Power (dBm) NZDSF 3º Workshop Telesal 16 5 e 6 de Junho de 2008 Back to back SMF -9 -7 -5 3º Workshop Telesal 17 5 e 6 de Junho de 2008 Timeline Switches - boards production July - system test September - installation and field tests October – Initial utilization Future upgrades to 40 Gbit/s, connection to Metro networks – 2010. 3º Workshop Telesal 18 5 e 6 de Junho de 2008